26th July 2018
Tarring High Street – Flood mitigation with SuDS Tarring Flood Action Group
![Page 2: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/2.jpg)
Overview of the problem
![Page 3: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/3.jpg)
Overview of the problem
![Page 4: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/4.jpg)
Economic impacts of flooding in the UK
• Association of British Insurers (ABI) estimated £1.3 billion cost for 2016• Summer 2007 flooding cost UK insurers £3.2 billion•DEFRA’s 2012 UK Climate Change Risk Assessment estimates average annual cost between £1.6 and £6.8 billion by 2050.
Source: LSE
![Page 5: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/5.jpg)
Tarring site
![Page 6: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/6.jpg)
Study area
• 1 - Rectory Road near Fairoak Triangle• 2 - High Street, including Vine PH Car Park• 3 - Glebe Road• 4 - South Street to St Lawrence Avenue• 5 – Church Road outside St Andrew’s
© Google Maps
![Page 7: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/7.jpg)
Site levels
© OS and EA
![Page 8: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/8.jpg)
Site risk• Environment Agency mapping shows several areas at HIGH RISK
• Entire study area at risk of flooding to some degree
© OS and EA
![Page 9: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/9.jpg)
Site risk1 - Rectory Road
© OS and EA
Flooding in Rectory Road carriageway only. Properties not seemingly at risk.
Risk to High Street when water volumes on Rectory Road overspill
East side of High Street is lower, so water will flow there
![Page 10: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/10.jpg)
Site risk2/3 – High St/ Glebe Rd
© OS and EA
Water flows down High St.Junction levels act as a dam to hold back water.
Gulleys become overburdened. Water builds up and junction floods.
Wash from cars floods properties, especially eastern side.
![Page 11: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/11.jpg)
Site risk4 – South St
© OS and EA
Slight slope southwards means properties close to Tarring Park are more at risk.
Slight fall to western side.
Low kerbs allow water to overflow onto footway easily
![Page 12: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/12.jpg)
Site risk5 – Church Rd
© OS and EA
Ponding occurs at entrances to lychgate side road, particularly around eastern arm
![Page 13: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/13.jpg)
SuDs measures
There are many SUDS options available across the spectrum, but only appropriate ones have been considered, as follows:
•Downpipe disconnection and control at source
•Rain gardens, both in private gardens and in the Public Highway on verges and in the carriageway
•Tree pits with retention volume
•Permeable paving, with suitable visual quality for use in Conservation Area
Cost, efficacy at retaining water volumes and complexity to build are all rated out of 5
![Page 14: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/14.jpg)
Disconnect downpipes
To planter
Cost level: 1/5Volume retained: 1/5Complexity: 1/5
![Page 15: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/15.jpg)
Disconnect downpipes
![Page 16: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/16.jpg)
Rain gardens
Cost level: 2.5/5Volume retained: 3/5Complexity: 3/5
![Page 17: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/17.jpg)
Retention basins
Cost level: 2/5Volume retained: 5/5Complexity: 3/5
![Page 18: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/18.jpg)
SuDS tree pits
Cost level: 3/5Volume retained: 2/5Complexity: 3/5
![Page 19: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/19.jpg)
Permeable paving
© Paving Expert
Cost level: 5/5Volume retained: 4/5Complexity: 5/5
![Page 20: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/20.jpg)
Outline proposals
•These are outline proposals for discussion
•We have been through a process of elimination already and discounted several ideas
•As yet, proposals are not costed
•Works to public and private land entirely at the discretion of the land owner
![Page 21: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/21.jpg)
Proposals1 - Rectory Road
Network of rain gardens / tree pits; up to 5-6 components, including a narrowing of the carriageway
Resurfacing/ installing new gulley at low point
Permeable paving (and potential kerbside rain gardens) to eastern side of High St
Generally: divert downpipes into retention planters, water butts or private rain gardens.
![Page 22: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/22.jpg)
Proposals 2 – Top of High St
Rain gardens and permeable paving to east side.
Gateway rain garden feature at One Way sign.
Generally: divert downpipes into retention planters, water butts or private rain gardens.
NB The Vine PH car park is not viable for retention because it is higher than the street level and we cannot get water to flow into it
![Page 23: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/23.jpg)
Proposals 3 – High St/ Glebe Rd junction
Remodel junction to allow for rain garden permeable paving built into carriageway.
Demolish wall and build ground level rain gardens at existing raised planter outside pub
Permeable paving and geocellular storage / gravel Rain garden with tree pit on southern side by Dukes Coffee Shop
Permeable paving in parking bay outside Tarring Village Store
Generally: divert downpipes into retention planters, water butts or private rain gardens.
Property-level flood protection
![Page 24: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/24.jpg)
Proposals 4 –Glebe Rd
Remodel carriageway channels so that water can reach gullies at low points. NB, Southern side works are all subject to proposals for new footway.
Permeable paving at low point in Parish Hall car park
Generally: divert downpipes into retention planters, water butts or private rain gardens.
![Page 25: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/25.jpg)
Proposals 5 – South Street
Permeable paving and potential footway widening along entire western side, and parking area to east before roundabout
Rain gardens at buildouts at roundabout
Swale and shallow retention basin in Tarring Park
Generally: divert downpipes into retention planters, water butts or private rain gardens.
Property-level flood protection
![Page 26: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/26.jpg)
Proposals 6 – Church Rd
Resurfacing/ installing new gullies or inlet at low points
Rain garden/ detention basin in green area
Dropping kerbs on island at slip road to let water on to grass
Permeable paving to entry points
![Page 27: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/27.jpg)
Next steps
• Feedback from TFAG, WSCC and WBC needed to guide design
• Technical assessment of hydraulic performance of network and SuDS measures
• Check proposed locations against underground utilities, both on paper and by digging trial holes
• Draw up designs and provide cost estimation
• Final report issued late August
• Summary presentation to TFAG 11th September
![Page 28: Tarring High Street Flood mitigation with SuDSworthingnhw.ourwatch.org.uk/images/site_images/38890_Project_Ce… · garden permeable paving built into carriageway. Demolish wall and](https://reader030.vdocuments.mx/reader030/viewer/2022041000/5ea04c190a95a640ff54193d/html5/thumbnails/28.jpg)
Thank you!
Q & A session