td lte ssr - 763 iloilo-jaro plaza
DESCRIPTION
Sample TSSR TDDTRANSCRIPT
-
REQUIRED ATTACHMENT PER SCENARIO
A1 Site Development Works Details
A2 AC & DC Power Details
A3 BTS & Antenna Details
B1 Site Layout
B2 Antenna Placement Layout
B3 RRU Placement Layout
B4 Equipment Layout and Propose Cable Layout
B5 Coverage Details
B6 Indoor Site Picture Details
B7 Outdoor Site Picture Details
B8 Manual Hauling Report
Scenario 2
RRU Below
Photo's and Sketches
Site DetailsScenario 1
RRU on TOP
-
Scope:
SMART Site ID:
SMART Site Name:
SUN Site ID:
SUN Site Name:
Area:
GPS Coordinates:
Site Address:
Survey Date:
Site Details
A1 Site Development Works Details
A2 AC & DC Power Details
A3 BTS & Antenna Details
Photo's and Sketches
B1 Site Layout
B2 Antenna Placement Layout
B3 RRU Placement Layout
B4 Equipment Layout and Propose Cable Layout
B5 Coverage Details
B6 Indoor Site Picture Details
B7 Outdoor Site Picture Details
B8 Manual Hauling Report
763
Iloilo Jaro-Plaza
JAIME ST. NEAR E.LOPEZ ST., Brgy Fatima, Iloilo City
Table of Contents
WGS 84
NEW DBS TD LTE
Visayas
SMART ENG - P&E Supp.
Attached
Vendor Rep.
Map Datum
SSR_00000_RET_REV_0
SMART ENG - TPE
SMART ROMCSMART BUILD
DOCUMENT NO.
SMART ENG - AP&E
Elevation
21m ASL
Decimal
122.558333
Longitude
122 33'30"
Latitude
10 43'21.2"
Decimal
10.722556
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
Tower location & type: Building site Building name No. of floors Radio room location
Tripod ht m(AGL) Pole mounted ht m(AGL)
Others ht m(AGL)
Lot site 3 Legged SST 4 Legged SST Monopole Guyed pole Guyed trilon
Structure height m
Leased Area Yes
Equipment room type: Concrete Room Van Outdoor installation Others pls specify
Equipment room size: 12-footer (2.75m x 4.01m) 20-footer (2.75m x 6m) Others pls specify
Ventilation type: Window ACU Split ACU Natural ventilation Others pls specify
Site accessibility: 24/7 Office hours Mall/Bldg hours Others pls specify
Manned Manned
Available
Needed
Needed
Available
Available
Band: GSM Height: m AGL Needed
Band: GSM Height: m AGL Needed
Band: UMTS Height: m AGL Needed
Band: UMTS Height: m AGL Needed
Band: LTE FDD Height: m AGL Needed
Band: LTE TDD Height: m AGL Needed
Mounting pole for RRU Height: m AGL Needed
Available Requires new grounding bar
Near antenna Below RRU Above RRU Available Requires new grounding bar Ohm Reading
Available Requires new grounding bar Ohm Reading
Available Requires new grounding bar Ohm Reading
Available Requires new grounding bar Ohm Reading
Available hole's needed: ,hole size
Available Qty needed: 2 pcs, cable gland size 7/8
New feeder / fiber line cable Needed If needed, length & size required:
Needed Qty needed: pcs
Available New DDF block required
Available New DDF block required
Needed Required length of jumper cable: m x pcs
Yes
Available Ampere: Qty: pc
Not Available Required ampere: Qty: pc
Yes No
Yes No
Yes Equipment type:
No
Recommended Not recommended
2pcs-cable glands
10m-LAN cable
15m-DCDU cable to rectifier
15m-BBU grounding cable
70m-CPRI cable @ 3 runs
70m-RRU dc cable @ 3 runs
3500
15m-GPS coax cable
RESPONSIBLE TEAM REMARKS
10m-RRU grounding cable @ 3 runs
10
Not Available
Not Needed
Not Needed
7
8
Not Available
Not Needed
Not Needed
5
Visayas
No. DESCRIPTION
2
3
VENDOR
STRUCTURE DETAILS
A1 - Site Development Works Details
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
No. OTHER WORKS REQUIRED FOR SITE READINESS
9
22
19
13
21
15
16
SITE SURVEY REPORT2 of 13
TECHNICAL SERVICES DIVISION
1
A
REMARKS
INDOOR & OUTDOOR
SSR_00000_RET_REV_0
DOCUMENT NO PAGE
20
C
17
B
18
11
12
14
Not Needed
6
Not Available4
Floor space (for new equipment)
New van/equipment room needed?
