1

TC 57

TC 57CIM Model Manager Report

Ljubljana Slovenia, June 11 – 14, 2013

[email protected]

Page 2: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

2

TC 57

CMM Responsibilities/Activities

4WG13 issues weekly discussions

4 Coordinate new CIM modeling

4Manage new issues4ENTSO-E

4 Coordinate with other TC57 model managers

4 UML model editor4Model check with jCleanCIM

4Maintain issues list and change log

P 2

Page 3: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

3

TC 57

CMM Issue Resolution Themes

4 Cross cutting common issues

4Quality improvement – documentation improvement

4 Issue Resolutions4Thin backlog, expire dead issues4Prioritize and combine4Steady progress4First priority on common issues4Control new issues to be solvable

P 3

Page 4: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

4

TC 57

Modeling Issues Meetings

4 Regular WG13 issues web conferences

4Weekly meetings 10:00 US Central, 17:00 EU Central

4 Typically 10 to 15 people attending

4 CMMs from WG14 and WG16 regularly attend

4 New requirements and issues incoming

4 Steady progress on solving issues and extend CIM

P 4

Page 5: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

5

TC 57

Issues summary

4WG13

4 Combined

Summer 2013 Winter 2012Open 58 68Closed 943 860Closed in period 83

Summer 2013 Winter 2012Open 24 37Closed 171 132Closed in period 39In review 16 19

P 5

Page 6: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

6

TC 57

Model Assembly from WG’s

P 6

4 One UML package per WG4 61970 support the other4 61968 depend on 619704 62325 depend on the other

4 Model synchronization

WG13619706196862325

WG14619706196862325

WG16619706196862325

Page 7: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

7

TC 57

CIM UML Files

4 Zip archive including4 complete EA file UML4WG13, WG14, WG16 and combined issues spread

sheets4Summary documents describing the CIM versions4Xmi files for import in other UML tools

4 iec61970cim16v22_iec61968cim12v07_iec62325cim03v01.zip4 61970 CIM16 version 224 61968 CIM12 version 74 62325 CIM3 version 1

P 7

Page 8: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

8

TC 57

WG13 Issues List Sample

IssueNo.

Authors /Contactinfo

DateSubmitted

Clause/Subclause/Paragraph/Figure/ Table

Description of Issue ProposedResolution

Decision

13_165 ENTSO-EN9

2013-05-29 ConrolArea ControlAreaGenratingUnit2: IOP suggest to clarify the usageof ControlAreaGenratingUnit:Perhaps WG16 opinion is neededas well. If the issue cannot beresolved fast we need to have anote to cover short term usage.3: we need some associations tobe able to have EnergySource,EquivalentInjection andExternalNetworkInjection in acontrolArea

It was identifiedthe the classesrequire betterdescription. Thepoor descriptionmade usersinvent newmodels insteadof using this one.

Thedescriptionsneed to beimproved.2013-06-05/LOO

13_166 ENTSO-EN10

2013-05-29 Domain Area data typeWe need Area = m2 datatype. Wealready have Volume datatype.

Add area datatype.

Updated 2013-06-01/LOO

P 8

Page 9: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

9

TC 57

CIM UML and Related Documents

UML

Documents

P 9

Page 10: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

10

TC 57

CIM 16 Roadmap 1

4 HVDC4Dependent on IEC 62747 for VSC

4 Dynamics4Standard models based on IEEE dynamic models4User defined in progress

4 Steady State Hypothesis (SSH) power flow input4Required to persist initial power flow conditions

4Grounding models4Support grounding circuitry and Petersen coils

4 Nonlinear shunt compensators

P 10

Page 11: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

11

TC 57

CIM 16 Roadmap 2

4 Updates of support for combined bus-branch andnode-breaker models

4 Short circuit calculation based on IEC 609094Parameters4Network equivalents

4 Phase shifter model updates

4 ENTSO-E issues4 Improved documentation to aid understanding4A few name changes to aid understanding4Several corrections and extensions

4 ICCP configuration dataP 11

Page 12: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

12

TC 57

CIM 16 Roadmap 3

4 Profiles supporting both transmission and distribution

4 Linkage between schedules and physical model

4 System Integrity Protection Schemes - SIPS

4 Smart grid4Load models

• New behaviour due to dynamic tariffs

4Energy sources dependent on weather• Wind• Solar• Marine

4Energy storage• Batteries• Flywheels

P 12

Page 13: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

13

TC 57

CIM 16 Roadmap 4

4Operational limits, dynamic line ratings4Most restrictive equipment4Environmental dependencies, temperature ,wind

