Below is a flowchart describing 40 CFR Part 60, Subpart Y. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to
40 CFR Part 60, Subpart Y(1 of 32)
Start
Are the following affected facilities located in a
coal preparation plant with a design capacity of > 200 tons per day: thermal dryer, pneumatic coal
cleaning, coal processing and conveying, coal storage, coal transfer and
loading systems? NSPS Subpart Y does not apply.
No
§60.250(a)§60.251
End
No
The Federally Enforceable Requirements are
contained in the Operating Permit's Special Terms
and Conditions
Yes
The plant has an option to enforceably limit
its operating level to less than 200 tons per day. Does the plant
choose this option?
60Y.001
Yes
No
30
The plant contains an open storage pile, as defined in §60.251,
as an affected facility.
§60.250(d)
Yes
Was the open storage pile constructed,
reconstructed or modified after 05/27/2009?
Yes
NSPS Subpart Y does not apply.
End
No
§60.250(d)
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
Did construction,reconstruction, or modification
of any of the affected facilities commence after 10/27/1974 and on or
before 04/28/2008?
1
§60.250(b)
No
5
30
Yes
Did the construction, reconstruction,
or modification of any of the affected facilities commence before
10/27/1974?
YesNSPS Subpart Y does
not apply.
End
§60.250(b)
No
40 CFR Part 60, Subpart Y(2 of 32)
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(3 of 32)
Is theaffected facility a thermal
dryer?3
§60.252(a)
PM
Comply with the following:Standard
§60.252(a)(1)§60.252(a)§60.256(a)
Monitoring/Testing§60.255(a)
§60.256(a), (a)(1), (a)(1)(i)§60.256(a)(2)
§60.257(b), (b)(1)-(4)[G]§60.257(b)(5)
1 No
Yes
2
Is a wet scrubber used as an emission control equipment?
§60.256(a)(1)(ii)
Comply with the following:Monitoring/Testing[G]§60.256(a)(1)(ii)
Are the thermal dryers receiving all of their
thermal input from an affected facility covered under another 40 CFR
part 60 subpart?
Meet the Applicable Requirements in that subpart and not the Requirements in
this subpart
NoEnd
Yes
No
§60.252(c)
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(4 of 32)
3
Comply with the following:Standard
§60.253(a)(1)§60.253(a)
Monitoring/Testing§60.255(a)
Is the affectedfacility pneumatic coal cleaning
equipment?
§60.253(a)
No 36
4
Yes
PM
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(5 of 32)
PM (Opacity)
Comply with the following:Standard
§60.252(a)(2)§60.252(a)§60.256(a)§60.257(a)
Monitoring/Testing§60.255(a)
§60.256(a), (a)(1)§60.256(a)(1)(i), (a)(2)
§60.257(a), [G](a)(1)-(3)
End
Is a wet scrubber used as emission control
equipment?
§60.256(a)(1)(ii)
2
Comply with the following:Monitoring/Testing[G]§60.256(a)(1)(ii)
YesNo
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(6 of 32)
4
End
Comply with the following:Standard
§60.254(a)§60.257(a)
Monitoring/Testing§60.255(a)
§60.257(a), [G](a)(1)-(3)
Comply with the following:Standard
§60.253(a)(2)§60.253(a)§60.257(a)
Monitoring/Testing§60.255(a)
§60.257(a), [G](a)(1)-(3)
PM (Opacity)PM (Opacity)
36
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(7 of 32)
Is the affectedfacility a thermal dryer
constructed or reconstructedafter 04/28/2008?
10
§60.252(b)(1)(i)
PM
Comply with the following:Standard
§60.252(b)(1)(i)(A)§60.252(b), (b)(1)(i)
[G]§60.255(e)Monitoring/Testing
§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), [G](b)(5)
Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)
Reporting§60.258(b), (c)-(d)
5
No
Are the thermal dryers receiving all of their
thermal input from an affected facility covered under another 40 CFR
part 60 subpart?
Meet the Applicable Requirements in that subpart and not the
Requirements in this subpart
No End
§60.252(c)
13
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(8 of 32)
13
Is the bag leak detection system used to comply with
provisions of this subpart and continuously operated according to the requirements
in §60.256(c)(1)-(3)?
