Below is a flowchart describing 40 CFR Part 60, Subpart Y. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to 40 CFR Part 60, Subpart Y (1 of 32) Start Are the following affected facilities located in a coal preparation plant with a design capacity of > 200 tons per day: thermal dryer, pneumatic coal cleaning, coal processing and conveying, coal storage, coal transfer and loading systems? NSPS Subpart Y does not apply. No §60.250(a) §60.251 End No The Federally Enforceable Requirements are contained in the Operating Permit's Special Terms and Conditions Yes The plant has an option to enforceably limit its operating level to less than 200 tons per day. Does the plant choose this option? 60Y.001 Yes No 30 The plant contains an open storage pile, as defined in §60.251, as an affected facility. §60.250(d) Yes Was the open storage pile constructed, reconstructed or modified after 05/27/2009? Yes NSPS Subpart Y does not apply. End No §60.250(d) Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

Upload: dangdat

Post on 19-Apr-2019

251 views

Category:

Documents


0 download

TRANSCRIPT

Below is a flowchart describing 40 CFR Part 60, Subpart Y. It will likely not be accessible using a screen reader. For the text of the statute/rule, please go to

40 CFR Part 60, Subpart Y(1 of 32)

Start

Are the following affected facilities located in a

coal preparation plant with a design capacity of > 200 tons per day: thermal dryer, pneumatic coal

cleaning, coal processing and conveying, coal storage, coal transfer and

loading systems? NSPS Subpart Y does not apply.

No

§60.250(a)§60.251

End

No

The Federally Enforceable Requirements are

contained in the Operating Permit's Special Terms

and Conditions

Yes

The plant has an option to enforceably limit

its operating level to less than 200 tons per day. Does the plant

choose this option?

60Y.001

Yes

No

30

The plant contains an open storage pile, as defined in §60.251,

as an affected facility.

§60.250(d)

Yes

Was the open storage pile constructed,

reconstructed or modified after 05/27/2009?

Yes

NSPS Subpart Y does not apply.

End

No

§60.250(d)

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

Did construction,reconstruction, or modification

of any of the affected facilities commence after 10/27/1974 and on or

before 04/28/2008?

1

§60.250(b)

No

5

30

Yes

Did the construction, reconstruction,

or modification of any of the affected facilities commence before

10/27/1974?

YesNSPS Subpart Y does

not apply.

End

§60.250(b)

No

40 CFR Part 60, Subpart Y(2 of 32)

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(3 of 32)

Is theaffected facility a thermal

dryer?3

§60.252(a)

PM

Comply with the following:Standard

§60.252(a)(1)§60.252(a)§60.256(a)

Monitoring/Testing§60.255(a)

§60.256(a), (a)(1), (a)(1)(i)§60.256(a)(2)

§60.257(b), (b)(1)-(4)[G]§60.257(b)(5)

1 No

Yes

2

Is a wet scrubber used as an emission control equipment?

§60.256(a)(1)(ii)

Comply with the following:Monitoring/Testing[G]§60.256(a)(1)(ii)

Are the thermal dryers receiving all of their

thermal input from an affected facility covered under another 40 CFR

part 60 subpart?

Meet the Applicable Requirements in that subpart and not the Requirements in

this subpart

NoEnd

Yes

No

§60.252(c)

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(4 of 32)

3

Comply with the following:Standard

§60.253(a)(1)§60.253(a)

Monitoring/Testing§60.255(a)

Is the affectedfacility pneumatic coal cleaning

equipment?

§60.253(a)

No 36

4

Yes

PM

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(5 of 32)

PM (Opacity)

Comply with the following:Standard

§60.252(a)(2)§60.252(a)§60.256(a)§60.257(a)

Monitoring/Testing§60.255(a)

§60.256(a), (a)(1)§60.256(a)(1)(i), (a)(2)

§60.257(a), [G](a)(1)-(3)

End

Is a wet scrubber used as emission control

equipment?

§60.256(a)(1)(ii)

2

Comply with the following:Monitoring/Testing[G]§60.256(a)(1)(ii)

YesNo

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(6 of 32)

4

End

Comply with the following:Standard

§60.254(a)§60.257(a)

Monitoring/Testing§60.255(a)

§60.257(a), [G](a)(1)-(3)

Comply with the following:Standard

§60.253(a)(2)§60.253(a)§60.257(a)

Monitoring/Testing§60.255(a)

§60.257(a), [G](a)(1)-(3)

PM (Opacity)PM (Opacity)

36

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(7 of 32)

Is the affectedfacility a thermal dryer

constructed or reconstructedafter 04/28/2008?

