teaser portfolio
DESCRIPTION
A short architecture portfolio illustrating a couple projects.TRANSCRIPT
mobile: 661.343.9531email: [email protected]
Perriann HodgesMontgomery High School Gym Best Value Project Competition with Davy Architecture
mobile: 661.343.9531email: [email protected]
Perriann Hodges
20124 WeeksRevit, Photoshop, Illustrator, 45,000 Sq FtDavy ArchitectureLusardi ConstructionKTU+A Landscape
YearTime
ProgramSize
Collaboration
Assisted in the production of competition-quality renderings, graphics and layouts for a final presentation to the school district. Tasks include but not limited to interior perspectives, exterior perspectives, site plan, floor plans, building sections, board layouts, presentation format, generation of a revit walkthrough, and 3D modeling in revit.
Montgomery High School Gym Best Value Project Competition with Davy Architecture
mobile: 661.343.9531email: [email protected]
Perriann HodgesThe NewDorms of Architecture & Design School Project Proposal
mobile: 661.343.9531email: [email protected]
Perriann Hodges
AssignmentYearTime
ProgramSize
Collaboration
The NewDorms of Architecture & Design is situated right in the mecca of the NewS-chool campus. The high rise facilitates dorm rooms for graduate and undergraduate students. 8 four story atrium gardens allowing students to grow food just steps from their home. Other facilities through out the high rise include a gallery space, workshop, cafe, restaurant, and art store.
The NewDorms of Architecture & Design School Project Proposal
Studio Assignment201010 WeeksRevit, Photoshop200,000 Sq FtGroup Project
mobile: 661.343.9531email: [email protected]
Perriann HodgesSoccer Facility Competition
mobile: 661.343.9531email: [email protected]
Perriann Hodges
AssignmentYearTime
ProgramSize
Collaboration
A sign of hope and a sense of community will develop in Buenos Aires around the soccer facility. Due to extenuating circumstances, the facility does not have electri-cal or water hook ups and must be self sustaining. Also, the budget is limited to a total of 45,000 USD. Construction of phase one is to be finished in 3 months, and phase two in another 6 months.
Soccer Facility Competition
Buenos Aires Competition20114 WeeksRevit, Photoshop2,000 Sq FtGroup Project
mobile: 661.343.9531email: [email protected]
Perriann HodgesCultural Center School Project Proposal
mobile: 661.343.9531email: [email protected]
Perriann Hodges
AssignmentYearTime
ProgramSize
Collaboration
Cultural Center for the LGBT Community with a small health clinic, restaurant, art gallery, library, and educational center.
Cultural Center School Project Proposal
Studio Assignment20107 WeeksRevit, Photoshop250,000 Sq FtIndividual Project