team news letter

8
12/24/13 TEAM Newsletter teamgroup.co.th/newsletter/1303/EN/ourteam.html 1/8 July 2013 marks the 35 th anniversary of TEAM GROUP. Since the commencement of its operations, TEAM GROUP has committed and dedicated to garnering a reputation as a professional integrated consulting firm and related business solutions. TEAM GROUP has been entrusted with involvement in more than 2,000 important projects by both public and private agencies, in Thailand and beyond. In this issue of TEAM GROUP Newsletter, we have compiled a list of outstandingly successful projects which cover eight areas of expertise: transportation and logistics; water resources; environmental management; environmental engineering; building and infrastructure; energy; management and training; communications and public participation. Study and Detailed Design of High Speed Train from Bangkok - Chiang Mai Project (Phase 1: Bangkok - Phitsanulok) Feasibility Study, Detailed Design, EIA, PR and PP activities for the Mass Rapid Transit System for Bangkok Metropolis (Green Line Extension) - Mo Chit - Saphan Mai - Lam Lukka - Bearing - Samut Prakan - Bang Pu Detailed Design and Construction Supervision of Red Line Commuter Train Project (Bang Sue – Taling Chan) Feasibility Study and Detailed Design of Laem Chabang Port, Phase 3

Upload: team-group-of-companies

Post on 26-May-2015

69 views

Category:

Business


2 download

TRANSCRIPT

Page 1: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 1/8

July 2013 marks the 35th anniversary of TEAM GROUP. Since the commencement ofits operations, TEAM GROUP has committed and dedicated to garnering areputation as a professional integrated consulting firm and related businesssolutions. TEAM GROUP has been entrusted with involvement in more than 2,000important projects by both public and private agencies, in Thailand and beyond. Inthis issue of TEAM GROUP Newsletter, we have compiled a list of outstandinglysuccessful projects which cover eight areas of expertise: transportation andlogistics; water resources; environmental management; environmental engineering;building and infrastructure; energy; management and training; communications andpublic participation.

Study and Detailed Designof High Speed Train fromBangkok - Chiang MaiProject (Phase 1: Bangkok- Phitsanulok)

Feasibility Study, Detailed Design, EIA,PR and PP activities for the Mass RapidTransit System for Bangkok Metropolis

(Green Line Extension)- Mo Chit - Saphan Mai - Lam Lukka- Bearing - Samut Prakan - Bang Pu

Detailed Design and ConstructionSupervision of Red Line Commuter TrainProject (Bang Sue – Taling Chan)

Feasibility Study and Detailed Design of Laem Chabang Port, Phase 3

Page 2: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 2/8

Detailed Design of Inter-city Motorway(Bang Pa In – Nakhon Ratchasima)

Traffic Management Consulting Services(Fashion Island, Future Park (Rangsit),

Terminal 21, Asiatique, Gateway Ekamai)

IEE and EIA for the Hongsa Power Plant,Mining Development and Transmission

Line, Lao PDR

Master Plan Study of Integrated WaterResources Development and Management

and Irrigation Improvement for the 9th

National Economic and Social DevelopmentPlan

Construction Supervision of Drainage Tunnel(Saen Saep and Lat Phrao Canals - ChaoPhraya River)

Feasibility Study and EIA of Pasak JolasidDam, Lop Buri

Page 3: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 3/8

Study, Design and Construction Supervisionof Flood Protection and Drainage System

for Industrial Estates and Private Sector

Engineering Design, EMP, RAP,Independent Engineer and ConstructionSupervision of Nam Ngum 2 HydroelectricPower Project, Lao PDR

IEE and EIA for the Hongsa Power Plant,Mining Development and Transmission

Line, Lao PDR

EIA for the Regional Gas Pipeline toNakhon Sawan

EHIA for the Mae Moh Lignite Mine Project,Lampang

Page 4: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 4/8

EHIA for the Replacement of Units 4 – 7 atMae Moh Power Plant, Lampang

IIEE and Environmental Studies for Dawei Sea Port and Industrial Estate

Development

Construction Supervision and Contract Management for Turnkey

Construction of the Bangkok WastewaterTreatment Project

Improvement of Wastewater TreatmentPlant of Klaeng Aquatic Processing FoodPlant in Klaeng District, Rayong

Master Plan and Feasibility Studyfor Water Supply System Improvement

in Surat Thani

Detailed Design and ConstructionSupervision of Metropolitan WaterTreatment Plants

Feasibility Study and Detailed Designof Solid Waste Disposal Center,

Khon Kaen Municipality

Page 5: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 5/8

Architectural, Engineering and LandscapeDesign, and Renovation Design of the

NIMT’s Chemical Metrology Laboratory,Pathum Thani

Design of the Renaissance Boutique HotelPhnom-Penh, Cambodia

Turnkey Service of a New PharmaceuticalPlant of Atlantic Laboratories Corporationi

Architectural and Engineering Design, andConstruction Supervision of the Vandapac’sProduction Facility

Detailed Design, Project Managementand Construction Supervision ofBen Tre Fish Meal Factory and Hue Shrimp Factory in Vietnam

Engineering Design and ConstructionManagement and Supervision of Cargill

Integrated Poultry Processing Complex inNakhon Ratchasima

Owner Engineer and Lender Engineerfor the 400,000 LPD Ethanol Plant Project,

Ubon Ratchathani

Page 6: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 6/8

Project Management and ConstructionSupervision of the 110 MW NavanakornPower Plant, Pathum Thani

Construction Supervision of PTTARLaboratory Building, Rayongi

Technical Due Diligence of the PhetchaburiOil Termina

Engineering Services forMagotteaux Facility in

Nong Khae District,Sara Buri

Project Management and ConstructionSupervision of the Second Royal Thai Mint

in Khlong Luang District, Pathum Thani

Study, Planning, and Project Managementfor the New Tobacco Factory Project, Phra

Page 7: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 7/8

for the New Tobacco Factory Project, PhraNakhon Si Ayutthaya

Project Management and ConstructionSupervision of the 13th Asian GamesSportsComplex at Thammasat University Rangsit

Campus, Pathum Thanii

Project Management and ConstructionSupervision of Suvarnabhumi Airport

Project Management and ConstructionSupervision of the Government ComplexCommemorating His Majesty the King’s

80th BirthdayAnniversary, 5th December,B.E. 2550 (2007)

Exquisite Publications

Market Sounding Session for High SpeedRail Projects for Thailand

Page 8: TEAM News letter

12/24/13 TEAM Newsletter

teamgroup.co.th/newsletter/1303/EN/ourteam.html 8/8

Accomplished Public Relations Action PlanTargeting Local Residents around

Suvarnabhumi Airport

Exhibitions at Sanam Luang in Celebrationof Its Major Renovation