7/30/2019 Tech Reqs Change Control v2-3
1/4
Change control from file BHS_ADSL2_Tech_Reqs_rev2.xls to file BHS_ADSL2_Tech_Reqs_rev3.xls
All the requirements number reflects the new additions and the suppressed requirements.
General Requirements
1. TR-GENRQQ-POWSU-012: Changed to CoC version 4 and informed to accomplish withlevels defined to tier 2012-2013
2. TR-GENRQQ-OPSTA-001: Added Led to Ethernet port and WPS functionality3. TR-GENRQQ-OPSTA-002: changed the Ethernet Led description informing that it
should be 1 frontal led for the four lan ports, and changed the category of the
requirement to informative
4. TR-GENRQQ-OPSTA-003: Changed the description of the requirement to let more clearthat it may be present individual leds for each Lan Ethernet ports on the back of the
equipment
5. TR-GENRQQ-CONNE-001: Changed to request only gold cover on the connectors -removed the text (or other similar material)
Physical_Layer_Requirements
1. TR-PHLRQ-WILAN-076 (new): support to Adaptive RF (automatic adjustment of signalpower and WiFi channel / bandwidth)
2. TR-PHLRQ-WILAN-077 (new): support Airtime Fairness functionality3. TR-PHLRQ-WILAN-078 (new): request of signal power of 3dBi4. TR-PHLRQ-WILAN-079 (new): no sequential MAC Address between LAN and WLAN
interfaces
5. TR-PHLRQ-WILAN-080 (new): requirement to supplier provide their plan to address theWPS vulnerability to Brute Force Attack attempts.
Link_Layer_Requirements
1. TR-LINRQ-GENRQQ-016: Changed to request support to all VPI/VCI with no restrictions- VPI Range for 0 to 255 and VCI from 0 to 65535. No limitations in VPI/VCI range (0/0
not valid, but 0/x or x/0 shall be valid)
-
7/30/2019 Tech Reqs Change Control v2-3
2/4
Change control from Technical Requirements present on the original BHS ADSL tender
All the requirements number reflects the new additions and the suppressed requirements.
General Requirements
1. TR-GENRQ-MECDE-007: informed position for the reset button2. TR-GENRQ-POWSU-001: added voltage description for O2UK3. TR-GENRQ-POWSU-006: changed figure for Argentina power supply connector,
removed China reference and added figure for Spain power supply
4. TR-GENRQ-POWSU-010 (new requirement): power consumption requirement5. TR-GENRQ-POWSU-011 (new requirement): CoC requirement and DC connector
characteristics.
6. TR-GENRQQ-POWSU-012 (new requirement): request of conformity with UniversalPower Supply documentation from Telefonica
7. TR-GENRQ-OPSTA-003 (new requirement): Optional led in the back for each LAN port8. TR-GENRQ-OPSTA-004 (new requirement): indication of firmware update description9. TR-GENRQ-ELCHA-003 (new requirement): POTS requirements applicable to ADSL
modems when connected to an analogue presented PSTN line
10.TR-GENRQ-SECPR-004 (new requirement): user safety certification and associatedreports request
11.TR-GENRQ-FREEF-001: actualization of the free fall standard12.TR-GENRQ-PPCAS-010: changed to request that the IEEE 802.11n WECA Certification
be compliance with the last available version
Physical_Layer_Requirements
1. TR-PHLRQ-WANTC-011 (new requirement): inclusion of annex L for the G.992.5(ADS2+) - Extended Range ADSL2+
2. TR-PHLRQ-WANTC-017 and 018 (new requirements): details of ANSI T1.413 (ADSL)implementation
3. TR-PHLRQ-WANTC-025 (new requirement): Management Plane Procedurerequirement description
4. TR-PHLRQ-WANTC-027 (new requirement): added details regarding powermanagement implementation according to the standard G.992.3
5. TR-PHLRQ-WANTC-028 (new requirement): requested accordance to the framereducing overhead defined on the standard G.992.3
6. TR-PHLRQ-WANTC-052 (new requirement): requested accordance to the reducedoverhead with merged fast and sync bytes" defined on standard G.992.1
7. TR-PHLRQ-LANET-002: changed to be Fast Ethernet interface (it was Ethernet / FastEthernet)
8. TR-PHLRQ-WILAN-004: Removed IEEE 802.11a compatibility request (it operates on5.8GHz frequency incompatible with 2.4GHz frequency required)
9. TR-PHLRQ-WILAN-015: changed to external antennas10.TR-PHLRQ-WILAN-016 (new requirement): possibility to offer internal antennas as long
as proved that there is no loss of coverage by local tests with the OBs.
