tarm biomass pressure tank installation manual

9
Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17 Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 1 Tarm Biomass Pressure Tank Dual, and Triple Tank Installation Manual Table of Contents: Piping Connections…………………………………………….………………….2 Parts…………………..………………………………………….………………...5 Tank Submittal Sheets.………………………………………………….…………7

Upload: others

Post on 21-Oct-2021

9 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 1

Tarm Biomass Pressure Tank

Dual, and Triple Tank

Installation Manual

Table of Contents:

Piping Connections…………………………………………….………………….2

Parts…………………..………………………………………….………………...5

Tank Submittal Sheets.………………………………………………….…………7

Page 2: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 2

Piping Connections

Completed Top Connections (Option 1) Completed Left Top Connections

Completed Right Top Connections Install Temperature Gauge in Upper Tappings

Completed Top Connections (Option 2) Completed Left Top Connections

Page 3: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 3

Completed Right Top Connections Completed Bottom Connections

Completed Bottom Left Connections Completed Bottom Right Connections

Triple Tank Installation

Completed Top Connections (Option 1)

Page 4: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 4

Completed Left Top Connections Completed Center Top Connections

Completed Right Top Connections

Completed Top Connections (Option 2)

Completed Left Connections Completed Middle Connections Completed Right Connections

Page 5: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 5

Qty Description Part Number

4 1½” Ball Valve BV112

4 1½” x 8” Black Iron Nipple BN112X8

8 1½” x 3” Black iron Nipple BN112X3

2 1½” x Close Black Iron Nipple BN112XCL

4 1½” x ¾” x 1½” Black Iron Tee BT112X34X112

2 1½” Black iron Union BU112

3 Temperature Gauge TEMPGAUGE

2 Auto Air Vent AAV

1 ¾” Boiler Drain BD34

2 ½” Black Iron Plug BP12

3 ¾” x ½” Black Iron Bushing BB34X12

2 ¾” x ⅛” Black Iron Bushing BB34X18

2 1½” x 1¼” Black Iron Tee BT112X114

2 2” Black Iron Plug BP2

2 1½” x 2” Black Iron Bushing BB112X2

2 1½” x ¾” Black Iron Bushing BB112X34

2 1½” Black Iron Plug BP112

Double Tank Parts (KBHST440Pipe Kit):

Qty Description Part Number

6 1½” Ball Valve BV112

2 1½” x 8” Black Iron Nipple BN112X8

8 1½” x 3” Black Iron Nipple BN112X3

14 1½” x Close Black Iron Nipple BN112XCL

6 1½” x ¾” x 1½” Black Iron Tee BT112X34X112

2 1½” Black Iron Tee BT112

5 Temperature Gauge TEMPGAUGE

3 Auto Air Vent AAV

1 ¾” Boiler Drain BD34

3 ½” Black Iron Plug BP12

5 ¾” x ½” Black Iron Bushing BB34X12

3 ¾” x ⅛” Black Iron Bushing BB34X18

2 1½” x 1¼” Black Iron Tee BT112X114

4 1½” x 24” Black Iron Nipple BN112X24

4 1½” x 90º Elbow BF11290

4 1½” Black Iron Union BU112

3 1½” x 2” Black iron Bushing BB112X2

3 2” Black Iron Plug BP2

3 1½” x ¾” Black Iron Bushing BB112X34

3 1½” Black iron Plug BP112

Triple Tank Parts (KBHST660Pipe Kit):

Completed Bottom Connections

Completed Left Connections Completed Middle Connections Completed Right Connections

