DEVELOPMENTAL ACTIVITIES (TOURISM SECTOR)

ENGINEERING WING SPORTS, TOURISM, ARCHAEOLOGY, YOUTH AFFAIRS & MUSEUMS

GOVERNMENT OF KHYBER PAKHTUNKHWA.

Page 2: Tckp(2 projects)khaled

Tourism Projects

Project Name : Public Private Partnership for the Development of Tourists Facilities in Chitral, Galyat, Narran, Kaghan and Kohistan.

(Estimated cost : 75.00M) (ADP No. 631-120890)S.No Sub Titles Estimated

costRelease

for 2013-14

TF Beyond

2013

Duration

Name Of Contactors

Payment Done

Progress Done in %

Remarks

iDay Time facility

at Lake Saifal Malook

15.28 M

40 M

  2 Years Kaghan Construction   land issue

Work order has already been

issued development

works has not yet started due to Demarcation

issue

ii

Tourists facility and family

Cottages at Batta Kundi Narran

50.16 M   2 YearsPir

Muhammad & Co

9.2 M 20%Work in Progress

/ Snow bound area

iii

Rehabilitation of Chitral Rest

House at Garam Chasma

8.76M   1 Year A.Q Khan 6.72M 90% Finishing stages / Snow bound area

Page 3: Tckp(2 projects)khaled

Tourism ProjectsProject Name : Development & Restoration of Properties Transferred by the Provincial Govt. to the

TCKP for the Tourists. (Estimated cost : 60.00M) (ADP No. 630-120647)

S.No Sub Titles Estimated cost

Release for 2013-

14

TF Beyond

2013

Duration

Name Of Contactors

Payment Done

Progress in % Done

Remarks

i

Rehabilitation of Rest House and Construction of

cottages at Batakundi, Naran

21.03 M

37 M

  2 Years Raja Adalat khan 4.26 M 25%

Work in Progress / Snow bound

area

iiConstruction of Rest

House at Nathya Gali

26.017M   2 Years National RCC Works Pvt Ltd

Waiting for GDA

approval5%

Work order issued / Paper

work in progress

iiiRehabilitation of

Rest House at Tandyani

6.409 M   1 Year National RCC Works Pvt Ltd

1st bill is in due process

of verification

25%Work in Progress

/ Snow bound area

iv

Rehabilitation of Rest House &

Children Park at Bahrain

6.456 M   1 Year

Adcon Engineering

JV Lal Marjan Construction

company

0.7 M 25% Work in Progress

Page 4: Tckp(2 projects)khaled

Lake Saifal Malook

PUBLIC BUILDING

TIC

SITTING

PRAYER HALL

TOILET

TOILET

LAWN

LAWN

PROJECT :Day Time facility at Lake Saifal Malook. ADP NO - 626-120890 (2013-14) COST - 15.28 M

PROPOSED SCOPE OF WORK • TIC •PUBLIC HALL•PRAYER HALL•SITTING AREAS•CHILDREN PARK•TOILETS

Page 5: Tckp(2 projects)khaled

PUBLIC HALL50'x40'

(1978.6238 square ft.)

VERANDAH 12'-0" WIDE

VE

RA

ND

AH

12'

-0"

WID

E

VE

RA

ND

AH

12'

-0"

WID

E

Page 6: Tckp(2 projects)khaled

2012-2013

PROJECT NAME : REHIBILITATION OF REST HOUSE & CONSTRUCTION OF COTTAGES AT BATAKUNDI NARRAN. ADP NO – 608-120647 -2012-2013 Estimated Cost- 21.03 M

PROPOSED SCOPE OF WORK• REPAIRING OF 4 NO OF OLD BUILDINGS•BOUNDARY ALL WITH GRILL•5NO OF FAMILLY COTTAGES• WATER SUPPLY SYSTEM

15 KANAL

Page 7: Tckp(2 projects)khaled

2012-2013

PROJECT NAME : REHIBILITATION OF REST HOUSE & CONSTRUCTION OF COTTAGES AT BATAKUNDI NARRAN. ADP NO – 608-120647 -2012-2013 Estimated Cost- 21.03 M

PROPOSED SCOPE OF WORK•PUBLIC HALL•PRAYER HALL•TIC•TOILETS• REPAIRING OF 4 NO OF OLD BUILDINGS•BOUNDARY ALL WITH GRILL•5NO OF FAMILLY COTTAGES• WATER SUPPLY SYSTEM

15 KANAL

Page 8: Tckp(2 projects)khaled
Page 9: Tckp(2 projects)khaled
Page 10: Tckp(2 projects)khaled
Page 11: Tckp(2 projects)khaled
Page 12: Tckp(2 projects)khaled

PROPOSED COTTAGE(562.48 s f t.)

