Team 8: Grand River Rapids. Aaron Vanderhill. Jim Barron. Jeff Van Laar. Tom Marshall. Background. Kayakers and Canoeists have shown interest Grand Rapids Whitewater Revitalization of Downtown Recreational course not only for experienced kayakers. Project Overview. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/1.jpg)
Team 8: Grand River Rapids
Aaron Vanderhill Jim Barron Jeff Van Laar Tom Marshall
![Page 2: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/2.jpg)
Kayakers and Canoeists have shown interest
Grand Rapids Whitewater
Revitalization of Downtown
Recreational course not only for experienced
kayakers
Background
![Page 3: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/3.jpg)
Return the Grand River to a more natural state
Project Overview
![Page 4: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/4.jpg)
Eliminate dangerous hydraulic at 4th street dam
Design entry and exit locations for kayakers
Project Overview
![Page 5: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/5.jpg)
Increase entry and exit points Partial Replacement of dams Stair Step modification of the
4th Street Dam Reasons
◦ Meets client’s needs◦ Improves fish habitat◦ Other alternatives not feasible
Sediment behind 4th Street Dam
Would look unnatural Greater costs
Final Design
![Page 6: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/6.jpg)
Entry & Exit Points
Increase Usability
Safety
Site Plan
![Page 7: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/7.jpg)
Four Entry and Exit Points
Canal Street Park
Fulton Street
Fish Ladder Park
Ford Museum
![Page 8: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/8.jpg)
Project Location
![Page 9: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/9.jpg)
Flow Rate◦ River used between April and November◦ Low flow = 1,700 cfs
Beautification dams◦ High flow = 50,000 cfs (100 year storm)
Legal issues◦ Design flow of 3,300 cfs
Modeling Decisions
![Page 10: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/10.jpg)
Modeling Accuracy◦ Not taught in class
◦ Rocks & boulders as series of weirs
◦ California Department of Transportation
Modeling Decisions
![Page 11: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/11.jpg)
Stair Step Solution
Safety Hazard
4th Street Dam
![Page 12: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/12.jpg)
Demonstration
![Page 13: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/13.jpg)
Downstream ModificationsBefore After
•Dam modification creates rapids
![Page 14: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/14.jpg)
Dam #4Completely remove and replace with boulders. Create two gaps for kayakers and boaters to pass through.
![Page 15: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/15.jpg)
Dam #3Remove section in middle of dam to allow kayakers to pass through. Add boulders to create natural appearance and rapids.
![Page 16: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/16.jpg)
Dam #2Completely remove the dam to eliminate flooding problems caused upstream by the stair step structure.
![Page 17: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/17.jpg)
Dam #1This dam will remain intact to maintain minimum water level during low flow seasons.
![Page 18: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/18.jpg)
HEC-RAS Results: Low Flow
16750 17250 17750 18250 18750 19250 19750 20250 20750 21250 21750585
590
595
600
605
610
615
620
Low Flow Water Surface Elevation (1,700 cfs)
CurrentModifiedWest LeveeEast Levee
River Station
Wat
er S
urfa
ce E
leva
tion
(ft)
![Page 19: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/19.jpg)
HEC-RAS Results: Design Flow
16750 17250 17750 18250 18750 19250 19750 20250 20750 21250 21750585
590
595
600
605
610
615
620
Design Flow Water Surface Elevation (3,300 cfs)
CurrentModifiedWest LeveeEast Levee
River Station
Wat
er S
urfa
ce E
leva
tion
(ft)
![Page 20: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/20.jpg)
HEC-RAS Results: 100 Year Storm
16750 17250 17750 18250 18750 19250 19750 20250 20750 21250 21750611
612
613
614
615
616
617
618
619
100 yr Water Surface Elevation (50,000 cfs)
CurrentModifiedWest LeveeEast Levee
River Station
Wat
er S
urfa
ce E
leva
tion
(ft)
![Page 21: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/21.jpg)
Total cost of $2,529,000
◦ Site Planning: $67,000◦ Stair-step: $105,000◦ Downstream Dams: $1,774,000◦ Contingency (30%): $583,000
Cost
![Page 22: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/22.jpg)
City of Grand Rapids has approved project idea
Turn our design over to GRWW Raise the funds Final Engineering design
◦ Possible 100 year flood issues because of the stair step Levee analysis Easements
Future of the Project
![Page 23: Team 8: Grand River Rapids](https://reader035.vdocuments.mx/reader035/viewer/2022062323/568165aa550346895dd892fd/html5/thumbnails/23.jpg)
Claire Schwartz – Industrial Consultant, FTC&H
Chip Richards, Chris Muller (GRWW)
Wendy Ogilvie, FTC&H
Professor De Rooy - Team Advisor
Steve Elliot, Jason VanderKodde, Steve Waalkes, CEAC Reviewers
Acknowledgments