te fhwa update to the a aashto jtcp fhwsp.design.transportation.org/documents/jtc...

123
ate ate A Upda A Upda FHWA Update to the AASHTO JTCP FHW A FHW A AASHTO JTCP TCP TCP – Web Briefing HTO JT HTO JT April 14, 2011 Pt St h AASH AASH Pete Stephanos 202-366-0027 Peter Stephanos@dot gov Peter.Stephanos@dot.gov

Upload: vankien

Post on 05-Apr-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

FHWA Update to the AASHTO JTCP

FHW

AFH

WA AASHTO JTCP

TCP

TCP

–– Web Briefing

HTO

JT

HTO

JT

April 14, 2011P t St h

AA

SHA

ASH Pete Stephanos

202-366-0027Peter Stephanos@dot [email protected]

Page 2: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Agenda – FHWA UpdateU

pdat

Upd

atg p FY2012 DOT Proposed Budget - Pavements Performance Management Initiatives

FHW

A U

FHW

A U Performance Management Initiatives

Infrastructure Health Assessment Project Update Pavement Type Selection/Alternate Bidding Update

CP

CP

––FF Pavement Type Selection/Alternate Bidding Update

MEPDG Related Issues New FHWA Sustainable Highways Tool

TO J

TCTO

JTC Initiative Updates

Warm Mix Asphalt Step Frequency GPR

AA

SHT

AA

SHT Safety Edge Concrete Overlays High RAP Mixtures

Asphalt Mixture Perf Tester Friction Loan Program Intelligent Compaction

AA

Page 3: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

DOT Proposed FY2012

FHW

AFH

WA DOT Proposed FY2012

Budget and Program

TCP

TCP

––

udge a d og a

P t St h

HTO

JT

HTO

JT Pete Stephanos

[email protected]

AA

SHA

ASH

[email protected]

Page 4: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FY2012 DOT Proposal HighlightsU

pdat

Upd

at

Proposal provides funding to:• Modernize our highway system and create jobs

FHW

A U

FHW

A U • Modernize our highway system and create jobs.

• Focus investment on safety, state of good repair, and livability.

CP

CP

––FF • Establish a performance-based highway program.

• Encourage innovations that will shorten project d li d l t th d l t f

TO J

TCTO

JTC delivery and accelerate the deployment of new

technologies.• Simplify the highway program structure by

AA

SHT

AA

SHT Simplify the highway program structure by consolidating over 55 programs to 5 core programs.

AA

Page 5: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FY 2012 OverviewU

pdat

Upd

at

Core Federal-aid highway programs• Safety ($2 5 billion)

FHW

A U

FHW

A U Safety ($2.5 billion)

• National Highway Program ($32.4 billion)• Livable Communities ($4.1 billion)

CP

CP

––FF • Federal Allocation ($1.4 billion)

• Research, Technology, & Education ($641 million)T t ti L d hi A d ($1 3 billi )

TO J

TCTO

JTC Transportation Leadership Awards ($1.3 billion)

“Up-Front” Funding ($27.7 billion) Administrative Expenses ($441 million)

AA

SHT

AA

SHT Administrative Expenses ($441 million)

AA

Page 6: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee National Highway ProgramU

pdat

Upd

atg y g

Supports Performance Management Process FHWA sets goal areas, measures and targets for

FHW

A U

FHW

A U FHWA sets goal areas, measures and targets for

NHS+ 2 Sub Programs

Highway Infrastructure Performance Program

CP

CP

––FF Highway Infrastructure Performance Program

Formula based ($16.75B) Limited to NHS+ Limitation on new capacity

TO J

TCTO

JTC

Limitation on new capacity Infrastructure condition and operations focus

Flexible Investment Program Formula based ($15 6B)

AA

SHT

AA

SHT Formula based ($15.6B) All Federal-aid roadways and off system bridges Infrastructure focus

AA

64/22/2011

Page 7: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Highway Infrastructure Performance U

pdat

Upd

at

State targets set in consultation with FHWA and need to support national goals (within 1 yr of FHWA )

FHW

A U

FHW

A U FHWA set targets)

Every 4 yrs FHWA certifies State process to develop an NHS+ Asset Management Plan

CP

CP

––FF State must have an Asset Management Plan

which: is risk based

TO J

TCTO

JTC identifies existing performance

identifies performance gaps includes analysis of life cycle costs, value for

AA

SHT

AA

SHT includes analysis of life cycle costs, value for investment, risk management

includes a financial plan to fund plan includes strategies to invest funds to achieve targetsAA g g

74/22/2011

Page 8: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Highway Infrastructure PerformanceU

pdat

Upd

at

Reports

FHW

A U

FHW

A U

State report to FHWA required annually Condition and performance of NHS+ Progress in achieving State targets

CP

CP

––FF Progress in achieving State targets

Effectiveness of investment strategy

Penalty

TO J

TCTO

JTC

Penalty State targets not met for 2 consecutive years FHWA will work with State to revisit plan

AA

SHT

AA

SHT

Incentive State targets are met for 3 consecutive years

U f d f Fl ibl I t t P f 1AA Use funds for Flexible Investment Program for 1 year

4/22/2011 8

Page 9: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Flexible Investment ProgramU

pdat

Upd

atg

Funding to improve the conditions and performance of highways and bridges

FHW

A U

FHW

A U

Fund improvements on any federal-aid highway Fund improvements to any bridge on a public

roadway

CP

CP

––FF roadway

No restrictions on system expansion Additional eligibility:

Fringe and corridor parking facilities

TO J

TCTO

JTC Fringe and corridor parking facilities

Highway R&D and T2 Congestion pricing

T t ti l i

AA

SHT

AA

SHT Transportation planning

No requirement for an Asset Management Plan

AA

94/22/2011

Page 10: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee For More Information U

pdat

Upd

at

President’s Budget (DOT/FHWA overview and detailed budget account information):

FHW

A U

FHW

A U and detailed budget account information):

http://www.whitehouse.gov/omb/budget/Overview

CP

CP

––FF

DOT Budget Highlights and FHWA Congressional Justification: http://www.dot.gov

TO J

TCTO

JTC

FHWA budget estimate and fact sheets:

AA

SHT

AA

SHT http://www.dot.gov/budget/2012/budgetestimates/fhwa.pdf

AA

1003/31/2011

Page 11: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

Performance Management

FHW

AFH

WA g

Initiatives

TCP

TCP

––

Pete Stephanos

HTO

JT

HTO

JT p

[email protected]

AA

SHA

ASH

Page 12: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preparing for a National ApproachU

pdat

Upd

atg

How is performance defined?

FHW

A U

FHW

A U

How is performance monitored?

CP

CP

––FF

Where is the source of data?

TO J

TCTO

JTC How can we manage performance?

AA

SHT

AA

SHT

AA

Page 13: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preparing for a National ApproachU

pdat

Upd

atg

How is performance defined?

FHW

A U

FHW

A U

How is performance monitored?

CP

CP

––FF

Where is the source of data?

TO J

TCTO

JTC How can we manage performance?