10

§60.252(b)(1)(i)

PM

Comply with the following:Standard

§60.252(b)(1)(i)(A)§60.252(b), (b)(1)(i)

[G]§60.255(e)Monitoring/Testing

§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), [G](b)(5)

Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)

Reporting§60.258(b), (c)-(d)

5

No

Are the thermal dryers receiving all of their

thermal input from an affected facility covered under another 40 CFR

part 60 subpart?

Meet the Applicable Requirements in that subpart and not the

Requirements in this subpart

No End

§60.252(c)

13

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(8 of 32)

13

Is the bag leak detection system used to comply with

provisions of this subpart and continuously operated according to the requirements

in §60.256(c)(1)-(3)?

§60.256(c)

Comply with the following:Standard

§60.256(c), (c)(1), (c)(1)(i)§60.256(c)(2)

Monitoring/Testing§60.256(c)(1)(i), (c)(1)(iii)-(viii)

§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)

Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)

[G]§60.258(a)(7)Reporting

§60.256(c)(2), (c)(2)(vi)

No

31

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(9 of 32)

6

Is the control device a wet

scrubber?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

31

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

Yes

No

Yes

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(10 of 32)

PM (Opacity)

Comply with the following:Standard

§60.252(b)(1)(i)(B)§60.252(b), (b)(1)(i)

§60.257(a)Monitoring/Testing

§60.255(b)§60.257(a), [G](a)(1)-(3)

§60.257(b), (b)(1)-(4)Recordkeeping

§60.258(a), (a)(1)-(4)Reporting

§60.258(b), (b)(3), (c)-(d)

6

Are you electing to comply

with the requirements of §60.255(f)(1)

or (2)?

§60.255(f)(2)

Comply with the following:Monitoring/Testing

[G]§60.255(g)

24

Are you using a COMS to

comply with the requirements of §60.255(g)(1)

and (2)?

§60.255(g)(2)

No

Comply with the following:Monitoring/Testing

[G]§60.255(f)Yes

Yes

Comply with the following:Monitoring/Testing

[G]§60.255(b)(2)

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(11 of 32)

15

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

Is a monitoringplan for a digital opacity

compliance systembeing used?

§60.258(a)(8)

Comply with the following:Recordkeeping§60.258(a)(8)

24

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

No

Yes

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(12 of 32)

12

§60.252(b)(1)(ii)

PM

Comply with the following:Standard

§60.252(b)(1)(ii)(A)§60.252(b), (b)(1)(ii)

[G]§60.255(e)Monitoring/Testing

§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4)

[G]§60.257(b)(5)Recordkeeping

§60.258(a), (a)(1), (a)(3)§60.258(a)(4)

Reporting§60.258(b), (c)-(d)

10

Is the affectedfacility a thermal dryer modified

after 04/28/2008?No

Are the thermal dryersreceiving all of their thermal

input from an affected facility covered under another 40 CFR Part

60 subpart?

Meet the Applicable Requirements in that subpart and not the Requirements in

this subpart

Yes

No End

Yes

§60.252(c)

21

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(13 of 32)

32

21

Is the bag leak detection system used to comply with

provisions of this subpart and continuously operated according to the requirements

in §60.256(c)(1)-(3)?

§60.256(c)

Comply with the following:Standard

§60.256(c), (c)(1), (c)(1)(i)§60.256(c)(2)

Monitoring/Testing§60.256(c)(1)(i), (c)(1)(iii)-(viii)

§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)

Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)

§60.258(a)(7)Reporting

§60.256(c)(2), (c)(2)(vi)

Yes

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(14 of 32)

11

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

32

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

Yes

No

Yes

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(15 of 32)

PM (Opacity)

Comply with the following:Standard

§60.252(b)(1)(ii)(B)§60.252(b), (b)(1)(ii)

§60.257(a)Monitoring/Testing

§60.255(b)§60.257(a), [G](a)(1)-(3)

§60.257(b), (b)(1)-(4)Recordkeeping

§60.258(a), (a)(1)-(4)Reporting

§60.258(b), (b)(3), (c), (d)

11

Are you electing to

comply with the requirements of §60.255(f)(1)

or (2)?

§60.255(f)(2)

Comply with the following:Monitoring/Testing

[G]§60.255(g)

23

Are you using a COMS to

comply with the requirements of §60.255(g)(1)

and (2)?

§60.255(g)(2)

No

Comply with the following:Monitoring/Testing

[G]§60.255(f)Yes

Yes

Comply with the following:Monitoring/Testing

[G]§60.255(b)(2)

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(16 of 32)

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

Is a monitoringplan for a digital opacity

compliance systembeing used?

§60.258(a)(8)

Comply with the following:Recordkeeping§60.258(a)(8)

23

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

Yes

No

Yes

No 15

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(17 of 32)

Was the thermal dryer

constructed, reconstructed or modified after 05/27/2009?