§60.256(c)
Comply with the following:Standard
§60.256(c), (c)(1), (c)(1)(i)§60.256(c)(2)
Monitoring/Testing§60.256(c)(1)(i), (c)(1)(iii)-(viii)
§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)
Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)
[G]§60.258(a)(7)Reporting
§60.256(c)(2), (c)(2)(vi)
No
31
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(9 of 32)
6
Is the control device a wet
scrubber?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
31
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
Yes
No
Yes
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(10 of 32)
PM (Opacity)
Comply with the following:Standard
§60.252(b)(1)(i)(B)§60.252(b), (b)(1)(i)
§60.257(a)Monitoring/Testing
§60.255(b)§60.257(a), [G](a)(1)-(3)
§60.257(b), (b)(1)-(4)Recordkeeping
§60.258(a), (a)(1)-(4)Reporting
§60.258(b), (b)(3), (c)-(d)
6
Are you electing to comply
with the requirements of §60.255(f)(1)
or (2)?
§60.255(f)(2)
Comply with the following:Monitoring/Testing
[G]§60.255(g)
24
Are you using a COMS to
comply with the requirements of §60.255(g)(1)
and (2)?
§60.255(g)(2)
No
Comply with the following:Monitoring/Testing
[G]§60.255(f)Yes
Yes
Comply with the following:Monitoring/Testing
[G]§60.255(b)(2)
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(11 of 32)
15
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
Is a monitoringplan for a digital opacity
compliance systembeing used?
§60.258(a)(8)
Comply with the following:Recordkeeping§60.258(a)(8)
24
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
No
Yes
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(12 of 32)
12
§60.252(b)(1)(ii)
PM
Comply with the following:Standard
§60.252(b)(1)(ii)(A)§60.252(b), (b)(1)(ii)
[G]§60.255(e)Monitoring/Testing
§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4)
[G]§60.257(b)(5)Recordkeeping
§60.258(a), (a)(1), (a)(3)§60.258(a)(4)
Reporting§60.258(b), (c)-(d)
10
Is the affectedfacility a thermal dryer modified
after 04/28/2008?No
Are the thermal dryersreceiving all of their thermal
input from an affected facility covered under another 40 CFR Part
60 subpart?
Meet the Applicable Requirements in that subpart and not the Requirements in
this subpart
Yes
No End
Yes
§60.252(c)
21
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(13 of 32)
32
21
Is the bag leak detection system used to comply with
provisions of this subpart and continuously operated according to the requirements
in §60.256(c)(1)-(3)?
§60.256(c)
Comply with the following:Standard
§60.256(c), (c)(1), (c)(1)(i)§60.256(c)(2)
Monitoring/Testing§60.256(c)(1)(i), (c)(1)(iii)-(viii)
§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)
Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)
§60.258(a)(7)Reporting
§60.256(c)(2), (c)(2)(vi)
Yes
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(14 of 32)
11
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
32
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
Yes
No
Yes
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(15 of 32)
PM (Opacity)
Comply with the following:Standard
§60.252(b)(1)(ii)(B)§60.252(b), (b)(1)(ii)
§60.257(a)Monitoring/Testing
§60.255(b)§60.257(a), [G](a)(1)-(3)
§60.257(b), (b)(1)-(4)Recordkeeping
§60.258(a), (a)(1)-(4)Reporting
§60.258(b), (b)(3), (c), (d)
11
Are you electing to
comply with the requirements of §60.255(f)(1)
or (2)?
§60.255(f)(2)
Comply with the following:Monitoring/Testing
[G]§60.255(g)
23
Are you using a COMS to
comply with the requirements of §60.255(g)(1)
and (2)?
§60.255(g)(2)
No
Comply with the following:Monitoring/Testing
[G]§60.255(f)Yes
Yes
Comply with the following:Monitoring/Testing
[G]§60.255(b)(2)
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(16 of 32)
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
Is a monitoringplan for a digital opacity
compliance systembeing used?
§60.258(a)(8)
Comply with the following:Recordkeeping§60.258(a)(8)
23
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
Yes
No
Yes
No 15
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(17 of 32)
Was the thermal dryer
constructed, reconstructed or modified after 05/27/2009?
§60.252(b)(2)
End
Do the thermal dryers receive all of their thermal input from a source
other than coal or residual oil, or receive all of theirthermal input from a source subject to an SO2 limit under another
subpart of 40 CFR Part 60, or that use waste heat or residual from the combustion of coal or
residual oil as their only input?
