    TECHENICAL BID EVALUATIONPROJECT NAME : YANBU EXPORT REFINERY PROJECT

    INQUIRY NO. : R-2154-101H REVISION : 0 DISC

    INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CU

    HEC

    DESCRIPTION UNIT WT(Total) WT(Total) RE

    (Ton) UNIT PRICE USD (Ton)

    1 TERMS & CONDITIONS

    1.1 Proposal No./ Date

    1.2 Delivery

    1.3 Delivery Condition / Sea Port

    2 COMMENT ON QUOTATION

    2.1 EQUIPMENT NO.

    117-D-0013 1 0.0 0.0 0.0 0.0

    119-D-0008 1 0.0 0.0 0.0 0.0

    119-D-0010 1 0.0 0.0 0.0 0.0

    119-D-0500 1 0.0 0.0 0.0 0.0

    140-D-0003 1 0.0 0.0 0.0 0.0

    140-D-0004 1 0.0 0.0 0.0 0.0

    142-D-0004 1 0.0 0.0 0.0 0.0

    142-D-0025 1 0.0 0.0 0.0 0.0

    Start-up Spare Parts(Gasket : 200%, Bolt/Nut : 10%, Min. 3sets) sets 0.0 0.0

    Others 0.0 0.0

    TOTAL 8 0.0 0.0 0.0

    USD/Ton #DIV/0!

    3 OPTION PRICES

    3.1 Electric & hydro water at field Required 0.0

    3.2 Foundation chipping and grouting work and material Required 0.0

    3.3 Touch Up Paint BQ (m2) = [Total Surface Area for Painting (m2)] x 10% USD Required 0.0

    3.4 Capital Spare Parts N/R N/A

    3.5 Operation Spare Parts for two (2) years Set Required 0.0

    (Gasket : 100%, Bolt/Nut : 10%, Min. 4sets) Vendor Rec.

    4 SCOPE OF WORK Inclusion Exclusion Quotation Final Remarks

    4.1 Mechanical Guarantee X Included

    4.2 Equipment Complete Design X

    4.3 Vent calculation in accordance with API 2000 X

    4.4 Equipment and Material Procurement X

    4.5 Material certification to be submitted X

    4.6 Fabrication(shop and field), site erection and installation work X

    4.7 Manufacturing and Assembly X

    4.8 Internal painting/coating as per coating data sheet X

    4.9Painting up to Finish Coat in accordance with Project Specification (Vendor shall Get

    X

    4.10 Rust Prevention for Storage X

    4.11 Detail design & drawing for platform and ladder(circular stairway) X

    4.12 All Sub-Vendor and Internal Vendor Coordination X

    4.13 PWHT for stress relieve as per Data Sheet, Code and Standard, if required X

    4.14 Impact test as per Code and Standard, if required X

    4.15 Stress analysis for External force & moment X

    4.16 Pre-Inspection Meeting X

    4.17 Shop/field inspection and test as per standards, design code & specification X

    4.18 PMI (Positive Material Identification) & Its Reports, if requested X

    4.19 Hydrostatic test and calibration at site X

    4.20 Chemical cleaning on the surface of stainless steel, if requested X

    4.21 Cleaning tank inside after hydrotest and before final inspection X

    4.22 Marking, Packing and Transportation X

    4.23 Documentation as per the Requirements of this Requisition X

    4.24 All documents and support for Government approval as required X

    4.25 Compliance with statutory requirements, Code and Standard X

    4.26Consideration of equipment design and shipping arrangements for ease of delivery to

    the job siteX

    4.27Local regulation approval work & all documents and certificates for government

    approvalX

    VENDOR NAME

  • 8/11/2019 TBE Master-Y3_R-2154-101H_R0 (Storage Tank)_20091022

    2/4

    TECHENICAL BID EVALUATIONPROJECT NAME : YANBU EXPORT REFINERY PROJECT

    INQUIRY NO. : R-2154-101H REVISION : 0 DIS

    INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D C

    HEC

    DESCRIPTION UNIT WT(Total) WT(Total) RE

    (Ton) UNIT PRICE USD (Ton)

    VENDOR NAME

    4.30 Others specified in this Requisition X

    4.31 Other Accessories Required for Safe Operation (Not Referred in this Requisition) X

    5 SCOPE OF SUPPLY Inclusion Exclusion Quotation Final Remarks

    5.1 Equipment proper X Included

    5.2 Equipment with nozzles, flanges and its supports X

    5.3 All internals unless otherwise noted on equipment data sheet X

    5.4 Attachments for internals X

    5.5 Internal pipe such as dip pipe, feed pipe, etc. and its supports X

    5.6 Other parts welded on tank (wear plate, deflector, vortex breaker, etc) X

    5.7 Blind flanges, bolts, nuts & gaskets for manhole, vent and drain nozzles X

    5.8 Grounding lugs per drawing PIP X

    5.9 Sump as per data sheet X

    5.10 Oil skimmer X

    5.11 Bird screen for open vent, if required X

    5.12 Lifting lugs for installation and maintenance, if required X

    5.13 Earth lugs X

    5.14 Settlement check piece X

    5.15 Name plate (Stainless Steel) with bracket X

    5.16 Hot dip galvanized anchor bolt/nuts/washers X

    5.17 Landing Platform(50% Roof Area) and circular stairway (hot dip galvanized grating) X

    5.18 Internal flange in including bolt/nut & Gasket (Non-Asbestos sheet) X

    5.19 All parts shown on applicable data sheets, standards and drawings X

    5.20 Hand grip and internal ladder, if required X

    5.21 Support clip for ladder, platforms X

    5.22 Support clip for Pipe support, if required X5.23 Temporary support and skid for erection X

    5.24 Special tools for erection & maintenance, if required X

    5.25 Touch-up paint for field repair works X

    5.26 Internal and external accessories for 117-D-0013

    - Gauge hatch for nozzle "G" X

    - Emergency vent cover for nozzle "M2" X

    - Pressure/vacuum vent for nozzle "J" X

    - Air sparger for nozzle "F" X

    - Internal pipe for nozzle "A" X

    - Caustic distributor for nozzle "B" X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - Internal lining and external painting (including underside of bottom plate) X5.27 Internal and external accessories for 119-D-0008