AA

SHT

AA

SHT

AA

Page 14: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FHWA ApproachU

pdat

Upd

atpp

FHW

A U

FHW

A U

POOR

CP

CP

––FF

170 inches/mile

POOR

Percentage of NHS vehicle miles travelledIn Good condition

Percentage of NHS vehicle miles travelledIn Good condition

TO J

TCTO

JTC

FAIR

In Good conditionIn Good condition

AA

SHT

AA

SHT 95 inches/mile

GOODAA GOOD

Page 15: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee NHS Pavement Condition TrendsU

pdat

Upd

at

9%

10%60%

FHW

A U

FHW

A U

7%

8%

9%

40%

50%

onon

CP

CP

––FF

4%

5%

6%

30%

or C

ondi

tio

d C

ondi

tio

TO J

TCTO

JTC

2%

3%

4%

10%

20% Poo

Goo

d

Poor Pavements

Good Pavements

AA

SHT

AA

SHT

0%

1%

0%2000 2001 2002 2003 2004 2005 2006 2007 2008 2009

AA

Page 16: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeAnnual Improvement – Good Pavements

Upd

atU

pdat

40

States with Annual Improvement in Pavement ConditionPercentage of System in Good Condition

NHS

FHW

A U

FHW

A U

35

32

302929

282930

35

d Pa

vem

ents IS

CP

CP

––FF 27

22

2728

20

25

e in

% o

f Goo

dTO

JTC

TO J

TC

15

20

with

Incr

ease

AA

SHT

AA

SHT

5

10

No.

of S

tate

sAA

02005 2006 2007 2008 2009

Page 17: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Annual Decrease in Poor ConditionU

pdat

Upd

at

40

States with Annual Improvement in Pavement ConditionPercentage of System in Poor Condition

NHSIS

FHW

A U

FHW

A U

32

3031

34

27

30

35

or P

avem

ents IS

CP

CP

––FF

23

25

19

2425

27

20

25

se in

% o

f Poo

TO J

TCTO

JTC

15

20

s w

ith D

ecre

asA

ASH

TA

ASH

T

5

10

No.

of S

tate

sAA

02005 2006 2007 2008 2009

Page 18: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Distribution of Ride QualityU

pdat

Upd

aty

30%Distribution of NHS Travel on Good Riding Roads

FHW

A U

FHW

A U

25%

30%

el

TravelMileage

Below DOT GoalAt or Above DOT Goal

CP

CP

––FF

15%

20%

iles/

Trav

e

TO J

TCTO

JTC

5%

10%

of N

HS

Mi

AA

SHT

AA

SHT

0%<36% 36%-46% 46%-56% 56%-66% 66%-76% 76%-86% >86%

% o

% of NHS Travel/Mileage on Good Riding RoadsAA % of NHS Travel/Mileage on Good Riding Roads

Page 19: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee I-95 in VirginiaU

pdat

Upd

atg

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

VDOT Criteria DelDOT Criteria

Page 20: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preparing for a National ApproachU

pdat

Upd

atg

How is performance defined?

FHW

A U

FHW

A U

How is performance monitored?

CP

CP

––FF

Where is the source of data?

TO J

TCTO

JTC How can we manage performance?

AA

SHT

AA

SHT

AA

Page 21: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee State Performance Monitoring U

pdat

Upd

atg

98.2%94.6%

90.0%

100.0%

yed

Network LevelProject Level

FHW

A U

FHW

A U

58.9%66.1%

71.4%

55 4%60.0%

70.0%

80.0%

es S

urve

yC

P C

P ––

FF

33.9%

55.4%

40.0%

50.0%

%

of A

genc

ieTO

JTC

TO J

TC

16.1%

10 0%

20.0%

30.0%

Perc

ent o

AA

SHT

AA

SHT

0.0%

10.0%

Surface Distress Smoothness Structural Capacity Surface Friction

PAA

Source: NCHRP Synthesis Report 401

Page 22: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Surface Distress TypesU

pdat

Upd

atyp

100%93%

89%

RuttingTransverse Cracking

Fatigue Cracking

FHW

A U

FHW

A U 89%

89%77%

64%

Fatigue CrackingLongitudinal Cracking

Map/Block CrackingRavelling

CP

CP

––FF 64%

54%54%

46%

FaultingSpalling

Ravelling/FlushingEd C ki

TO J

TCTO

JTC 46%

36%32%

30%

Edge CrackingOther

Punch OutsShattered Slab

AA

SHT

AA

SHT 30%

27%21%

0% 20% 40% 60% 80% 100%

Shattered SlabDurability Cracking

Pumping

AA 0% 20% 40% 60% 80% 100%

Source: NCHRP Synthesis Report 401

Page 23: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Condition IndicesU

pdat

Upd

at

Excellent ?Rut Index

FHW

A U

FHW

A U Excellent

Good Fair e

Leve

l?PCR

Crack Index

CP

CP

––FF Fair

MediocreP ce

ptab

le

PCICrack Index

TO J

TCTO

JTC Poor

Very Poor AccPDIPCI

AA

SHT

AA

SHT

PSR Critical Index

Condition Rating

AA PSR Critical Index

Page 24: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee TXDOT ReportU

pdat

Upd

atp

State ThresholdsGeorgia 75–100 is good to excellent

FHW

A U

FHW

A U Georgia

Iowa MontanaN b k

75–100 is good to excellent60–80 is good, 80–100 is excellent63–100 is good70 89 i d 90 100 i d

CP

CP

––FF Nebraska

New HampshireNorth Carolina

70–89 is good; 90–100 is very good40–100 is acceptableGreater than 80 is good

TO J

TCTO

JTC Ohio

OregonVermont

75–90 is good; 90–100 is very good75.1–98 is good; 98.1–100 is very good for NHS40–100 is acceptable

AA

SHT

AA

SHT

VirginiaWashington

70–89 is good; greater is excellent50–100 is good

AA

Page 25: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preparing for a National ApproachU

pdat

Upd

at

How is performance defined?

FHW

A U

FHW

A U

How is performance monitored?

CP

CP

––FF

Where is the source of data?

TO J

TCTO

JTC How can we manage performance?

AA

SHT

AA

SHT

AA

Page 26: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee What Source of Data Should be Used?U

pdat

Upd

at

HPMS Outside lane only

FHW

A U

FHW

A U Outside lane only

One direction of travel One value for each section

R t d ll

CP

CP

––FF Reported annually

Represents all NHS roadways

State PMS Data

TO J

TCTO

JTC Various lanes

Both directionsShorter sections

AA

SHT

AA

SHT Shorter sections

Updated frequently

AA

Page 27: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Difference in Outcome - ExampleU

pdat

Upd

at

40%

50%Percent NHS VMT on Good Pavement

FHW

A U

FHW

A U

10%

20%

30%

State

HPMS

CP

CP

––FF

0%2004 2005 2006 2007 2008 2009 2010

HPMS

P NHS VMT P P

TO J

TCTO

JTC

20%

30%Percent NHS VMT on Poor Pavement

AA

SHT

AA

SHT

10%State

HPMSAA 0%2004 2005 2006 2007 2008 2009 2010

Page 28: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preparing for a National ApproachU

pdat

Upd

at

How is performance defined?