Van/equipment room extension needed?
Cable ladder space for new feeder line cable(Indoor)
Length
Not Available
Not Available
Not Available
3
Not Available
Not Needed
No
Not Needed
Not Available
UMTS
2100
UMTS
850
LTE
2100
Runs
Not Needed
Not Needed
Cable ladder space for new feeder line cable(Outdoor)
Mounting pole for additional antenna
Not Needed
Not Needed
Middle of tower
Not Needed
Lower part of tower( before the bend)
1800
2100
850
2100
Indoor grounding busbar termination
70
GSM
900
GSM
1800
Size
LTE
3500
Porthole available for new feeder line?
Cable gland available for new feeder line?
Direct mount on tower leg
Not Available
Not Available
Not Available
Grounding busbar termination
Not Available
space for new equipment
Triplexer installation recommended?
Note: Required breaker ampere (40A).
AC power upgrade required
Requires jumper cable from feeder tapping point to BTS?
TMA Installed
POWER
Circuit breaker available for new equipment
45
Air-Conditioning upgrade required
OTHERS
For pullout of idle battery bank/equipment to free up
DDF block termination for external alarm available?
900
New feeder line grounding kit
DDF block termination available?
Before the porthole( after the bend)
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
SHELTER TYPE (VAN, CONCETE SHELTER, BLDG): CONCRETE
TRANSFORMER QUANTITY & CAPACITY (KVA): NO LABEL
MCB RATING (AT):
GENSET 1 BRAND: Powercity
GENSET RATING (KVA):
GENSET WITH PAD & FUEL LINE (Y/N): N
ACU BRAND: NO LABEL
ACU RATING (HP): 2HP
SHELTER AREA: INDOOR
TYPE OF VAN (COLLAPSIBLE, RIGID) N/A
4
2
SPARE
N/A
Powerone
4
2
Sacred Sun 2V/600AH
54.10V
N/A
53.29V
Breaker Rating
100A
100A
Rectifier 1 (Loading Inventory)
Narada 2V/600Ah
63A SPARE
Huawei 2100 LTE/3G
40A
SPARE
40A
40A
20A
20A
20A
40A
20A
Eltek Valere
Distribution Current :
Rectifier Brand :
# of Rectifier Module :
# Battery Bank :
Battery Brand & Capacity :
Rectifier Voltage :
Rectifier 2 (Loading Inventory)
SPARE
SPARE
SPARE
63A
63A
63A
100A
63A
Breaker Rating
100A
Breaker Rating
Load DescriptionLoad Description
100A SPARE
Breaker Rating
SPARE
100A
SPARE
SPARE
SPARE
Status (ON/OFF)
Breaker Rating
F1
F2
Load Description
Rectifier 3 (Loading Inventory)
40A
80A
SPARE
20A
20A
SPARE
NO LABEL
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
80A
TDD LTE Breaker
SPARE
40A
40A
40A
80A
F19
F20
F7
F8
F9
F10
F18
F15
F11
F12
F16
F17
80A
63A
63A
63A
F15
F13
CB Battery
FB1
FB2
F4
CB Branch
F3
80A
SPARE
80A
SPARE80A
100A
100A100A
Breaker Rating
Status (ON/OFF)
ON
ON
BRO
ECI A
SPARE
BTS 3900 Upper
SPARE
SPARE
CB18
NO LABEL
NO LABEL
Status (ON/OFF)
ON
ON
80A
SPARE
Tower lights
Perimeter lights
F5
F6
RECTIFIER EQUIPMENT DETAILS
C.O.