    - Gauge hatch for nozzle "EM" (non-spark, self closing gauge hatch cover and

    slotted gauge well)X

    - Emergency vent cover for nozzle "CM" X

    - Pressure/vacuum vent with flame arrester for nozzle "BV" X

    - Draw-off sump (API 650 type) for nozzle "AW" X

    - Stilling well for nozzle "CL", "GL" X

    - Inlet distributor for nozzle "AI" X

    - Skimmer sump with flexible hose for nozzle "BW" X

    - Internal floating roof (metallic pontoon type) X

    - Mechanical seals X

    - Foam system X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - Internal lining and external painting (including underside of bottom plate) X

    - Insulation support ring X

    5.28 Internal and external accessories for 119-D-0010

    - Gauge hatch for nozzle "BM" (non-spark, self closing gauge hatch cover and slotted

    gauge well)X

    - Emergency vent cover for nozzle "AM" X

    - Pressure/vacuum vent with flame arrester for nozzle "BV" X

    - Draw-off sump (API 650 type) for nozzle "CW" X

  • 8/11/2019 TBE Master-Y3_R-2154-101H_R0 (Storage Tank)_20091022

    3/4

    TECHENICAL BID EVALUATIONPROJECT NAME : YANBU EXPORT REFINERY PROJECT

    INQUIRY NO. : R-2154-101H REVISION : 0 DIS

    INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D C

    HEC

    DESCRIPTION UNIT WT(Total) WT(Total) RE

    (Ton) UNIT PRICE USD (Ton)

    VENDOR NAME

    - Skimmer sump with flexible hose for nozzle "AW" X

    - Internal floating roof (metallic pontoon type) X

    - Mechanical seals X

    - Foam system X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - Internal lining and external painting (including underside of bottom plate) X

    - Insulation support ring X

    5.29 Internal and external accessories for 119-D-0500

    - Gauge hatch for nozzle "EM" (non-spark, self closing gauge hatch cover and slotted

    gauge well)X

    - Emergency vent cover for nozzle "AM" X

    - Pressure/vacuum vent with flame arrester for nozzle "BV" X

    - Jet mixer for nozzle "BI" X

    - Stilling well for nozzle "BL" X

    - Inlet distributor for nozzle "AI" X

    - Skimmer sump with flexible hose for nozzle "AW" X

    - Internal floating roof (metallic pontoon type) X

    - Mechanical seals X

    - Foam system X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail X

    - Internal lining and external painting (including underside of bottom plate) X

    - Insulation support ring X

    5.30 Internal and external accessories for 140-D-0003

    - Gauge hatch for nozzle "M" (non-spark, self closing gauge hatch cover with lock) X- Emergency vent cover for nozzle "C2" X

    - Pressure/vacuum vent for nozzle "D" X

    - Inlet distributor for nozzle "AI" X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - Internal lining and external painting (including underside of bottom plate) X

    - Insulation support ring X

    5.31 Internal and external accessories for 140-D-0004

    - Gauge hatch for nozzle "H" (non-spark, self closing gauge hatch cover with lock) X

    - Emergency vent cover for nozzle "MH-2" X

    - Pressure/vacuum vent for nozzle "D" X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X- External painting (including underside of bottom plate) X

    5.32 Internal and external accessories for 142-D-0004

    - Gauge hatch for nozzle "G" (non-spark, self closing gauge hatch cover with lock) X

    - Emergency vent cover for nozzle "M2" X

    - Pressure/vacuum vent for nozzle "R" X

    - Draw-off sump (API 650 type) for nozzle "D" X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - Internal lining and external painting (including underside of bottom plate) X

    5.31 Internal and external accessories for 142-D-0025

    - Gauge hatch for nozzle "G" (non-spark, self closing gauge hatch cover) X

    - Emergency vent cover for nozzle "M2" X

    - Pressure/vacuum vent for nozzle "V" X

    - Draw-off sump (API 650 type) for nozzle "D" X

    - Landing platform and Circular stairway (grating type) X

    - Roof handrail (All Around) X

    - External painting (including underside of bottom plate) X

    6 HIGHLIGHT IN PROPOSAL

    6.1 Activities to be confirmed before selecting the vendor

    - Shop drawing for Platform & Ladder Required

    - Painting including finish coat Required

  • 8/11/2019 TBE Master-Y3_R-2154-101H_R0 (Storage Tank)_20091022

    4/4

    TECHENICAL BID EVALUATIONPROJECT NAME : YANBU EXPORT REFINERY PROJECT

    INQUIRY NO. : R-2154-101H REVISION : 0 DISCIPLINE : MS

    INQUIRY NAME : STORAGE TANKS DATE : 20-Oct-09 ST'D CURRENCY : USD

    HEC

    DESCRIPTION UNIT WT(Total) WT(Total) REMARKS

    (Ton) UNIT PRICE USD (Ton)

    VENDOR NAME

    6.2 Vendors Deviations/Clarifications

    - Deviation and/or Alternative Yes or No

    6.3 Special Note (if any)

    7 Result of Technical Evaluation (Techenically Acceptable)

    4 of 4