FHW

A U

FHW

A U

How is performance monitored?

CP

CP

––FF

Where is the source of data?

TO J

TCTO

JTC How can we manage

performance?

AA

SHT

AA

SHT performance?

AA

Page 29: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Managing PerformanceU

pdat

Upd

atg g

Collective Effort

FHW

A U

FHW

A U

National Goal

I di id l St t T t

CP

CP

––FF Individual State Targets

Program Design

TO J

TCTO

JTC

g g

Linking Accomplishments to Performance

AA

SHT

AA

SHT

AA

Page 30: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee National Performance TrendsU

pdat

Upd

at

4060%

NHS Pavement PerformanceActual vs. DOT Targets

Meeting Target

FHW

A U

FHW

A U

36

38

55%

onal

Tar

get

men

ts

DOT TargetActual

CP

CP

––FF

33 3334

50% g D

OT

Nat

io

Rid

ing

Pave

TO J

TCTO

JTC

30

32

31

30

32

ates

Mee

ting

T on

Goo

d R

AA

SHT

AA

SHT

28

3045%

No.

of S

ta

%VM

AA

2640%2005 2006 2007 2008 2009

Page 31: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Six Year State Performance TrendU

pdat

Upd

at

14

Six Year Performance Change in NHS Lane-Miles of Pavement in Good Condition2004-2009 Change in Condition

Conditions Improved Conditions Declined

FHW

A U

FHW

A U

10

12

nt B

and

Conditions Improved Conditions Declined

CP

CP

––FF

8

10

mpr

ovem

enTO

JTC

TO J

TC

4

6

of S

tate

s in

IA

ASH

TA

ASH

T

2No.

oAA 0

> 40% 30%-40% 20%-30% 10%-20% 0%-10% 0%-10% 10%-20% > 20%

6 Yr Change in % Good Pavements

Page 32: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee InitiativesU

pdat

Upd

at

Performance Management Framework Assessing Infrastructure Health

FHW

A U

FHW

A U Assessing Infrastructure Health

Asset Management Plan Prototype/Trials Support Tier 2 Measure Development

CP

CP

––FF pp p

Pavement Monitoring Guide Tools

TO J

TCTO

JTC HERS-ST Enhancements

Pavement Health Track Tool – RSL

AA

SHT

AA

SHT

Develop Health Monitoring Tool

AA

Page 33: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee InitiativesU

pdat

Upd

at

Training Awareness Analysis Management

FHW

A U

FHW

A U Awareness, Analysis, Management

Internal FHWA Efforts HPMS Quality Assurance Process

CP

CP

––FF HPMS Quality Assurance Process

Assessment of HERS NHS Pavement Report Template

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 34: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

Improving FHWA’s Ability t A I f t t

FHW

AFH

WA to Assess Infrastructure

Health

TCP

TCP

–– Health

N S d d

HTO

JT

HTO

JT Nastaran Saadatmand

202-366-1337Nastaran Saadatmand@dot gov

AA

SHA

ASH

[email protected]

Page 35: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project ObjectivesU

pdat

Upd

atj j

To define a consistent and reliable method to document infrastructure health with a

FHW

A U

FHW

A U to document infrastructure health with a

focus on pavements and bridges on the Interstate System (that can be expanded to

CP

CP

––FF Interstate System (that can be expanded to

the National Highway System)

To develop tools to provide FHWA and State

TO J

TCTO

JTC To develop tools to provide FHWA and State

DOTs ready access to key information

AA

SHT

AA

SHT

AA

35

Page 36: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project ApproachU

pdat

Upd

atj pp

Develop an approach for categorizing pavement and bridges as Good/Fair/Poor that can be used

FHW

A U

FHW

A U bridges as Good/Fair/Poor, that can be used

consistently across the country Good/Fair/Poor will be based on condition data

CP

CP

––FF

Recommend improvements to HPMS and NBI

Develop an approach for assessing the overall

TO J

TCTO

JTC

Develop an approach for assessing the overall Health of a highway corridor Looking for a “visit to the Doctor”

AA

SHT

AA

SHT outcome

Will go beyond condition

AA

36

Page 37: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project StructureU

pdat

Upd

atj

Phase I – Develop a methodology Kick-off meeting

FHW

A U

FHW

A U Kick off meeting

Literature review Identify approach

D l k l f Ph II

CP

CP

––FF Develop work plan for Phase II

Phase II – Conduct a pilot study Collect and review data

TO J

TCTO

JTC

Collect and review data Run sample assessment Document conclusions

AA

SHT

AA

SHT Phase III – Hold national meeting to review

results and discuss preferred methodologies

AA

37

Page 38: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project MilestonesU

pdat

Upd

atj

Jan 2012Oct 2010 Sep 2011Mar 2011

FHW

A U

FHW

A U

Phase I Phase II Phase III

PILOT STUDY

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

Key DeliverablesKey Meetings

AA

38

Page 39: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Defining Good, Fair, PoorU

pdat

Upd

atg

General, consistent definition

FHW

A U

FHW

A U

Two Options: IRI approach

CP

CP

––FF

Composite index approach

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 40: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Option 1. IRI U

pdat

Upd

atp

There is momentum for IRI to be the initial basis for a national pavement performance measure

FHW

A U

FHW

A U pavement performance measure

Recent FHWA and NCHRP 20-24(37) G reports propose Good/Fair/Poor thresholds, consistent with C&P Report thresholds

CP

CP

––FF thresholds

Threshold in C&P Report Category Proposed

Thresholds Category

TO J

TCTO

JTC

& p< 95 Good < 95 Good≤ 170 Acceptable 95 ≤ IRI ≤ 170 Fair> 170 Not Acceptable > 170 Poor

AA

SHT

AA

SHT

A TXDOT study found that less than 10 States use IRI threshold

> 170 Not Acceptable > 170 Poor

AA A TXDOT study found that less than 10 States use IRI threshold of ~170 to trigger “Poor” condition

40

Page 41: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Option 2. New Composite MeasureU

pdat

Upd

at

Based on HPMS 2010+ Potential approach use HPMS 2010+ data

FHW

A U

FHW

A U Potential approach - use HPMS 2010+ data

elements to develop new composite measure IRI

CP

CP

––FF

Rutting Faulting

TO J

TCTO

JTC Cracking (fatigue, transverse, cracked slabs,

punchouts) Develop modified PCI using HPMS 2010+ data

AA

SHT

AA

SHT Develop modified PCI using HPMS 2010+ data

Consistent with Tier 2 measure addressed in NCRHP 20-24(37) G AA ( )

