team no.55 qwerty engineering

2
Wu Wu Wu Wu Zhi Zhi Zhi Zhi Qiao Qiao Qiao Qiao Bridge Design Competition 1 D D DESIGN ESIGN ESIGN ESIGN C C CONCEPT ONCEPT ONCEPT ONCEPT 2 S S SUSTAINABILIT USTAINABILIT USTAINABILIT USTAINABILIT 1 D D DESIGN ESIGN ESIGN ESIGN C C CONCEPT ONCEPT ONCEPT ONCEPT Our team has adopted a scheme of bamboo arch with suspended deck. Inspired by the swaying of bamboos during breeze,thesinglearchwillhavetheirtwosupportsondifferent sides of the deck. This is to mimic the ability of bamboos to sway in all directions of its longitudinal axis . S S SUSTAINABILIT USTAINABILIT USTAINABILIT USTAINABILIT Locally available materials are used for the br shoes for the arch are the only component th specialtechnologyfromcontractor.However, this assignment. Also, the shoes are not heavy a carried manually . Installation requires a small drillin sway in all directions of its longitudinal axis . Bridge deck is to be supported by two main longitudinal beams. Each beam is made of two bamboos poles tied together to increase the beam shear and bending capacities. Structural robes (nylon or organic) that can be found from the nearbytownareusedtotiethemaindecktothearch.Bamboo cross beams and bamboo mat (interlaced bamboo strips) will carried manually . Installation requires a small drillin thatcanbeeasilytransportedtothesiteby villager Skills that exist amongst villagers (tying, splitting arerequiredforthebridgeconstruction. Treatedbamboocanlastforabout10years.To 10mm-diamterholeswillbeintroducedatthe bot slots to channel any rain water away . This is to en cross beams and bamboo mat (interlaced bamboo strips) will completethedecking. Steel shoes of nine-hole slot will be used to support the bamboo arch. The base plate will be bolted to competent volcanicrockon the riverbanks. The span of the bridge deck willbeincreasedto22mtoensurethatanallowanceofabout 1 m from the river bank is achievable for the base plates . slots to channel any rain water away . This is to en components of the arch are dry throughout the hencedecompositionwillnottakeplace. Thedeckisabove4.5maboveriverbed.This is the deck will not be washed away even when levelreachesitsmaximum. With the new bridge, transportation of goods 1 m from the river bank is achievable for the base plates . With the new bridge, transportation of goods agricultural work and better access to the m healthcarewillimprovethelivelihoodofthe villager Bamboo has been part of life of Mixia people. The villagers have been using the material have been using the material in the construction of houses, fences, water channels and even for the existing bridge. Our vision is to integrate this fascinating renewable fascinating renewable resource further into the people’s life and hence bamboo will be used in most of the structural components of the new bridge. new bridge. QWERTY Design Team TY TY TY TY 3 B B BAMBOO AMBOO AMBOO AMBOO T T TREATMENT REATMENT REATMENT REATMENT TY TY TY TY bridge . Steel hat required s isaone-off and can be ng machine T T TREATMENT REATMENT REATMENT REATMENT As bamboo is susceptible to pestattack,treatmentisrequired. Fresh bamboo will be submerged in water for about 6 weeks . The river can be a good ng machine rs . g bamboos) ensurethis, ttoms ofthe nsure that all weeks . The river can be a good option for the purpose as treatmentinstagnantwatertends tocreatefoulsmellandeffectively pollute the water body. The immersion is to remove bamboo nourishment that is attractive to nsure that all he year and s theensure river water s, cattle for nourishment that is attractive to insects. Thebambooisthenair-driedfor another 6 weeks before being usedfortheconstruction. s, cattle for market and rs .