4 Alternate equivalent network models

4 Power system projects4Support development the power system and

commissioning of new equipment

4 Improved modularization of UML4Stereotyping, used in profiling4Sub classing, e.g. the StateVariables4Multiple inheritance, not used yet

P 13

Page 14: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

14

TC 57

HVDC Components

Page 15: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

15

TC 57

Dynamics Standard ModelsExcAC6A

cla ss Excit a tionSy stemD...

ExcitationSystemDynamicsExcAC6A

+ ka :PU [0..1]+ ks :PU [0..1]+ ta :Seconds [0..1]+ tk :Seconds [0..1]+ tb :Seconds [0..1]+ tc :Seconds [0..1]+ vamax :PU [0..1]+ vamin :PU [0..1]+ vrmax :PU [0..1]+ vrmin :PU [0..1]+ te :Seconds [0..1]+ kh :PU [0..1]+ tj :Seconds [0..1]+ th :Seconds [0..1]+ vfelim :PU [0..1]+ vhmax :PU [0..1]+ kc :PU [0..1]+ kd :PU [0..1]+ ke :PU [0..1]+ ve1 :PU [0..1]+ seve1 :Float [0..1]+ ve2 :PU [0..1]+ seve2 :Float [0..1]

Page 16: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

16

TC 57

SSH

Steady-StateHypothesis

NetworkOperatingPractice

Device StatusInitialization/Edit

Topology &Network Solution

Algorithm

Energy Forecasts& Schedules

Measurements

Energy Allocationto Devices

Network StateVariables

Analog MeasInitialization/Edit

Energy InjectionInitialization/Edit

Control SettingInitialization/Edit

Physical ModelTime Extraction /

Edit

MonitoringInitialization/Edit

PlannedConstruction

NetworkConstruction

Contingencies

Outage Schedules

NetworkConstruction

- Measurements- Status

- Switch status- Branch end- Tap positions

- Control settings- Voltage regulation- Flow regulation- SIPS

- Monitoring- Operating limits- Ratings- Other

- Energy Injections- Bulk generation- Solar- Wind- Storage- Traditional Load- DR- etc,

- Equipment- Containment- Connectivity- Controls- SIPS- Equipment Ratings- GeoCoordinates- Schematics

- Equipment- Containment- Connectivity- Controls- SIPS- Equipment Ratings- GeoCoordinates

Bus Topology- TopologyNodes(connectivity to equip)

Bus Topology(Manual)

- BranchEnd State- Energized State- Island Topology- BusVoltage- Bus Injections- Terminal flows- Controls- Violations

- Normal Switch Pos- Normal Tap- Control Settings- Switching Schedule- Operational Limits

- Load allocation- Other.

- Const Plans

Standard DatasetsRepresenting

Network AnalysisCases

Standard DatasetsRequired from

Enterprise DataSources

Schematics

Dynamics - Status- Analogs

- events- monitoring

- demand, wind,storage, solar, bulkgen,etc

Changes inoperating practice(status, derate,…)

Short Circuit

Schematics

Dynamics

Short Circuit

Page 17: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

17

TC 57

Grounding Models

Page 18: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

18

TC 57

61970 CIM Current Status

4 61970 CIM154 Frozen February 20114 61970cim15v33 final release September 20114 61970-301 Edition 5 to IEC – February 2012

4 61970CIM164 61970cim16v10 tested at July 2012 ENTSO-E IOP4 61970cim16v22 as today 2013-06-114 61970cim16v2x to be tested at July 2013 ENTSO-E IOP