§60.252(b)(2)

End

Do the thermal dryers receive all of their thermal input from a source

other than coal or residual oil, or receive all of theirthermal input from a source subject to an SO2 limit under another

subpart of 40 CFR Part 60, or that use waste heat or residual from the combustion of coal or

residual oil as their only input?

§60.252(b)(2)(iii)

17

No

16

SO2

15

Yes

No

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(18 of 32)

16

Does the facility operate with a

wet scrubber?

§60.258(b)(1)

Comply with the following:Reporting

§60.258(b)(1)

Does the facilityoperate with a control equipment other than

a wet scrubber?

Comply with the following:Reporting

§60.258(b)(2)

§60.258(b)(2)

Yes

No

Comply with the following:Standard

§60.252(b)(2)(i)§60.252(b), (b)(2)

Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)

§60.257(b), (b)(1)-(4), (b)(6)Recordkeeping

§60.258(a), (a)(1), (a)(3)-(4)Reporting

§60.258(b), (c), (d)

Is the owner or operator of a thermal dryer complying with emission limitation of

§60.252(b)(2)(i)? §60.252(b)(2)(i)

Comply with the following: Standard

§60.252(b)(2)(ii)§60.252(b), (b)(2)

Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)

§60.257(b), (b)(1)-(4), (b)(6)Recordkeeping

§60.258(a), (a)(1), (a)(3)-(4)Reporting

§60.258(b), (c), (d)

Yes

17

YesNo

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(19 of 32)

Is the thermal dryer constructed after

05/27/2009?

§60.252(b)(3)(i)

17

End

§60.252(b)(3)(iii)

18

Do the thermal dryers receive all of their thermal input

from a source other than coal or residual oil, or receive all of their thermal input from a

source subject to a NOx limit and/or CO limit under another subpart of 40 CFR Part 60, or that use waste

heat or residual from the combustion of coal or residual oil as

their only input?

No

NOx/COYes

No

27

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(20 of 32)

Comply with the following:Standard

§60.252(b)(3)(i)§60.252(b), (b)(3)

Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), (b)(7)-(8)

Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)

Reporting§60.258(b), (c), (d)

27

End

Does the facility operate with a wet

scrubber?

§60.258(b)(1)

Comply with the following:Reporting

§60.258(b)(1)

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

Comply with the following:Reporting

§60.258(b)(2)

No

Yes

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(21 of 32)

Is the thermal dryer reconstructed

or modified after 05/27/2009?

§60.252(b)(3)(ii)

Comply with the following:Standard

§60.252(b)(3)(ii)§60.252(b), (b)(3)

Monitoring/Testing§60.255(b), (b)(1), (b)(1)(i)-(iii)§60.257(b), (b)(1)-(4), (b)(7)-(8)

Recordkeeping§60.258(a), (a)(1), (a)(3)-(4)

Reporting§60.258(b), (c), (d)

18 End

NOx/CO

No

28

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(22 of 32)

End

Does the facility operate with a wet

scrubber?

§60.258(b)(1)

Comply with the following:Reporting

§60.258(b)(1)

Yes

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

Comply with the following:Reporting

§60.258(b)(2)

No

Yes

28

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(23 of 32)

12

Is the affected facility a mechanical vent constructed,

reconstructed or modified after April 28, 2008?

No

Comply with the following:Standard

§60.254(b)(2)

§60.254(b)(2)

§60.254(b)[G]§60.255(e)

§60.256(b)Monitoring/Testing

§60.255(b), (b)(1), (b)(1)(iii)§60.256(b)

Recordkeeping§60.258(a), (a)(1), (a)(3)

§60.258(a)(4)Reporting

§60.258(b), (c), (d)

Is the control deviceused with a PM emission rate

of 1.0 Mg (1.1 tons) per year or less and meets the requirements of

§60.255(d)(1)-(3)?

Comply with the following:Monitoring/Testing§60.255(b)(1)(i)-(ii)

§60.255(d)

19

PM

14

Comply with the following:Standard

§60.255(d)

Yes

No

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(24 of 32)

19

§60.256(b)(1)

Yes

20No

Does the mechanical vent have

a fabric filter (baghouse) with a design controlled PM emission rate

of 25 Mg (28 tons) per year or more?

Comply with the following:Standard

§60.256(b)(1)§60.256(c), (c)(1), (c)(1)(i)

§60.256(c)(2)Monitoring/Testing§60.256(b)(1), (b)(3)

§60.256(c)(1)(i), (c)(1)(iii)-(viii)§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)

Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)[G]§60.258(a)(7), (a)(10)

Reporting§60.256(c)(2), (c)(2)(vi)

§60.258(b)(2)

End

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(25 of 32)

20

Does the owner or operator of an affected

facility have one or more mechanical vents that uses a wet scrubber

as a control device?