41

Page 42: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Health Assessment TrackU

pdat

eU

pdat

e

What is it» A means for FHWA to examine

FHW

A U

FHW

A U » A means for FHWA to examine

the overall health of specific corridors and respond to requests for information

CP

CP

––FF q

Vision for the health assessment» A report that summarizes

TO J

TCTO

JTC

poverall health and identifies potential warning signs

» A tool to review metrics and

AA

SHT

AA

SHT examine detailed data

Valuable to agencies that manage t d b idAA

42

pavements and bridges

Page 43: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Health AssessmentU

pdat

Upd

at A Potential ToolExamine by combination Select

t

FHW

A U

FHW

A U of routes

and statesroutes or segments using a map

CP

CP

––FF

TO J

TCTO

JTC

Review a quick

AA

SHT

AA

SHT summary of

overall health or more detailedAA

43

detailed information

Page 44: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Health AssessmentU

pdat

Upd

at A Potential Tool, continued

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

Other tabs could

AA

SHT

AA

SHT provide more

detailed information on condition of a particular assetAA particular asset

Page 45: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Pilot ApproachU

pdat

Upd

atpp

Select a three-state pilot corridor

FHW

A U

FHW

A U

Compile Federal data sets for pavements (HPMS 2010+ and NBI)

CP

CP

––FF Compile state data used to develop Federal data

sets

TO J

TCTO

JTC Perform field collection for pavement data (maybe

bridge)

C d d l i f d

AA

SHT

AA

SHT Compare data and measures resulting from data

Identify issues and recommend improvements

AA

45

Page 46: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Pilot Corridor U

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

TAA

46

Page 47: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Issues to be Addressed During PilotU

pdat

Upd

at

Consistency between state data and b itt d F d l d t

FHW

A U

FHW

A U submitted Federal data

Consistency between states

CP

CP

––FF

Validity of metrics Calculations

TO J

TCTO

JTC

Good/Fair/Poor thresholds Validity of health approach

AA

SHT

AA

SHT Validity of health approach

AA

47

Page 48: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Compare and Discuss AlternativesU

pdat

Upd

at

HPMS

Different Data Sources

FHW

A U

FHW

A U

State

CP

CP

––FF Collected

Diff t M t i O ti

TO J

TCTO

JTC

Option 1

Different Metric Options

AA

SHT

AA

SHT Option 2

Option 3

AA

48

Page 49: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee National MeetingU

pdat

Upd

atg

Funding to send 1 person from every t t

FHW

A U

FHW

A U state

Meeting to be held in Fall, 2011

CP

CP

––FF

Review outcomes of I-90 pilot Discuss preferred options

TO J

TCTO

JTC

Discuss preferred options Identify next steps

AA

SHT

AA

SHT

AA

Page 50: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

P t T S l ti

FHW

AFH

WA Pavement Type Selection

TCP

TCP

––

Mark Swanlund202-366-1323

HTO

JT

HTO

JT

[email protected]

AA

SHA

ASH

Page 51: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Overview of Pavement Type SelectionU

pdat

Upd

at

Components of Agency ProcessesS l i f l i

FHW

A U

FHW

A U

Selection of alternatives Structural design Economic Analysis

CP

CP

––FF

Primary/Secondary Factors

Contractor-based processes

TO J

TCTO

JTC Alternate Bidding Design Build Long Term Warranty

AA

SHT

AA

SHT Long Term Warranty

Other ( PPP, Value Engineering, BV Contracting, Contract Maintenance)

AA

Page 52: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FHWA Memo on Alternate BiddingU

pdat

Upd

at

• Issued November 13, 2008Clarifies and consolidates FHWA policy

FHW

A U

FHW

A U • Clarifies and consolidates FHWA policy

• Applies to Federal-aid on the NHSAlt Bidding is “not encouraged”

CP

CP

––FF • Alt Bidding is not encouraged

• However, many states are doing it….

TO J

TCTO

JTC Equivalent designs

Discount rate Uncertainty

Commodity price adjustments

I/D provisionsM t i l titi

AA

SHT

AA

SHT Rehabilitation strategy

Subjective factors Materials quantities Approval process

AA

Page 53: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Alternate Bidding UsageU

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

T

State has advertised at least 1 alternate bid jobState has not utilized alternate biddingAA State has not utilized alternate biddingState did not reply to survey

Page 54: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FHWA Next StepsU

pdat

Upd

atp

Reviewing state experience with lt t biddi SEP 14 t

FHW

A U

FHW

A U alternate bidding – SEP 14 reports

Identifying key issues that need to be

CP

CP

––FF y g y

addressed

Have identified 4 issues

TO J

TCTO

JTC Have identified 4 issues

AA

SHT

AA

SHT

AA

Page 55: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Issue #1U

pdat

Upd

at

Issue: States may not be taking enough t i th i d i t

FHW

A U

FHW

A U steps in their design process to ensure

that sound engineering and economic i i l id d i th i

CP

CP

––FF principles are considered in their

pavement type selection decision.

TO J

TCTO

JTC

Response: Issue PTS guidance and

AA

SHT

AA

SHT p g

provide technical assistance.

AA

Page 56: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Issue #2U

pdat

Upd

at

Issue: More states are using alternate biddi b t FHWA’ iti i till t

FHW

A U

FHW

A U bidding, but FHWA’s position is still to

“not encourage” its use.

CP

CP

––FF

Response: New guidance will recognize

TO J

TCTO

JTC

p g galternate bidding as viable option for pavement type selection.

AA

SHT

AA

SHT p yp

AA

Page 57: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Issue #3U

pdat

Upd

at

Issue: Use of alternate bidding needs to b d d SEP 14 i i

FHW

A U

FHW

A U be done under SEP-14, requiring

approval by FHWA.

CP

CP

––FF Response: FHWA proposes to

“graduate” alternate bidding to an

TO J

TCTO

JTC accepted practice.

AA

SHT

AA

SHT

AA

Page 58: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Issue #4U

pdat

Upd

at

Issue: Alternate bidding practice varies th t h

FHW

A U

FHW

A U across the country, some approaches

do not provide a competitive bidding i t

CP

CP

––FF environment

Response: FHWA proposes to issue

TO J

TCTO

JTC consider additional guidance to

recommend best practices for alternate

AA

SHT

AA

SHT bidding to provide a competitive

bidding environment

AA

Page 59: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

MEPDG Related Items

FHW

AFH

WA MEPDG Related Items

TCP

TCP

–– Tom Yu – Concrete Model Calibration202-366-1198T Y @d

HTO

JT

HTO

JT [email protected]

Chris Newman Preservation

AA

SHA

ASH Chris Newman - Preservation

[email protected]

Page 60: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

FHW

AFH

WA

Evaluation of R lib t d MEPDG

TCP

TCP

–– Recalibrated MEPDG JPCP Distress Models

HTO

JT

HTO

JT JPCP Distress Models

AA

SHA

ASH

Page 61: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee BackgroundU

pdat

Upd

atg

An error in the assumed value of coefficient of thermal expansion (CTE) of the calibration bar

FHW

A U

FHW

A U thermal expansion (CTE) of the calibration bar

resulted in overestimating CTE of LTPP PCC sections by about 0.8 micro-strains per ⁰F

CP

CP

––FF

PCC pavement responses are sensitive to CTE; a major change in CTE requires recalibration of the distress models

TO J

TCTO

JTC distress models

MEPDG JPCP performance models were recalibrated (NCHRP 20 07) to ensure the results

