tcpet
TRANSCRIPT
TcpET – Surveying and Setting out using Total Station
TcpET
Surveying and Setting out using Total StationVersion 3.0.0
TcpET – Surveying and Setting out using Total Station
INDEX
• Main Features
• Program Structure
• Surveying
• Setting Out
• Tools and Utilities
• Customization
TcpET – Surveying and Setting out using Total StationMain Features
Supported Platforms• Total Stations
• Topcon • Sokkia• Trimble• Leica• Nikon• Geodimeter
• Mobile Devices• Pocket PC with ARM Processor. • Handheld PC with ARM, MIPS or SH processor.
• Operating Systems• Windows CE 2.11 / 3.0• Windows Mobile 2003 / 2003 SE / 5.0• Windows CE .NET 4.0 / 4.1 / 4.2/ 5.0
TcpET – Surveying and Setting out using Total StationMain Features
Connection via Cable or Bluetooth
TcpET – Surveying and Setting out using Total StationMain Features
Main Menu
•Clear Structure
•Data organised in projects
•ASCII files
•Windows environment
•Easy to use
TcpET – Surveying and Setting out using Total StationMain Features
Projects
TcpET – Surveying and Setting out using Total Station
Points
Point Management Editing Points Drawing Points
TcpET – Surveying and Setting out using Total Station
Other supported files (1)
Horizontal Alignments Vertical Alignments Cross Sections
TcpET – Surveying and Setting out using Total Station
Other supported files (2)
DXF Cartography Surfaces
TcpET – Surveying and Setting out using Total Station
Surveying
Point MeasurementsStation MeasurementsSurvey Management
TcpET – Surveying and Setting out using Total Station
Instrument Set-Ups
TcpET – Surveying and Setting out using Total Station
Surveying
Inverse Intersection
TcpET – Surveying and Setting out using Total StationSurveying
TcpET – Surveying and Setting out using Total Station
Surveying
Point Measurements
Point Measurement Graphic ModeDisplaced Points
TcpET – Surveying and Setting out using Total Station
Surveying
Station Measurements
Graphic ModeStation Measurements Measurement Settings
TcpET – Surveying and Setting out using Total Station
Surveying
Point and Station Calculation
Double MeasurementStations Calculation Simple Measurement
TcpET – Surveying and Setting out using Total StationSETTING OUT
TcpET – Surveying and Setting out using Total StationSetting Out Points
TcpET – Surveying and Setting out using Total StationSetting Out Station and Offset
TcpET – Surveying and Setting out using Total StationSetting Out Station and Code
TcpET – Surveying and Setting out using Total StationPoints over Line
TcpET – Surveying and Setting out using Total StationLines Intersection
TcpET – Surveying and Setting out using Total StationCrowns and Feet
TcpET – Surveying and Setting out using Total StationSlope Control
TcpET – Surveying and Setting out using Total StationSimple Cross-Section
TcpET – Surveying and Setting out using Total StationPoints over Cross-Section
TcpET – Surveying and Setting out using Total StationTOOLS
TcpET – Surveying and Setting out using Total StationPoints over Alignment
TcpET – Surveying and Setting out using Total StationDistance and Area among Points
Distance between Points Area among Points
TcpET – Surveying and Setting out using Total StationGeometric Constructions
TcpET – Surveying and Setting out using Total StationUTILITIES
TcpET – Surveying and Setting out using Total StationUtilities
Manual Measurement System Information
TcpET – Surveying and Setting out using Total StationSet-Up
TcpET – Surveying and Setting out using Total StationSurveying
TcpET – Surveying and Setting out using Total StationEquipment & Prism height
TcpET – Surveying and Setting out using Total StationCode Database & Comunication