Yes

§60.256(b)(2)

No

Comply with the following:Monitoring/Testing

[G]§60.256(b)(2)Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Monitoring/Testing

[G]§60.256(b)(3)Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

End

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(26 of 32)

14

Is the affectedfacility a coal processing

and conveying equipment, coal storage system, transfer and

loading system?

No

§60.254(b)

PM (Opacity)

7

25

Comply with the following:Standard

§60.254(b)(1)§60.254(b)§60.255(c)§60.257(a)

Monitoring/Testing§60.255(b)

§60.257(a), [G](a)(1)-(3)Recordkeeping

§60.258(a), (a)(1)-(4)Reporting

§60.258(b), (b)(3), (c)-(d)

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(27 of 32)

25

Are you electing to comply

with the requirements of §60.255(f)(1)

or (2)?

§60.255(f)(2)

Comply with the following:Monitoring/Testing

[G]§60.255(g)

26

Are you using a COMS to

comply with the requirements of §60.255(g)(1)

and (2)?

§60.255(g)(2)

No

Comply with the following:Monitoring/Testing

[G]§60.255(f)Yes

Yes

Comply with the following:Monitoring/Testing

[G]§60.255(b)(2)

No

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(28 of 32)

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

Is a monitoringplan for a digital opacity

compliance systembeing used?

§60.258(a)(8)

Comply with the following:Recordkeeping§60.258(a)(8)

Yes

26

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

Yes

No

Yes

No End

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

7

Comply with the following:Standard

§60.253(b)(1)§60.253(b)

[G]§60.255(e)Monitoring/Testing

§60.255(b), (b)(1), (b)(1)(iii)Recordkeeping

§60.258(a), (a)(1), (a)(3)-(4)Reporting

§60.258(b), (c)-(d)

Yes

Comply with the following:Monitoring/Testing§60.255(b)(1)(i)-(ii)

8

§60.255(d)

Is a control deviceused with a PM emission rate

of 1.0 Mg (1.1 tons) per year or less and meets the requirements of

§60.255(d)(1)-(3)?

Yes

Comply with the following:Standard

§60.255(d)

PM

No

The affected facility is pneumatic coal

cleaning equipment?

40 CFR Part 60, Subpart Y(29 of 32)

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(30 of 32)

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

8

9

Is the bag leak detectionsystem used to comply with provisions

of this subpart and continuously operated according to the requirements in

§60.256(c)(1)-(3)?

§60.256(c)

Comply with the following:Standard

§60.256(c), (c)(1), (c)(1)(i), (c)(2)Monitoring/Testing

§60.256(c)(1)(i), (c)(1)(iii)-(viii)§60.256(c)(2), (c)(2)(i)-(iv)§60.256(c)(2)(vi), [G](c)(3)

Recordkeeping§60.256(c)(1)(ii), (c)(2)(v)

§60.258(a)(7)Reporting

§60.256(c)(2), (c)(2)(vi)

Yes

No

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

No

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(31 of 32)

9

Comply with the following:Standard

§60.253(b)(2)§60.253(b)§60.257(a)

Monitoring/Testing§60.255(b)

§60.257(a), [G](a)(1)-(3)Recordkeeping

§60.258(a), (a)(1)-(4)Reporting

§60.258(b), (b)(3), (c)-(d)

PM (Opacity)

Are you electing to

comply with the requirements of §60.255(f)(1)

or (2)?

§60.255(f)(2)

Comply with the following:Monitoring/Testing

[G]§60.255(g)

22

Are youusing a COMS to

comply with the requirements of §60.255(g)(1)

and (2)?

§60.255(g)(2)

No

Comply with the following:Monitoring/Testing

[G]§60.255(f)Yes

Comply with the following:Monitoring/Testing

[G]§60.255(b)(2)

No

Yes

Last Modified October 17, 2018 From 40 CFR Part 60, Subpart Y, Amended 10/08/2009 These flowcharts are for use by sources subject to the Federal Operating Permits Program only and are subject to change. ***

40 CFR Part 60, Subpart Y(32 of 32)

Is a wet scrubber used during the

performance test?

§60.258(a)(9)

Comply with the following:Recordkeeping§60.258(a)(9)

Reporting§60.258(b)(1)

Comply with the following:Recordkeeping§60.258(a)(10)

Reporting§60.258(b)(2)

Is a monitoringplan for a digital opacity

compliance systembeing used?

§60.258(a)(8)

Comply with the following:Recordkeeping§60.258(a)(8)

22

Does the facilityoperate with a control equipment other than

a wet scrubber?

§60.258(b)(2)

No

No

Yes

No End