P 18

Page 19: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

19

TC 57

CIM15 Flashback4 Phase unbalanced models

4 New datatype primitives (#802 closed)

4 Dynamics model

4 Name – NameType model

4 New transformer model,4 unbalanced, tanks4 Phase shifter

4 Type (catalog) data support

4 Cuts and Jumpers

4 Auxiliary Equipment

4 Diagram layoutP 19

Page 20: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

20

TC 57

CIM 16 Scope As Today

4 HVDC

4 Dynamics standards models

4 Steady State Hypothesis

4 Grounding models

4 Nonlinear shunt compensators

4 Combined bus-branch and node-breaker models

4 Short circuit calculation based on IEC 60909

4 Phase shifter model updates

4 ENTSO-E issues

P 20

Page 21: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

21

TC 57

CIM16 Non-modeling issues

4 Headers/namespace

4 61850 - CIM exchange and harmonization

4 Standardization of profile creation

4 CIM for Enterprise Canonical Data Model

P 21

Page 22: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

22

TC 57

CIM Profiles

4 The CIM UML and related IEC documents (e.g. IEC61970-301) are huge and not practical for interfacedefinitions.

4 Profiles4Define interoperable semantic interfaces4Describe a subset of the UML4Are used to validate exchanged data4Are documented in ENTSO-E and IEC specifications4Mapped to CIM serialization formats

P 22

Page 23: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

23

TC 57

CIM Serialization Formats

4 XML4Used for general message exchange4Described by XML Schema4XML Schema generation rules in IEC 61968-100 (NDR)4Typically nested XML structures

4 CIMXML4Used for network model related exchanges4Described by RDFS/OWL4XML format rules described in IEC 61970-5524Typically flat XML structure with links btw. elements

P 23

Page 24: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

24

TC 57

Profiling Process and Instance Data

Information ModelCanonical CIM (UML)

Document Contextual Model

Shared Regional Contextual Model

Assembly Model

Syntactic Model

Instance Data

Manual Restrictions

Manual Restrictions

Manual Structuring ofPayload

Syntax/SchemaGeneration

Generate Instance Data

62325-351

Manual profiles generationNWIP will add rules to this

Instance files

CIMXML message syntax61970-552W3C XML

Canonical CIM619706196862325

Message Profile62325-451

Message gen62325-450

XML Schema generation62361-100

61970-4xx 61968-X

62325-352

XML Schema

W3C XML

Semantic Models- UML- XMI- RDFS (61970-501)- OWL (61970-505)

Profile

Described byXML SchemaCIMXML

Principle FlowFlow with existing specs(not complete nor accurate)

P 24

Page 25: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

25

TC 57

Current 61970 Network Profiles

4 Data with slow change rate4 Equipment IEC 61970-4524 Diagram layout IEC 61970-4534 Dynamics data IEC 61970-457

4 Data with medium change rate4 Topology and Switch statuses IEC 61970-456

4 Data with high change rate4 Steady state power flow input (hypothesis) IEC 61970-4564 Power flow solution state variables IEC 61970-456

4 ENTSO-E assembled the above in a single document

P 25

Page 26: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

26

TC 57

Current 61968 Profiles

4Meter reading and control IEC 61968-9

4Operations IEC 61968-34Currently with distribution focus

4 Distribution network extensions IEC 61968-114Will be integrated into IEC 61970-301

4 CDPSM IEC 61968-134Will be integrated in IEC 61970-452

P 26

Page 27: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

27

TC 57

Current 62325 Market Profiles

4 US profile supporting SCED/SCUC for day ahead andintraday markets4 IEC 62325-452

4 EU profile supporting market schedules exchange4 IEC 62325-451 based on ETSO specifications

P 27

Page 28: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

28

TC 57

61790 CIM 16 Documents to Review

4 EA UML

4WG13 and Common issues lists

4WG13-cim16-report-<date>.doc (will come)4Summary listing of all issues, grouped4List of major model changes and diagrams

4 Profile documents4RDFS files4ENTSO-E document currently available4 IEC specifications to come

4 IEC 61970-552

P 28

Page 29: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

29

TC 57

61970 CIM 16 Summary

4 Basic network model is stable4Past bigger network model changes CIM 14 -> CIM 15

• Common transformer model for transmission & distribution• Phase shifters

4 Extensive additions, e.g.4HVDC4SSH4Grounding models

4 Vendors will need time to catch up

Page 30: TC 57 CIM Model Manager Report - UCAIugcimug.ucaiug.org/Meetings/Ljubljana2013/Presentations/Day...2013/06/12  · sheets 4Summary documents describing the CIM versions 4Xmi files

30

TC 57

61970 CIM Future Work

4Many new requirements for extensions

4 CIM 17 candidates4CIM 16 road map items that missed the train, e.g.

• Linkage between schedules and physical model• SIPS• Smart Grid• Dynamic operational limits• Power system projects

4New issues from• ENTSO-E usage• Other users