teaching and learning refurbishments summer 2011 robinson library cluster old library building oula...
TRANSCRIPT
TEACHING AND LEARNING REFURBISHMENTS SUMMER 2011
ROBINSON LIBRARY CLUSTEROLD LIBRARY BUILDING OULA CLUSTERBEDSON TEACHING CENTRE LT 1.46KING GEORGE VI LT 5 KING GEORGE VI 1.11 & 1.12 PLUS NUMEROUS MINOR IMPROVEMENTS TO ROOMS ACROSS CAMPUS
Estates Support Service & ISS
Robinson Library
Before
Robinson Library
Before
Robinson Library 2011
Robinson library 2011
Robinson Library 2011
Old Library Building entrance to cluster
Before – access corridor After – quick access stations installed
Old library building cluster
Before
Old Library cluster 2011
Old library cluster 2011
Old library cluster 2011
Old library cluster – social learning
Old library cluster – laptop clinic
Bedson 1.46 Before
Bedson 1.46 2011
Bedson 1.46 2011
Bedson 1.46 2011
KGVI LT 5 – Before
KGVI LT5 2011
KGVI LT5 2011
KGVI 1.11 & 1.12 2011
FURNITURE ALTERATIONS TO IMPROVE ROOM LAYOUTS
PERCY BUILDING BOARDROOM STYLE LAYOUTS ROOMS G9, G10, 1.05, 1.19 & 2.24BEDSON TEACHING CENTRE BOARDROOM STYLE B29 & B30KGVI 1.17B GROUP WORKING TABLES
Estates Support Service and Timetabling Services
Percy G10
Before – 38 capacity
Percy G10
After – Reduced capacity to 24 and improved layout to suit teaching
Percy Seminar room G1.05
Before After
Change the furniture to suit the preferred teaching style
Percy 1.09 & 2.24 capacity 24
New boardroom tables