11.TR-PHLRQ-WILAN-033 (new requirement): Request to support extended ASCIIcharacters
-
7/30/2019 Tech Reqs Change Control v2-3
3/4
12.TR-PHLRQ-WILAN-051: added request for EAP peer and authenticator authorizationsupport (RADIUS authentication)
13.TR-PHLRQ-WILAN-060 (new requirement): request to support MAC addresses self-learning of wireless clients
14.TR-PHLRQ-WILAN-062: clarified that the characters on the default SSID must be onupper case.
Link_Layer_Requirements
1. TR-LINRQ-GENRQ-019: requested capability to map PVC to WLAN interface also2. TR-LINRQ-GENRQ-020 (new requirement): requested the possibility to map a single
PVC to more than one interface
3. TR-LINRQ-GENRQ-048: added support to [RFC 2865], [RFC 2869]Network_Layer_Requirements
1. TR-NETRQ-IPCON-002: added information regarding IPv6 Support2. TR-NETRQ-IPCON-003 to 010 (new requirements): general requirements for
implement IPv6
3. TR-NETRQ-ROUTI-025 to 037 (new requirements): added details to basic routing RFCsto assure the right functionality of routing function
Network_Layer_Requirements_IPv6
Added new chapter to detail IPv6 requirements
CPE_Management
1. TR-CPEMG-GENRQ-009: added WPA22. TR-CPEMG-GENRQ-026: detailed as double image or rescue image support
requirement
3. TR-CPEMG-GENRQ-034: Google Chrome 2.0 support added4. TR-CPEMG-GENRQ-064 (new requirement): support to SNMP and TR simultaneously5. TR-CPEMG-TR069-032 (new requirement): minimum TR069 configuration required6. TR-CPEMG-TR069-033 (new requirement): TR connection characteristics required7. TR-CPEMG-TR069-034 (new requirement): SSL support8. TR-CPEMG-TR069-035 (new requirement): minimum time for establishing new
connection (TR and SSL)
Other Features
1. TR-OTHER-GENRQ-008: changed base Flash memory from 4MB to 8MB (changedduring Q&A)
2. TR-OTHER-GENRQ-009 (new requirement): added optional requirement to generateWLAN configuration as QR-CODE picture
3. TR-OTHER-SERRQ-010: clarified that the BHS must switch back from 3G to ADSLconnection when ADSL available
-
7/30/2019 Tech Reqs Change Control v2-3
4/4
4. TR-OTHER-SERRQ-019: complemented information regarding print sharing accordingto commercial text of the RFQ
5. TR-OTHER-SERRQ-020 (new requirement): added sharing information description asrequested on commercial text of RFQ
6. TR-OTHER-SERRQ-023: added details to DLNA request7. TR-OTHER-SERRQ-024: added details to UPNP request8. TR-OTHER-SERRQ-045 (new requirement): request to implement wizard configuration9. TR-OTHER-SERRQ-046 (new requirement): request to a minimum space of memory for
store the GUI
10.TR-OTHER-SERRQ-047 (new requirement): request to each OB to inform defaultconfiguration
Annex
1. TR-GENRQ-ELECO-007 (new requirement): Electromagnetic certification for Argentina2. TR-GENRQ-ELECO-008 (new requirement): Electromagnetic compatibility for Spain3. TR-GENRQ-ELECO-009 (new requirement): Electromagnetic compatibility for UK4. TR-GENRQ-PACKA-005 (new requirement): Description of a configuration CD
requested by Telesp
5. TR-GENRQ-PACKA-006 (new requirement): Compliance with Telesp specification forpackaging
6. TR-GENRQ-PPCAS-005 to 013 (new requirements): Ethernet cable characteristics forArgentina and Brazil
7. TR-GENRQ-PPCAS-014 to 018 (new requirements): RJ11 cable characteristics for Brazil8.
TR-GENRQ-OTHER-003 (new requirement): Homologation request from Chile on localgovernmental departments.
9. TR-IPV6-GENRQ-001 (new requirement): 6RD request and details for IPv6implementation at Spain
10.TR-CPEMG-GENRQ-001 (new requirement): Double image support for firmwareupdate for Spain
11.TR-CPEMG-GENRQ-002 (new requirement): Motive certification request for LATAM(TR069)
12.TR-CPEMG-GENRQ-003 (new requirement): Indra certification request for TdE (TR069)13.TR-CPEMG-GENRQ-004 (new requirement): deadline for delivery certification14.TR-CPEMG-GENRQ-005 and 006 (new requirements): local requirements for TR069
implementation