AA

SHT

AA

SHT recalibrated (NCHRP 20-07) to ensure the results

are reasonable and free of any bias

AA

Page 62: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee AssumptionsU

pdat

Upd

atp

The current MEPDG (Ver 1.0/1.1) performance models give reasonable results

FHW

A U

FHW

A U performance models give reasonable results

when used with the old, inflated CTE values

C

CP

CP

––FF CTE depends on aggregate type; on

average, we should see about 0.8 10-6/ F drop in CTE from the correction:

TO J

TCTO

JTC drop in CTE from the correction:

Old average CTE: 5.4 10-6/⁰F Corrected average CTE: 4 6 10-6/⁰F

AA

SHT

AA

SHT Corrected average CTE: 4.6 10 / F

AA

Page 63: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee ExpectationsU

pdat

Upd

atp

Recalibrated models with the new CTE values should provide similar results as the

FHW

A U

FHW

A U values should provide similar results as the

old models with old CTE values

f

CP

CP

––FF No significant change in design thicknesses

should result from the correction

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 64: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee ProblemsU

pdat

Upd

at

The revised JPCP cracking model typically predicts dramatically less cracking than Ver.1.0

FHW

A U

FHW

A U

The new design thicknesses are typically 0.8 to 1.4 in less than the old

Similar results (as the old model) are obtained only for thin

CP

CP

––FF ( ) y

sections: design thickness less than 8.5 in

The revised JPCP faulting model over-predicts faulting,

TO J

TCTO

JTC especially for high traffic

Less faulting is expected for lower CTE The magnitude of over-prediction is significant for high traffic,

AA

SHT

AA

SHT e ag tude o o e p ed ct o s s g ca t o g t a c,

especially if no edge support is provided

AA

Page 65: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Possible ConsequenceU

pdat

Upd

atq

High risk of under-designing pavement, especially for heavy traffic

FHW

A U

FHW

A U especially for heavy traffic

A 0.5-in reduction in the required slab thickness reduces traffic capacity by about 50%

CP

CP

––FF p y y %

A 1.0-in reduction in the required slab thickness reduces the traffic capacity by a factor of 3 (i.e., b t 1/3rd f th i i l it )

TO J

TCTO

JTC about 1/3rd of the original capacity)

AA

SHT

AA

SHT

AA

Page 66: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Effects of slab thickness on traffic capacity (MEPDG)U

pdat

Upd

at 15

FHW

A U

FHW

A U

10

b cr

acki

ng

CP

CP

––FF

perc

ent s

lab

10.5 in11.0 in11.5 in

TO J

TCTO

JTC 5

Aver

age

p

12.0 in

AA

SHT

AA

SHT

00 20 40 60 80 100 120 140AA 0 20 40 60 80 100 120 140

Traffic, million ESALs

Page 67: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Trend in Thickness ErrorU

pdat

Upd

at

2.5 

FHW

A U

FHW

A U

2.0 

on, in

CP

CP

––FF

1 0

1.5 

s redu

ctio

TO J

TCTO

JTC

0 5

1.0 

Thickness

AA

SHT

AA

SHT

0.0 

0.5 T

AA

7 8 9 10 11 12 13 14

Design thickness, in

Page 68: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Effects of CTE Drop on Calculated DamageU

pdat

Upd

at

0.3520‐07

Version 1.0

FHW

A U

FHW

A U

0.25

0.30

CP

CP

––FF

0 15

0.20

Dam

age

TO J

TCTO

JTC

0.10

0.15

Fatigu

AA

SHT

AA

SHT

0.00

0.05

AA 0 12 24 36 48 60 72 84 96 108 120 132 144 156 168 180 192 204 216 228 240

Months

Page 69: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Comparison of Cracking ModelsU

pdat

Upd

at

90

100

FHW

A U

FHW

A U

70

80

ked

CP

CP

––FF

50

60

t Slabs Crac

TO J

TCTO

JTC

30

40

Percen

t

AA

SHT

AA

SHT

10

20

V1.0

20‐07

AA 0

0.001 0.010 0.100 1.000 10.000 100.000

Fatigue Damage

Page 70: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Typical DesignU

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

TAA

Page 71: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Comparison of Cracking ModelsU

pdat

Upd

atg

25V1.0

20‐07

FHW

A U

FHW

A U

20

ked

Needed

CP

CP

––FF

15

Slab

s Crack

TO J

TCTO

JTC 10

Percen

t S

AA

SHT

AA

SHT

5

AA 0

0.001 0.010 0.100 1.000

Fatigue Damage

Page 72: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

FHW

AFH

WA “Consideration of Pavement

Preservation in Mechanistic-

TCP

TCP

–– Preservation in MechanisticEmpirical Design and Analysis of

P t St t ”

HTO

JT

HTO

JT Pavement Structures”

AA

SHA

ASH

Page 73: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee NCHRP Project 20-07, Task 251U

pdat

Upd

at

“Consideration of Pavement Preservation in Mechanistic Empirical Design and Analysis

FHW

A U

FHW

A U Mechanistic-Empirical Design and Analysis

of Pavement Structures” March 2009 Applied Pavement Technology

CP

CP

––FF March 2009, Applied Pavement Technology

States the case for considering the t ib ti f ti i t

TO J

TCTO

JTC contributions of preventive maintenance

activities in the MEPDG process, and describes both short-term and long-term

AA

SHT

AA

SHT describes both short-term and long-term

approaches to accomplish that.

AA

Page 74: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Preventive Maintenance in DesignU

pdat

Upd

at

Preventive maintenance is part of most agencies’ pavements program should

FHW

A U

FHW

A U agencies pavements program – should

influence the decisions made in pavement design.

CP

CP

––FF design.

Treatments are being performed to prevent moisture infiltration or to restore surface

TO J

TCTO

JTC moisture infiltration or to restore surface

characteristics – these will have some effect over time on the structural performance of

AA

SHT

AA

SHT over time on the structural performance of

the pavements

AA

Page 75: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Next Steps?U

pdat

Upd

at

Report describes how to incorporate preventive maintenance treatments into pavement design –

pFH

WA

UFH

WA

U maintenance treatments into pavement design adjustment or modification of performance models.

Provides seven recommendations for additional

CP

CP

––FF Provides seven recommendations for additional

research or improved tracking of treatment application and performance.

TO J

TCTO

JTC What can FHWA and AASHTO consider in

upcoming activities to incorporate the observations and recommendations of the report into the

AA

SHT

AA

SHT and recommendations of the report into the

MEPDG?

