TCO in the Data Center

July 17, 2012

Archive www.missioncriticalmagazine.com

Add to your favorites

Audio

Abstract

Live Twitter Feed

Group Chat

Presenter Info

Slides

Q & A

Handouts

Help

Survey

TCO in the Data Center

July 17, 2012

CONSULT + ENGINEER + COMMISSION

www.syska.com

© A

ll Rights Reserved

Mission Critical 7x24 Exchange Webinar

Presented by Cyrus J. Izzo, PE

Co-President, Syska Hennessy Group, Inc. July 17, 2012

CONSULT + ENGINEER + COMMISSION

www.syska.com

Key Industry Trends

TCO Concept

• IT Operations

• Design of Modern Data Centers

Changing End User Requirements

Questions and Answers

Agenda

CONSULT + ENGINEER + COMMISSION

www.syska.com

Key Industry Trends

• Do more with less

• Economic trend = fewer IT, Operational and Facilities Staff

• Focus on growing Data Center Efficiency

Optimizing Power Usage Effectiveness (PUE)

Increase critical load density

Reduce resource consumption

• Increased awareness of TCO (Total Cost of Ownership)

CONSULT + ENGINEER + COMMISSION

www.syska.com

TCO Concept

• Why is it becoming more important?

Managing operations with restricted budgets

Manage OPEX and balance CAPEX to optimize long-term financial impact

CONSULT + ENGINEER + COMMISSION

www.syska.com

Design

Construct

Commission & Turnover

Manage & Operate

Site Selection

TCO CAPEX

OPEX

CONSULT + ENGINEER + COMMISSION

www.syska.com

TCO Concept effect on IT Operations

• Lowering TCO and making the right decisions for IT Operations

Should we build, operate, and own our own facility

OR

Outsource and colocate our data center?

CONSULT + ENGINEER + COMMISSION

www.syska.com

TCO Concept effect on IT Operations

• Largest capital expenditure is site infrastructure - 70% is operating expenses and energy costs, the balance is actual IT equipment

• Options to allow IT staff to focus on projects rather than operational support

Colocation

Outsourcing

Cloud computing

• Various industries are following different strategies

CONSULT + ENGINEER + COMMISSION

www.syska.com

TCO Concept effect on Design of Modern Data Centers

• Site Selection

• Design choices

• Energy efficient design and modeling tools

• Time and resource commitment necessary for OPEX opportunities

• Future state

CONSULT + ENGINEER + COMMISSION

www.syska.com

Changing End User Requirements • Smarter, faster and cheaper

• Zero tolerance for downtime

• Clients are interested in modular buildouts – build what you need, as you need it – just in time

• Focus on emerging opportunities and retaining clients

• New baseline: Uptime and Reliability

CONSULT + ENGINEER + COMMISSION

www.syska.com

Changing End User Requirements

• ASHRAE expanding the range for IT equipment thermal envelope allows us to accept new opportunities for efficient design

Figure 2. ASHRAE Environmental Classes for Data Centers

© 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. All Rights Reserved

CONSULT + ENGINEER + COMMISSION

www.syska.com

Changing End User Requirements

• Design should provide a robust model to help:

Operate and maintain facilities over lifetime

With less staff

At lower cost

With the tools necessary to succeed

Total Cost of

Ownership

Terry Rennaker

Skanska Mission Critical COE

Mission Critical Magazine

July 17, 2012

Agenda

− Identify the costs

− Expand the boundaries

− Identify the target you are solving for

Identify the costs

18

Identify the cost – Costs are often siloed

IT Costs

Labor Other Utilities (gas, water,

sewer, etc.)

Energy

Maintenance

Capital

Life of system

Identify the cost − Capital and expense

− Direct capital cost − Cost of space − Depreciation annual/remaining − Cost of capital

− Energy − Time of day − Demand − Power source

− Other utilities − Gas − Water/Sewer − Carbon tax

Identify the cost

− Labor − Facility operations − IT operations

− Maintenance − Internal maintenance labor − External/vendor maintenance

− Life of system

− IT

Expand the boundaries

22

Offsite

Entire Facility

Exterior Back of house

Expand the boundaries

White space

Power supply

Energy Storage

Generators

UPS

Pow

er d

istr

ibut

ion

Racks

Servers

Cooling Towers Chillers

CR

AC

Other facilities Other facilities Other facilities

Identify the target

24

Identify the target you are solving for

− What is important to your organization?

Identify the target you are solving for

First Cost Operating Cost

P&L Impact

Payback Period

Balance Sheet Impact

Environmental

Identify the target you are solving for

− First cost

− Avoided capital expense − If you spend this you avoid…

− Operating cost reduction − Energy − Utilities − Labor − Maintenance

− Balance sheet

− Accepted term of payback

Identify the target you are solving for

− P&L impact − Generally Accepted Accounting Principles (GAAP) − Depreciation is an expense − Capital vs Operating lease (FAS 13 tests)

1) There can be no ownership transfer as part of the lease agreement. 2) Does the purchase option cannot constitute a bargain as defined by FAS-13. 3) Lease term must be less than the useful life of the asset 4) The net present value of the rent cannot exceed 90% of the Fair Market Value of the asset 5) The lease term must be less than 75% of the remaining economic life of the asset

Identify the target you are solving for

− Accepted measurement − Net Present Value (NPV) − Return on Investment (ROI) − Return on Equity (ROE) − EBIT − EBITDA

− Environmental − LEED − Energy efficiency − Water efficiency − Carbon impact

Conclusion

− Identify the costs

− Expand the boundaries

− Identify the target you are solving for

Type your question in the box and hit submit