§60.252(b)(2)(iii)
17
No
16
SO2
15
Yes
No
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(18 of 32)
16
Does the facility operate with a
wet scrubber?
§60.258(b)(1)
Comply with the following:Reporting
§60.258(b)(1)
Does the facilityoperate with a control equipment other than
a wet scrubber?
Comply with the following:Reporting
§60.258(b)(2)
§60.258(b)(2)
Yes
No
Comply with the following:Standard
§60.252(b)(2)(i)§60.252(b), (b)(2)
Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)
§60.257(b), (b)(1)-(4), (b)(6)Recordkeeping
§60.258(a), (a)(1), (a)(3)-(4)Reporting
§60.258(b), (c), (d)
Is the owner or operator of a thermal dryer complying with emission limitation of
§60.252(b)(2)(i)? §60.252(b)(2)(i)
Comply with the following: Standard
§60.252(b)(2)(ii)§60.252(b), (b)(2)
Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)
§60.257(b), (b)(1)-(4), (b)(6)Recordkeeping
§60.258(a), (a)(1), (a)(3)-(4)Reporting
§60.258(b), (c), (d)
Yes
17
YesNo
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(19 of 32)
Is the thermal dryer constructed after
05/27/2009?
§60.252(b)(3)(i)
17
End
§60.252(b)(3)(iii)
18
Do the thermal dryers receive all of their thermal input
from a source other than coal or residual oil, or receive all of their thermal input from a
source subject to a NOx limit and/or CO limit under another subpart of 40 CFR Part 60, or that use waste
heat or residual from the combustion of coal or residual oil as
their only input?
No
NOx/COYes
No
27
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(20 of 32)
Comply with the following:Standard
§60.252(b)(3)(i)§60.252(b), (b)(3)
Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), (b)(7)-(8)
Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)
Reporting§60.258(b), (c), (d)
27
End
Does the facility operate with a wet
scrubber?
§60.258(b)(1)
Comply with the following:Reporting
§60.258(b)(1)
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
Comply with the following:Reporting
§60.258(b)(2)
No
Yes
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(21 of 32)
Is the thermal dryer reconstructed
or modified after 05/27/2009?
§60.252(b)(3)(ii)
Comply with the following:Standard
§60.252(b)(3)(ii)§60.252(b), (b)(3)
Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), (b)(7)-(8)
Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)
Reporting§60.258(b), (c), (d)
18 End
NOx/CO
No
28
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(22 of 32)
End
Does the facility operate with a wet
scrubber?
§60.258(b)(1)
Comply with the following:Reporting
§60.258(b)(1)
Yes
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
Comply with the following:Reporting
§60.258(b)(2)
No
Yes
28
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(23 of 32)
12
Is the affected facility a mechanical vent constructed,
reconstructed or modified after April 28, 2008?
No
Comply with the following:Standard
§60.254(b)(2)
§60.254(b)(2)
§60.254(b)[G]§60.255(e)
§60.256(b)Monitoring/Testing
§60.255(b), (b)(1), (b)(1)(iii)§60.256(b)
Recordkeeping§60.258(a), (a)(1), (a)(3)
§60.258(a)(4)Reporting
§60.258(b), (c), (d)
Is the control deviceused with a PM emission rate
of 1.0 Mg (1.1 tons) per year or less and meets the requirements of
§60.255(d)(1)-(3)?
Comply with the following:Monitoring/Testing§60.255(b)(1)(i)-(ii)
§60.255(d)
19
PM
14
Comply with the following:Standard
§60.255(d)
Yes
No
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(24 of 32)
19
§60.256(b)(1)
Yes
20No
Does the mechanical vent have
a fabric filter (baghouse) with a design controlled PM emission rate
of 25 Mg (28 tons) per year or more?
Comply with the following:Standard
§60.256(b)(1)§60.256(c), (c)(1), (c)(1)(i)
§60.256(c)(2)Monitoring/Testing§60.256(b)(1), (b)(3)
§60.256(c)(1)(i), (c)(1)(iii)-(viii)§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)
Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)[G]§60.258(a)(7), (a)(10)
Reporting§60.256(c)(2), (c)(2)(vi)
§60.258(b)(2)
End
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(25 of 32)
20
Does the owner or operator of an affected
facility have one or more mechanical vents that uses a wet scrubber
as a control device?