AA

Page 76: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

Highway Sustainability

FHW

AFH

WA Rating Tool, INVEST

TCP

TCP

––

Katherine Petros202 493 3154

HTO

JT

HTO

JT 202-493-3154

[email protected]

AA

SHA

ASH

Page 77: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee What is a sustainable highway?U

pdat

Upd

atg y

Satisfies functional requirements Fulfills transportation goals and needs (e g

FHW

A U

FHW

A U Fulfills transportation goals and needs (e.g.

congestion reduction) Addresses development and economic growth

CP

CP

––FF

p g Reduces impacts

Environment

TO J

TCTO

JTC Consumption of resources

Addresses environmental, economic, and social equity dimensions (triple bottom line)

AA

SHT

AA

SHT equity dimensions (triple bottom line)

Addresses sustainability from planning through operationsAA

77

Page 78: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee FHWA’s Sustainable HighwaysU

pdat

Upd

at Self Evaluation Tool

Encourage sustainable highway projects

FHW

A U

FHW

A U Encourage sustainable highway projects

Help agencies measure sustainability f ff

CP

CP

––FF and quantify tradeoffs

Provide a framework for communicating

TO J

TCTO

JTC

Provide a framework for communicating with stakeholders about sustainability

E t bli h th d f l ti

AA

SHT

AA

SHT Establish a method for evaluating

sustainable highways

AA

78

Page 79: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Sustainable Highways ToolU

pdat

Upd

atg y

Working Title:IN-VEST - Infrastructure Voluntary

FHW

A U

FHW

A U

A web-based self-evaluation tool for measuring

IN VEST Infrastructure Voluntary Evaluation Sustainability Tool

CP

CP

––FF A web-based self-evaluation tool for measuring

sustainability over the life cycle of a transportation project or program — from system

d j t l i th h d i d

TO J

TCTO

JTC and project planning through design and

construction, to operations and maintenance

AA

SHT

AA

SHT

Website address—www.sustainablehighways.org

AA

Page 80: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeWhat are some of the Tool’s characteristics?

Upd

atU

pdat

Web-based Credits based on best practices

FHW

A U

FHW

A U Credits based on best practices

Each credit assigned a point value based on expected sustainability impact

CP

CP

––FF

p y p In coordination with ASCE effort Other sustainable highways tools used as

f

TO J

TCTO

JTC references

(GreenLITES, I-LAST, Greenroads)

AA

SHT

AA

SHT

AA

Page 81: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee What the Tool is NOT…U

pdat

Upd

at

The tool is not final. W ki B t i

FHW

A U

FHW

A U

We are working on a Beta-version. The tool is not required.

Use is purely voluntary

CP

CP

––FF Use is purely voluntary.

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 82: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Sustainable Highway CreditsU

pdat

Upd

atg y

System Planning (SP) Agency wide management /planning of highways

FHW

A U

FHW

A U Agency-wide management /planning of highways

System/Network evaluation Project Development (PD)

CP

CP

––FF Project Development (PD)

Environmental Review, project planning, design, and construction

TO J

TCTO

JTC Project evaluation

Operations and Maintenance (OM)A id h t t d i t i

AA

SHT

AA

SHT Agency-wide approach to operate and maintain

system System/Network evaluationAA System/Network evaluation

82

Page 83: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeFHWA BETA VERSION

Home PageU

pdat

Upd

atHome Page

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 84: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeFHWA BETA VERSION

Learning TabU

pdat

Upd

atLearning Tab

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 85: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeFHWA BETA VERSION

Browsing TabU

pdat

Upd

atBrowsing Tab

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 86: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeFHWA BETA VERSION

Scoring TabU

pdat

Upd

atScoring Tab

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 87: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeSystem Planning & Processes Credits

Upd

atU

pdat

SP-1 Comprehensive & Integrated Planning

SP-8 Travel Demand Management

FHW

A U

FHW

A U g g

SP-2 Environmental Management System

SP-3 Context Sensitive

gSP-9 Safety ManagementSP-10 Air Quality

Management

CP

CP

––FF Solutions

SP-4 Equity AnalysisSP-5 Integrated

T t ti L d

gSP-11 Greenhouse Gas

EmissionsSP-12 Climate Change Effects

TO J

TCTO

JTC Transportation Land

Use PlanningSP-6 Multimodal

Transportation

SP-13 Noise Reduction Management Plan

SP-14 Financial Sustainability

AA

SHT

AA

SHT Transportation

SP-7 Professional Development

AA

Page 88: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project Development Credits: Project PlanningU

pdat

Upd

at

PD-1 Cost Benefit Analysis

FHW

A U

FHW

A U

PD-2 Highway and Traffic Safety PD-3 Context Sensitive Solutions

CP

CP

––FF PD-4 Lifecycle Assessment

PD-5 Lifecycle Cost AnalysisPD 6 Freight Mobility

TO J

TCTO

JTC PD-6 Freight Mobility

PD-7 Educational Outreach

AA

SHT

AA

SHT

AA

Page 89: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project Development Credits: Project DesignU

pdat

Upd

at

PD-8 Habitat RestorationPD-9 Runoff Flow Control

PD-19 Historical, Archaeological, and C lt ral Preser ation

FHW

A U

FHW

A U

PD-10 Runoff QualityPD-11 Ecological ConnectivityPD-12 Low Impact Development

Cultural PreservationPD-20 Scenic, Natural, or

Recreational QualitiesPD-21 Low-Emitting Materials

CP

CP

––FF PD-13 Recycled Materials

PD-14 Renewable EnergyPD-15 Site VegetationPD 16 Pedestrian Access

PD 21 Low Emitting MaterialsPD-22 Energy EfficiencyPD-23 Traffic Systems,

Management and Operations (TSMO)

TO J

TCTO

JTC PD-16 Pedestrian Access

PD-17 Bicycle AccessPD-18 Transit & HOV Access

Operations (TSMO)PD-24 Long-Life PavementPD-25 Pavement and Structure

Reuse

AA

SHT

AA

SHT euse

PD-26 Stormwater Cost AnalysisPD-27 Thermal Pavement

AA

Page 90: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Project Development Credits: Project ConstructionU

pdat

Upd

at

PD-28 Contractor WarrantyPD 29 St t P ll ti

PD-34 Quality Control PlanPD 35 Reduced Energy

FHW

A U

FHW

A U PD-29 Stormwater Pollution

Prevention PlanPD-30 Environmental Training

PD-35 Reduced Energy Materials

PD-36 Waste ManagementPD 3 E h k B l

CP

CP

––FF PD-31 Equipment Emission

ReductionPD-32 Fossil Fuel Reduction

PD-37 Earthwork BalancePD-38 Environmental

Management System

TO J

TCTO

JTC PD-33 Construction Noise

MitigationPD-39 Tracking Environmental

Commitments

AA

SHT

AA

SHT

AA

Page 91: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeTransportation System Management, Operations & Maintenance Credits

Upd

atU

pdat

OM-1 Pollution Prevention Plan

OM-8 Mobility OM-9 Safety

FHW

A U

FHW

A U

OM-2 Pavement Management System

OM-3 Bridge Management

OM 9 SafetyOM-10 Snow & Ice ControlOM-11 Renewable Energy UseOM-12 Sustainability Plan

CP

CP

––FF

g gSystem

OM-4 Paved Surfaces Management System

OM 5 T ffi C t l

OM-12 Sustainability PlanOM-13 Alternative Fuel Fleet OM-14 Recycle and Re-useOM 15 Ecological Connectivity

TO J

TCTO

JTC OM-5 Traffic Control

Infrastructure Maintenance

OM-6 Cleaning and Litter

OM-15 Ecological Connectivity

AA

SHT

AA

SHT OM-6 Cleaning and Litter

OM-7 Roadside Infrastructure Maintenance

AA

Page 92: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee OM-2 Pavement Management SystemU

pdat

Upd

at

Goal Make pavements last longer and perform better by preserving and maintaining them

FHW

A U

FHW

A U by preserving and maintaining them.