CB5
CB6
Load Description
Rectifier 1
Rectifier 1
Indoor lights
SPARE
ACU1
ACU2
AC Loading @ MAIN (AMPERES): 13.6A
SIZE OF WIRE @ MDP - MAIN(mm/AWG): 30mm
MAIN BREAKER RATING(AT): 150
Load
CB2
CB3
CB12
CB13
CB7
70
70
40
40
40
40
CB4
30
CB14
CB15
CB16
CB17
CB8
CB9
CB10
CB11
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
A2 - AC & DC Power Details
AC Power System
Ma
in D
istr
ibu
tio
n P
an
el
Breaker Ratings(AT)
CB1
30
30
30
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 3 of 13
TECHNICAL SERVICES DIVISION
BTS 3900 Lower
SPARE
60
100A SPARE
100A SPARE
100A SPARE
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
Band: GSM 900 DCS 1800 UMTS 2100 UMTS 850 LTE 2100 LTE 3500
Existing BTS/Node B:
New eqpt BTS/eNodeB:
Existing configuration: + + New configuration: 1 + 1 + 1
Application: Macro Pico Micro Marcro + Pico
Installation type: Indoor Outdoor
NEW ANTENNA/FIBER NEW ANTENNA/FEEDER
ANTENNA CONFIGURATION
ITEM
Center height( meters)
Orientation (degrees)
Mechanical tilt
Electrical tilt(if any)
Application
Antenna model
Fiber/Feeder cable label
Fiber cable
7/8" Feeder cable
1 5/8" Feeder cable
(Jumper) BTS to feeder
(Jumper) Feeder to antenna
Triplexer used (Yes/No)
(Jumper) BTS to Triplexer
(Jumper) Triplexer to feeder
Grounding kits installed 3 set 3 set 3 set
TMA
Other remarks
RRU CONFIGURATION
Installation Height in Tower
45m
m
280
45m 45m
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 4 of 13
TECHNICAL SERVICES DIVISION
m
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
45m
Visayas
A3 - BTS & Antenna Details
60 180 180 280
RXD
m
TX/RX
70 m
SECTOR 1 SECTOR 2
TX/RX RXD
45m 45m45m 45m
N/A
N/A
N/A
SECTOR 2
TX/RX RXD
N/A
N/A
m
m
set
N/A
45m
N/A
Proposed
m
N/A
N/A
MACRO
no label
N/A
60
N/A
70
N/A
N/A
5
5
No
N/A
N/A
5 m
No
no label
N/A
MACRO
5 m
N/A
N/A
70 m
MACRO
No
N/A
5
N/A
m
m
m
m
N/A
5
m
m
m
N/A
no label
N/A
SECTOR 1 SECTOR 2 SECTOR 2
N/A
EXISTING Proposed EXISTING Proposed EXISTING
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
TECHNICAL SERVICES DIVISION
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 5 of 13
B1 - SITE CONSTRUCTION LAYOUT
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
Proposed
antenna
location for
Sector 3. At
45m with
azimuth of
280 deg
Proposed
antenna
location for
Sector 2. At
45m with
azimuth of
180 deg
Proposed
antenna
location for
Sector 1. At
45m with
azimuth of
60 deg
Proposed
RRU location
for Sector 1.
At 45m with
azimuth of 60
deg
Proposed
RRU location
for Sector 2.
At 45m with
azimuth of
180 deg
Proposed
RRU location
for Sector 3.
At 45m with
azimuth of
280 deg
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
Sector 1
Sector 2
TECHNICAL SERVICES DIVISION
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 6 of 13
Sector 3
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
B2 - ANTENNA PLACEMENT LAYOUT
Proposed
antenna
location for
Sector 1. At
45m with
azimuth of
60 deg
Proposed
antenna
location for
Sector 2. At
45m with
azimuth of
180 deg
Proposed
antenna
location for
Sector 3. At
45m with
azimuth of
280 deg
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
Sector 1
Sector 2
Sector 3
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
B3 RRU PLACEMENT LAYOUT
TECHNICAL SERVICES DIVISION
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 7 of 13
Proposed
RRU location
for Sector 1.
At 45m with
azimuth of 60
deg
Proposed
RRU location
for Sector 2.
At 45m with
azimuth of
180 deg
Proposed
RRU location
for Sector 3.