Yes
§60.256(b)(2)
No
Comply with the following:Monitoring/Testing
[G]§60.256(b)(2)Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Monitoring/Testing
[G]§60.256(b)(3)Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
End
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(26 of 32)
14
Is the affectedfacility a coal processing
and conveying equipment, coal storage system, transfer and
loading system?
No
§60.254(b)
PM (Opacity)
7
25
Comply with the following:Standard
§60.254(b)(1)§60.254(b)§60.255(c)§60.257(a)
Monitoring/Testing§60.255(b)
§60.257(a), [G](a)(1)-(3)Recordkeeping
§60.258(a), (a)(1)-(4)Reporting
§60.258(b), (b)(3), (c)-(d)
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(27 of 32)
25
Are you electing to comply
with the requirements of §60.255(f)(1)
or (2)?
§60.255(f)(2)
Comply with the following:Monitoring/Testing
[G]§60.255(g)
26
Are you using a COMS to
comply with the requirements of §60.255(g)(1)
and (2)?
§60.255(g)(2)
No
Comply with the following:Monitoring/Testing
[G]§60.255(f)Yes
Yes
Comply with the following:Monitoring/Testing
[G]§60.255(b)(2)
No
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(28 of 32)
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
Is a monitoringplan for a digital opacity
compliance systembeing used?
§60.258(a)(8)
Comply with the following:Recordkeeping§60.258(a)(8)
Yes
26
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
Yes
No
Yes
No End
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
7
Comply with the following:Standard
§60.253(b)(1)§60.253(b)
[G]§60.255(e)Monitoring/Testing
§60.255(b), (b)(1), (b)(1)(iii)Recordkeeping
§60.258(a), (a)(1), (a)(3)-(4)Reporting
§60.258(b), (c)-(d)
Yes
Comply with the following:Monitoring/Testing§60.255(b)(1)(i)-(ii)
8
§60.255(d)
Is a control deviceused with a PM emission rate
of 1.0 Mg (1.1 tons) per year or less and meets the requirements of
§60.255(d)(1)-(3)?
Yes
Comply with the following:Standard
§60.255(d)
PM
No
The affected facility is pneumatic coal
cleaning equipment?
40 CFR Part 60, Subpart Y(29 of 32)
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(30 of 32)
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
8
9
Is the bag leak detectionsystem used to comply with provisions
of this subpart and continuously operated according to the requirements in
§60.256(c)(1)-(3)?
§60.256(c)
Comply with the following:Standard
§60.256(c), (c)(1), (c)(1)(i), (c)(2)Monitoring/Testing
§60.256(c)(1)(i), (c)(1)(iii)-(viii)§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)
Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)
§60.258(a)(7)Reporting
§60.256(c)(2), (c)(2)(vi)
Yes
No
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
No
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(31 of 32)
9
Comply with the following:Standard
§60.253(b)(2)§60.253(b)§60.257(a)
Monitoring/Testing§60.255(b)
§60.257(a), [G](a)(1)-(3)Recordkeeping
§60.258(a), (a)(1)-(4)Reporting
§60.258(b), (b)(3), (c)-(d)
PM (Opacity)
Are you electing to
comply with the requirements of §60.255(f)(1)
or (2)?
§60.255(f)(2)
Comply with the following:Monitoring/Testing
[G]§60.255(g)
22
Are youusing a COMS to
comply with the requirements of §60.255(g)(1)
and (2)?
§60.255(g)(2)
No
Comply with the following:Monitoring/Testing
[G]§60.255(f)Yes
Comply with the following:Monitoring/Testing
[G]§60.255(b)(2)
No
Yes
Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***
40 CFR Part 60, Subpart Y(32 of 32)
Is a wet scrubber used during the
performance test?
§60.258(a)(9)
Comply with the following:Recordkeeping§60.258(a)(9)
Reporting§60.258(b)(1)
Comply with the following:Recordkeeping§60.258(a)(10)
Reporting§60.258(b)(2)
Is a monitoringplan for a digital opacity
compliance systembeing used?
§60.258(a)(8)
Comply with the following:Recordkeeping§60.258(a)(8)
22
Does the facilityoperate with a control equipment other than
a wet scrubber?
§60.258(b)(2)
No
No
Yes
No End