Points 1 – 10 pointsDescription The agency shall have a pavement management

system (PMS) A pavement management system is a

CP

CP

––FF system (PMS). A pavement management system is a

formal systematic process of preserving and rehabilitating a particular pavement or network of pavements.

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 93: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee OM-2 Pavement Management SystemU

pdat

Upd

at

Have a Plan (1 point)M t diti t l t t

Requirements

FHW

A U

FHW

A U

Measure pavement condition at least every two years Document decision criteria for timing rehabilitation Record when rehabilitation occurs

CP

CP

––FF Measure Performance (3 points)– Track pavement network

performance using two common metrics: Overall network condition using common metrics

TO J

TCTO

JTC

g Number and fraction of rehabilitation actions scheduled

on time and delayed Set and Achieve Goals (6 points)

AA

SHT

AA

SHT Set and Achieve Goals (6 points)

Set quantifiable goals relating to the two metrics, including when these goals are to be achieved

Monitor progress towards goals; show measureableAA Monitor progress towards goals; show measureable advancement towards goals.

Page 94: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

eeAchievement Levels

Upd

atU

pdat

How will success be measured?

FHW

A U

FHW

A U

Achievement levels are included in Beta version

CP

CP

––FF

Look similar to LEED Rating system Bronze (base level)

TO J

TCTO

JTC Bronze (base level)

Silver (level 2) Gold (level 3)

AA

SHT

AA

SHT Gold (level 3)

Platinum (top level)

AA

Page 95: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Next StepsU

pdat

Upd

atp

Beta version released Fall 2010

FHW

A U

FHW

A U

Requested input from the transportation community in testing and improving the

CP

CP

––FF tool

Evaluating feedback

TO J

TCTO

JTC Making website improvements

Release revision (Version 1 0)

AA

SHT

AA

SHT Release revision (Version 1.0)

Target date: April 22, 2011

AA

Page 96: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

FHW

AFH

WA

Website address—

TCP

TCP

–– Website addresswww.sustainablehighways.org

HTO

JT

HTO

JT

AA

SHA

ASH

Page 97: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate

A U

pda

A U

pda

Initiative Updates

FHW

AFH

WA Initiative Updates

Warm Mix Asphalt Step Frequency GPR

TCP

TCP

–– a sp a t

Safety Edge

C t O l

Step eque cy G

Asphalt Mixture Perf Tester

F i ti L P

HTO

JT

HTO

JT

Concrete Overlays

High RAP Mixtures

Friction Loan Program

Intelligent Compaction

AA

SHA

ASH

Page 98: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Warm Mix AsphaltU

pdat

eU

pdat

e p

Allows a reduction in asphalt

FHW

A U

FHW

A U

mixture production & placement temperatures

CP

CP

––FF Benefits:

Provides better compactionReduce worker fatigue

TO J

TCTO

JTC

educe o e at gueReduces fossil fuel consumptionReduces CO2e & other emissionsLonger paving season

AA

SHT

AA

SHT Allows for longer hauling distances

Benefits with High RAP

AA

Page 99: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Warm Mix AsphaltU

pdat

Upd

atp

Various technologies are used, which allows

FHW

A U

FHW

A U

the plant mix to be produced and compacted at lower temperatures…

CP

CP

––FF Typical production temperature reduction 30 to 75ºF

WMA Technologies:

TO J

TCTO

JTC Foaming Processes

Wax-like Additives

AA

SHT

AA

SHT Chemical Additives

Hybrids

AA

Page 100: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Warm Mix AsphaltU

pdat

eU

pdat

e p

First public demo in US in 2004

FHW

A U

FHW

A U

WMA projects have been completed in 40 StatesAt least 10 States have adopted

CP

CP

––FF At least 10 States have adopted

permissive specifications

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 101: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee WMA WorkshopsU

pdat

Upd

atp

NAPA/FHWA Sponsored EventsA h lt I D th

FHW

A U

FHW

A U

Asphalt In Depth Recycled Materials, WMA, & Construction

Nashville TN

CP

CP

––FF Nashville, TN

June 1-2, 2011 www hotmix org/asphaltindepth

TO J

TCTO

JTC

www.hotmix.org/asphaltindepth 2nd International Conference on WMA

St. Louis, MO

AA

SHT

AA

SHT St. Louis, MO

October 11-13, 2011 www.hotmix.org/warmmixAA

Page 102: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee What Is the Safety Edge?U

pdat

Upd

aty g

it allows a vehicle to re enter theWh d h lt t th

FHW

A U

FHW

A U

30 degree beveled pavement edge shaped during the paving processasphalt or concretelocated where the pavement interfaces

with a graded material

it allows a vehicle to re-enter the pavement with greater stability and less l f l l i i d d

When used on asphalt pavement the extruded shape can improve pavement

CP

CP

––FFshaped during the paving process asphalt or concrete with a graded material. loss of control resulting in reduced

crashes edge durability.

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 103: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Basic PrincipleU

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

T

Without a Safety EdgeAA Without a Safety Edge

Page 104: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Basic PrincipleU

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

T

With S f t EdAA With Safety Edge

Page 105: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Safety ImpactsU

pdat

Upd

aty p

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC ReasonablySafe

AA

SHT

AA

SHT

AA

Page 106: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Costs of the Safety Edge U

pdat

Upd

at

HardwareA i t l $3000

Paving ProcessN h i i

FHW

A U

FHW

A U

Approximately $3000 per shoe

Reusable

No change in paving speed

No additional operation

CP

CP

––FF Reusable

Material Minor additional asphalt

No additional operation Minimal monitoring

Surface Details

TO J

TCTO

JTC Minor additional asphalt

(depends on shoulder condition)

Surface Details No change in

smoothness/ride quality

AA

SHT

AA

SHT

AA

Page 107: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Safety Edge Construction WebinarU

pdat

Upd

atFH

WA

UFH

WA

UC

P C

P ––

FFTO

JTC

TO J

TCA

ASH

TA

ASH

TAA

Page 108: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Step-Frequency GPR (SF-GPR)U

pdat

Upd

atp q y ( ) SF-GPR is a promising NDT

t h l f t l ti

FHW

A U

FHW

A U technology for pavement evaluation

Advantages

CP

CP

––FF

Wide detection range Full coverage of a traffic lane in 2 passes

TO J

TCTO

JTC

g 2-D and 3-D imaging capability Continuous calibration

AA

SHT

AA

SHT

AA

Page 109: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ateThe APE

A U

pda

A U

pda

FHW

AFH

WA

TCP

TCP

––H

TO J

TH

TO J

TA

ASH

AA

SH

Page 110: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Current status of APEU

pdat

Upd

at

Current applications – ready for demonstrations and implementation

FHW

A U

FHW

A U implementation

Pavement layer thickness Moisture detection

V id d t ti

CP

CP

––FF Void detection

Variations in material properties (AC density)