COTTAGE

Page 13: Tckp(2 projects)khaled

1872.0 SFT

EXISTING REST HOUSE PLAN

Payment Done- 0.367 M

PROPOSED SCOPE OF WORK•OLD BUILDING RENOVATION•BOUNDARY WALL•SWIMMING POOL(HEALTH RESORT)•WATER SUPPLY•ELECRIFICATION• BACK FILLING•DRAINS

ADP.NO 626 -120890 (2013-2014)

Page 14: Tckp(2 projects)khaled

PARKING AREA

Tour

ists

faci

lity

PRO

POSE

D

PROJECT -Tourists facility and family Cottages at Batta Kundi NarranADP.NO -- 626-120890 (2013-14)

Estimated cost- 50.16 M

PRO

POSE

D

PRO

POSE

D

ROAD ROAD

GATEEX

ISTI

NG

PARKING AREA PROPOSED SCOPE OF WORK•TOURISTS FACILITY 44 NO OF ROOMS •6 NO OF FAMILY COTTAGES •EXISTING BUILDING RENOVATION

Project Details.TOTAL PLOT (52923.643 square ft.)194.39 MARLA9.7 KANALTourists facility 11785.2 SFTfamily Cottage (819.250 s ft.)PROPOSED VERANDAH (207.000 square ft.)

Page 15: Tckp(2 projects)khaled

(5892.609 square ft.)

(5892.609 square ft.)GROUND FLOOR PLAN

ROOM10'X10'

ROOM10'X10'

PASSAGE 6'-0" WIDE

TOTAL ROOM 22

FIRST FLOOR PLAN

TOTAL ROOM 22

PASSAGE 6'-0" WIDE

PASSAGE 6'-0" WIDE

PASSAGE 6'-0" WIDE

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

ROOM10'X10'

RECEPTION20'-0"x19'-3"

HALL14'X22'

PANTRY9'X10'

WC5'X4'

WC

RECEPTION20'-0"x19'-3"

KITCHEN14'X12'

VER: 10'-0" WIDE

UPUP

UP

UP

UP UP

WC

WC

WC

WC

WC

WC

WC

WC

WC

WC

Page 16: Tckp(2 projects)khaled

PROPOSED COTTAGE(562.48 s f t.)

COTTAGE

Page 17: Tckp(2 projects)khaled

PROJECT – CONSTRUTION OF REST HOUSE AT NATHYA GALLI ADP NO-625-120647 -2013 2014 Estimated Cost – 26.01M

Project DetailsTOTAL PLOT AREA 2.44PROPOSED (1) – 487.403 SFTPROPOSED (2) – 755 .688 SFT CAR PARKING – 871.691 SFT PROPOSED SCOPE OF WORK•RETAINING WALL•BACK FILLING•3 NO OF NEW BUILDINGS ADDITION WITH CHALET NO .1

Page 18: Tckp(2 projects)khaled
Page 19: Tckp(2 projects)khaled

PROPJECT - REHIBILITATION OF REST HOUSE AT TANDYANI.ADP NO – 625-120647 -2013-2014 Estimated Cost– 6.409M ADP COMBINE .

PROPOSED SCOPE OF WORK• RENOVATION OF OLD REST HOUSE •RETAING WALL•FENCING

Page 20: Tckp(2 projects)khaled

PROPOSED SCOPE OF WORK•OLD BUILDING RENOVATION•GRILLS •STAIRS REPAIRING•RETAINING WALL

PROJECT – REHIBILITATION OF REST HOUSE & CHILDREN PARK AT BAHRAIN ADP NO – 625-120647-2013-2014 Estimated Cost- 6.456 M

Page 21: Tckp(2 projects)khaled