Parts

Page 6: Tarm Biomass Pressure Tank Installation Manual

Pressure Tank Installation Sheet 1-800-782-9927 Version 10-17

Tarm Biomass · 4 Britton Lane · Lyme, NH 03768 6

Qty Description Part Number

4 1½” Ball Valve BV112

4 1½” x 8” Black Iron Nipple BN112X8

4 1½” x 3” Black iron Nipple BN112X3

4 1½” x Close Black Iron Nipple BN112XCL

4 1½” x ¾” x 1½” Black Iron Tee BT112X34X112

2 1½” Black iron Union BU112

3 Temperature Gauge TEMPGAUGE

2 Auto Air Vent AAV

1 ¾” Boiler Drain BD34

2 ½” Black Iron Plug BP12

3 ¾” x ½” Black Iron Bushing BB34X12

2 1½” x 1½” x 1¼” Black Iron Tee BT112X114

2 1½” x 12” Black Iron Nipple BN112X12

2 ¾” x ⅛” Black Iron Bushing BB34X18

2 2” Black Plug BP2

4 1½” Black Iron Plug BP112

2 ¾” x 1½” Black Iron Bushing BB34X112

2 1½” x 2” Black Iron Bushing BB112X2

Double Tank Parts (KBHST600Pipe Kit):

Qty Description Part Number

4 1½” Ball Valve BV112

4 1½” x 8” Black Iron Nipple BN112X8

4 1½” x 3” Black Iron Nipple BN112X3

4 1½” x Close Black Iron Nipple BN112XCL

4 1½” x ¾” x 1½” Black Iron Tee BT112X34X112

3 Temperature Gauge TEMPGAUGE

2 Auto Air Vent AAV

1 ¾” Boiler Drain BD34

2 ½” Black Iron Plug BP12

3 ¾” x ½” Black Iron Bushing BB34X12

2 1½” x 1¼” Black Iron Tee BT112X114

2 1½” x 12” Black Iron Nipple BN112X12

2 ¾” x ⅛” Black Iron Bushing BB34X18

2 1½’ Black Iron Union BU112

6 2” Black Iron Plug BP2

2 ¾” x 2” Black Iron Bushing BB34X2

4 1½” x 2” Black Iron Bushing BB112X2

Double Tank Parts (KBHST800Pipe Kit):

Page 7: Tarm Biomass Pressure Tank Installation Manual

30"

2 12 "

56"

17"

17"

17"

4"

14"TYP

NOTES:1. MAWP (INTERNAL DESIGN PRESS.): 125 PSIG AT 500°F MAWP (EXTERNAL PRESS.): -- MDMT: -20°F AT 125 PSIG TEST PRESSURE: 163 PSIG HYDRO EXTERNAL FINISH: PRIME (SPEC QA-01-005) INTERNAL FINISH: PLAIN SHELL: SA-414G HEAD: SA-414G2. TOLERANCE TO BE PER JW DWG #STD SP-103 UNLESS OTHERWISE NOTED.3. VESSEL TO BE FABRICATED & STAMPED PER ASME SECT VIII, DIV 1, LATEST EDITION4. EST WT: 345 LBS EMPTY; CAP: 220 GAL NOM.

BB

BB

REFLIFTINGBAR

45°

SEAM

TOP VIEW

AA

B B BB

AA

19 34 "

30° TYP

BOTTOM VIEW

3D VIEWREF, SUPPORT LEG,TYP 3 PLCS, WITH

1116" HOLE ON A

1934" RE

F1

7 8"

CLR

60"SHELL

8 38 " REF

76 34 "

O/HAPPROX

8 38 " REF

40"

A

A

C

C

B

B

A

A

NAME PLT

(INSP)(INSP)

(INSP)

ID SIZE RATING CONN. TYPE SERVICE

A 12 " 350# BOSS, NPT CUSTOMER CONN.

B 1 12" 350# BOSS, NPT CUSTOMER CONN.

C 2" 350# BOSS, NPT CUSTOMER CONN.D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

THE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OF<INSERT COMPANY NAME HERE>. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OF<INSERT COMPANY NAME HERE> IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

NEXT ASSY USED ON

APPLICATION

DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONALANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL

INTERPRET GEOMETRICTOLERANCING PER:

MATERIAL

FINISH

DRAWN

CHECKED

ENG APPR.

MFG APPR.

Q.A.