Future applications

TO J

TCTO

JTC

pp AC stripping Layer debonding

Rutting evaluation (2 D & 3 D imaging)

AA

SHT

AA

SHT Rutting evaluation (2-D & 3-D imaging)

Detection and quantification of cracking Depth of dowel bars, tie bars, and reinforcing steel

AA

Page 111: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Concrete OverlaysU

pdat

Upd

aty

Guide to Concrete Overlay Solutions

FHW

A U

FHW

A U

One day Workshops Overlay Types & Uses

CP

CP

––FF Project Evaluation & Selection

Overlay DesignC t M t i l S ti

TO J

TCTO

JTC Concrete Materials Section

Work Zones under Traffic Overlay Construction

AA

SHT

AA

SHT Overlay Construction

Accelerated Construction Specification ConsiderationsAA p

Page 112: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ate

ate System of Concrete Overlays

A U

pda

A U

pda

Concrete OverlaysThinner Thicker

FHW

AFH

WA

Bonded Overlay System Unbonded Overlay System

TCP

TCP

––

Bonded Concrete

Bonded Concrete

Bonded Concrete

Unbonded Concrete O l f

Unbonded Concrete O l f

Unbonded Concrete O l f

HTO

JT

HTO

JT Overlay of

ConcretePavements

Overlay of Asphalt

Pavements

Overlay of CompositePavements

Overlay of Concrete

Pavements

Overlay of Asphalt

Pavements

Overlay of CompositePavements

AA

SHA

ASH

Bond to existing pavement is Existing pavement servesBond to existing pavement is integral to design.

Existing pavement serves only as a base.

Page 113: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee High RAP UseU

pdat

Upd

atg

Increase application to 25% RAP in all t l

FHW

A U

FHW

A U pavement layers

Supporting national research efforts

CP

CP

––FF

Supporting industry initiatives ETG activities

TO J

TCTO

JTC

ETG activities Field testing and evaluation

S ifi ti d l t

AA

SHT

AA

SHT Specification development

AA

Page 114: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee AASHTO RAP Survey ResultsU

pdat

Upd

aty

FHW

A U

FHW

A U

CP

CP

––FF

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

Page 115: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Asphalt Mixture Performance Tester (AMPT)U

pdat

Upd

at

Machine Specifically for Testing

FHW

A U

FHW

A U p y g

Engineering Properties of AsphaltMixtures:• Dynamic Modulus

CP

CP

––FF Dynamic Modulus

• Flow Number• Fatigue Test (potential)

TO J

TCTO

JTC

AA

SHT

AA

SHT

AA

115

Page 116: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee AMPT Pooled Fund Study TPF-5(178)U

pdat

Upd

aty ( )

• Objectiveso Procure AMPT for highway agencies

FHW

A U

FHW

A U o Procure AMPT for highway agencies

o Provide training on AMPTo Support national AMPT implementation

CP

CP

––FF pp p

• Progress and Scheduleo Four AMPTs delivered, four more ordered

TO J

TCTO

JTC

o ou M s del ve ed, ou o e o de edo More AMPTs to be ordered in 2011o Four training course completed

AA

SHT

AA

SHT o Two additional courses planned in 2011

AA

116

Page 117: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee AMPT Pooled Fund Study TPF-5(178)U

pdat

Upd

at

• Participants o Maine o Pennsylvania

FHW

A U

FHW

A U • Participants

o Alabamao Colorado

C i

o Maineo Marylando Nevada

N

o Pennsylvaniao Tennesseeo Utah

Vi i i

CP

CP

––FF o Connecticut

o Floridao Georgia

o New Hampshire

o New Jersey

o Virginiao Wisconsino Wyoming

TO J

TCTO

JTC

go Illinoiso Kansaso Kentucky

o New Yorko North

Carolina

y go Ontarioo FHWA – Lead

agency

AA

SHT

AA

SHT o Kentucky

o Oregonagency

AA

117

Page 118: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Application of Performance TestingU

pdat

Upd

at

Mix Design and Evaluationo Identify potential performance issues

FHW

A U

FHW

A U o Identify potential performance issues

Pavement Designo Engineering properties for MEPDG

CP

CP

––FF g g p p

Construction Acceptanceo Performance based specifications

TO J

TCTO

JTC

p Performance Monitoring

AA

SHT

AA

SHT

AA

118

Page 119: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Friction Loan ProgramU

pdat

Upd

atg

Equipment available for loan to states

FHW

A U

FHW

A U

Technical assistance is provided Equipment:

CP

CP

––FF q p

Circular Texture Meter Dynamic Friction Tester

TO J

TCTO

JTC

Dynamic Friction Tester Griptester

Contact: Bob Orthmeyer

AA

SHT

AA

SHT Contact: Bob Orthmeyer [email protected]

AA

Page 120: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Intelligent Compaction InitiativeU

pdat

Upd

atg p

Intelligent Compaction Equipment Loan/Demo (TPF5 128)

FHW

A U

FHW

A U Loan/Demo (TPF5-128)

Demo Projects (MN, NY, MS, MD, GA, IN, TX KS)

CP

CP

––FF TX, KS)

Best Practice Documents: (1)Asphalt Materials and (2) Soils

TO J

TCTO

JTC (1)Asphalt Materials and (2) Soils

Analysis Software and MN DOT Effort to standardize data

AA

SHT

AA

SHT standardize data

AA

Page 121: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Intelligent CompactionU

pdat

Upd

atg p

Active Pooled Fund Project12 St t

FHW

A U

FHW

A U

12 States Demonstrate and Evaluate Application www intelligentcompaction com

CP

CP

––FF www.intelligentcompaction.com

Holding Regional Workshops Provide State Demonstrations

TO J

TCTO

JTC Provide State Demonstrations

Developing Manual Best practices

AA

SHT

AA

SHT Best practices

Review of Technologies Use of IC to reduce density testingAA y g

Page 122: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

ee Initiative ContactsU

pdat

Upd

at

Warm Mix Asphalt Tom Harman

tom harman@dot gov

Step Frequency GPR Tom Yu

tom yu@dot gov

FHW

A U

FHW

A U [email protected]

Matt Corrigan [email protected]

Safety Edge

[email protected]

Asphalt Mixture Perf Tester Jeff Withee

[email protected]

CP

CP

––FF Andy Mergenmeier

[email protected] Chris Wagner

[email protected]

Friction Loan Program Mark Swanlund

[email protected] Bob Orthmeyer

TO J

TCTO

JTC Concrete Overlays

Sam Tyson [email protected]

Hi h RAP Mi t

Bob Orthmeyer [email protected]

Intelligent Compaction Lee Gallivan

AA

SHT

AA

SHT High RAP Mixtures

John Bukowski [email protected]

Audrey Copeland

[email protected]

AA [email protected]

Page 123: te FHWA Update to the A AASHTO JTCP FHWsp.design.transportation.org/Documents/JTC Pavements/FHWAUpdate... · • Modernize our highway system and create jobs F HWA Modernize our highway

THANK YOU!THANK YOU!