At 45m with
azimuth of
280 deg
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 8 of 13
TECHNICAL SERVICES DIVISION
B4 - EQUIPMENT LAYOUT AND PROPOSED CABLE LAYOUT
VENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 9 of 13
TECHNICAL SERVICES DIVISIONVENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
PANORAMIC VIEW 150 degrees PANORAMIC VIEW 180 degrees
Visayas
B5 - COVERAGE DETAILS
PANORAMIC VIEW 30 degrees PANORAMIC VIEW 60 degrees
PANORAMIC VIEW 90 degrees PANORAMIC VIEW 120 degrees
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 10 of 13
TECHNICAL SERVICES DIVISIONVENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
PANORAMIC VIEW 330 degrees PANORAMIC VIEW 360 degrees
Visayas
B5 - COVERAGE DETAILS
PANORAMIC VIEW 210 degrees PANORAMIC VIEW 240 degrees
PANORAMIC VIEW 270 degrees PANORAMIC VIEW 300 degrees
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
Proposed BBU and DCDU location
Proposed porthole. For additional 2 cable glands
Proposed 40A breaker
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 11 of 13
TECHNICAL SERVICES DIVISIONVENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
CIRCIUT BREAKER OTHERS
Visayas
B5 - INDOOR SITE PICTURE DETAILS
FLOOR SPACE INDOOR CABLE LADDER SPACE
GROUNDING BUSBAR TERMINATION PORTHOLE/CABLE GLAND AVAILABILITY
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 12 of 13
TECHNICAL SERVICES DIVISIONVENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
GPS PROPOSE LOCATION OTHERS
Visayas
B7 - OUTDOOR SITE PICTURE DETAILS
TOWER PICTURES OUTDOOR CABLE LADDER SPACE
GROUNDING BUSBAR TERMINATION NEAR ANTENNA BUSBAR
Proposed GPS location
-
Scope:SMART Site No.:
SMART Site Name:SUN Site No.:
SUN Site Name:Area:
DOCUMENT NO PAGE SITE SURVEY REPORTSSR_00000_RET_REV_0 13 of 13
TECHNICAL SERVICES DIVISIONVENDOR
NEW DBS TD LTE
763
Iloilo Jaro-Plaza
Visayas
B8 - MANUAL HAULING REPORT
-
I. FROM SOURCE TO POINT OF DELIVERY
( Check if w/ in Island) ( Check if Provinces )
ACCESS ROAD DESCRIPTION (joining the main road and point of delivery)
FROM:
II. POINT OF DELIVERY TO SITE ( Stage that cover the cost of hauling )
III. MODES OF TRANSPORTATION
specify if others
DEGREE OF HAULING DIFFICULTIES
EASY
LOT PROFILE ( angle of inclination ) (degrees) DIFFICULT
EXTREMELY DIFFICULT
IV. DISTANCE OF MANPOWER HAULING(if any) (meters)
V. TOTAL HAULING DISTANCE FROM PONT OF DELIVERY TO SITE (kilometers)
SITE ELEVATION (meters)
relative to nearest main road)
FLOOD HISTORY (meters)
Sketch Plan / Vicinity Map
Attachments:
1. PICTURES
2. OTHERS
PREPARED BY: ( CONTRACTOR ) CHECKED / APPROVED BY: ( NSA/ NCM-PM) NOTED BY: ( NCM ENGR.)
SIGNATURE OVER PRINTED NAME DATE SIGNATURE OVER PRINTED NAME DATE SIGNATURE OVER PRINTED NAME DATE
HAULING SURVEY REPORT
DATE:
REV NO.
SITE NO. SITE NAME
SITE ADDRESS
CITY/TOWN REGION
PROVINCE AREA
BARANGAY
BLDG NO,STREET
TO:
( Source ) Specify location ( Main road )
( Specify pier, airport, terminal location) if in provinces
( main road ) ( Point of Delivery ) specify location
TO:( Nearest SITE Location )
TRUCKS: VAN(type, no. of units) (type, no. of units) (type, no. of units)
HAULING DISTANCE (kilometers)
YES NO If YES (Indicate water level)