Upload: arup-cause

Post on 22-Mar-2016

235 views

Category:

Documents


0 download

DESCRIPTION

Team No.55 QWERTY Engineering

TRANSCRIPT

Wu Wu Wu Wu ZhiZhiZhiZhi QiaoQiaoQiaoQiaoWu Wu Wu Wu ZhiZhiZhiZhi QiaoQiaoQiaoQiaoBridge Design Competition

1 DDDDESIGNESIGNESIGNESIGN CCCCONCEPTONCEPTONCEPTONCEPT 2 SSSSUSTAINABILITYUSTAINABILITYUSTAINABILITYUSTAINABILITY1 DDDDESIGNESIGNESIGNESIGN CCCCONCEPTONCEPTONCEPTONCEPT•Our team has adopted a scheme of bamboo arch withsuspended deck. Inspired by the swaying of bamboos duringbreeze, the single archwill have their two supports on differentsides of the deck. This is to mimic the ability of bamboos tosway inalldirectionsof its longitudinal axis.

2 SSSSUSTAINABILITYUSTAINABILITYUSTAINABILITYUSTAINABILITY•Locally available materials are used for the bridgeshoes for the arch are the only component thatspecial technology fromcontractor.However, thisassignment. Also, the shoes are not heavy andcarriedmanually. Installation requires a small drillingsway inalldirectionsof its longitudinal axis.

•Bridge deck is to be supported by two main longitudinalbeams. Each beam is made of two bamboos poles tiedtogether to increase the beam shear and bending capacities.Structural robes (nylon or organic) that can be found from thenearby townareusedtotie themaindeck to thearch.Bamboocross beams and bamboomat (interlaced bamboo strips) will

carriedmanually. Installation requires a small drillingthatcanbeeasily transported to thesitebyvillagers•Skills that exist amongst villagers (tying, splittingarerequired for thebridgeconstruction.•Treatedbamboocan last forabout10years.To10mm-diamter holeswill be introduced at the bottomsslots tochannel any rainwateraway.This is toensurecross beams and bamboomat (interlaced bamboo strips) will

complete thedecking.•Steel shoes of nine-hole slot will be used to support thebamboo arch. The base plate will be bolted to competentvolcanic rock on the river banks. The span of the bridge deckwill be increased to 22m to ensure that an allowance of about1mfromtheriverbank isachievable for thebaseplates.

slots tochannel any rainwateraway.This is toensurecomponents of the arch are dry throughout thehencedecompositionwill not takeplace.•Thedeck is above4.5mabove river bed.This isthe deck will not be washed away even whenlevel reaches itsmaximum.•With the new bridge, transportation of goods,1mfromtheriverbank isachievable for thebaseplates. •With the new bridge, transportation of goods,agricultural work and better access to the markethealthcarewill improve the livelihoodof thevillagers

Bamboo has been part of life of Mixia people. The villagers have been using the material

“have been using the material in the construction of houses, fences, water channels and even for the existing bridge. Our vision is to integrate this fascinating renewable

fascinating renewable resource further into the people’s life and hence bamboo will be used in most of the structural components of the new bridge.

new bridge.

QWERTY Design Team

USTAINABILITYUSTAINABILITYUSTAINABILITYUSTAINABILITY 3 BBBBAMBOOAMBOOAMBOOAMBOOTTTTREATMENTREATMENTREATMENTREATMENT

USTAINABILITYUSTAINABILITYUSTAINABILITYUSTAINABILITYbridge. Steelthat required

this is aone-offand can be

drillingmachine

3TTTTREATMENTREATMENTREATMENTREATMENT

•As bamboo is susceptible topest attack, treatment is required.Fresh bamboo will besubmerged in water for about 6weeks. The river can be a gooddrillingmachine

villagers.splitting bamboos)

ensure this,bottoms of theensure thatall

weeks. The river can be a goodoption for the purpose astreatment instagnantwater tendstocreate foul smell andeffectivelypollute the water body. Theimmersion is to remove bamboonourishment that is attractive toensure thatall

the year andis the ensureriver water

goods, cattle for

nourishment that is attractive toinsects.•The bamboo is then air-dried foranother 6 weeks before beingusedfor theconstruction.

goods, cattle formarket and

villagers.

ConstructionMethod