COMMENTS:

DATENAME

SIZE

BDWG. NO. REV

WEIGHT: SCALE: 1:12

UNLESS OTHERWISE SPECIFIED:

SHEET 1 OF 1DO NOT SCALE DRAWING

TARR-22-006

THE JOHN WOOD COMPANYS.R.TITLE:

5/15/18

30" DIA ASME VERTICALPRIMED STORAGE TANK

B

Page 8: Tarm Biomass Pressure Tank Installation Manual

50"SHELL

36"

1 34 " CLR

10 34 "

REF

71 12 "

O/HAPPROX

REF 1 58 " SF

2 12 "

4"

14"

14"

14"

46"

14"TYP

NOTES:1. MAWP (INTERNAL DESIGN PRESS.): 125 PSIG AT 500°F MAWP (EXTERNAL PRESS.): -- MDMT: -20°F AT 125 PSIG TEST PRESSURE: 163 PSIG HYDRO EXTERNAL FINISH: PRIME (SPEC QA-01-005) INTERNAL FINISH: PLAIN 2. TOLERANCE TO BE PER JW DWG #STD SP-103 UNLESS OTHERWISE NOTED.3. VESSEL TO BE FABRICATED & STAMPED PER ASME SECT VIII, DIV 1, LATEST EDITION4. EST WT: 465 LBS EMPTY, CAP: 300 GAL NOM

B

B

B

REF,LIFTINGBAR

45°

R10"

270° 90°

180°

SEAM

TOP VIEW

AA

BB B B

C

AA

B

30°TYP

180°

90°

270°

BOTTOM VIEW

3D VIEW

REF, SUPPORT LEG,TYP 3 PLCS, WITH

1116" HOLE ON A

2234" BC

(INSP)1 3

4 "TYPCLR

35" A

A

C

C

A

ANAME PLT

(INSP)

ID SIZE RATING CONN. TYPE SERVICE

A 12 " 350# BOSS, NPT CUSTOMER CONN.

B 112 " 350# BOSS, NPT CUSTOMER CONN.

C 2" 350# BOSS, NPT CUSTOMER CONN.D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

THE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OF<INSERT COMPANY NAME HERE>. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OF<INSERT COMPANY NAME HERE> IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONALANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL

INTERPRET GEOMETRICTOLERANCING PER:

MATERIAL

FINISH

DRAWN

CHECKED

ENG APPR.

MFG APPR.

Q.A.

COMMENTS:

DATENAME

SIZE

BDWG. NO. REV

WEIGHT: SCALE: 1:12

UNLESS OTHERWISE SPECIFIED:

SHEET 1 OF 2DO NOT SCALE DRAWING

TARR-24-009

THE JOHN WOOD COMPANYS.R.TITLE:

5/15/18

36" DIA ASME VERTICALPRIMED STORAGE TANK

C

Page 9: Tarm Biomass Pressure Tank Installation Manual

72"SHELL

36"

1 34 " CLR

10 34 "

REF

93 12 "

O/HAPPROX

REF 1 58 " SF

2 12 "

4"

21"

21"

21"

68"

14"TYP

NOTES:1. MAWP (INTERNAL DESIGN PRESS.): 125 PSIG AT 500°F MAWP (EXTERNAL PRESS.): -- MDMT: -20°F AT 125 PSIG TEST PRESSURE: 163 PSIG HYDRO EXTERNAL FINISH: PRIME (SPEC QA-01-005) INTERNAL FINISH: PLAIN 2. TOLERANCE TO BE PER JW DWG #STD SP-103 UNLESS OTHERWISE NOTED.3. VESSEL TO BE FABRICATED & STAMPED PER ASME SECT VIII, DIV 1, LATEST EDITION4. EST WT: 600 LBS EMPTY, CAP: 400 GAL NOM

B

B

B

REFLIFTINGBAR

45°

R10"

270° 90°

180°

SEAM

TOP VIEW

AA

BB B B

B

AA

30°TYP

180°

90°

270°

BOTTOM VIEW

3D VIEW

REF, SUPPORT LEG,TYP 3 PLCS, WITH

1116" HOLE ON A

2234" BC

(INSP)1 3

4 "TYPCLR

50"

A

A

B

B

A

A

NAME PLT

(INSP)

B

ID SIZE RATING CONN. TYPE SERVICE

A 12 " 350# BOSS, NPT CUSTOMER CONN.

B 2" 350# BOSS, NPT CUSTOMER CONN.

D

C

B

AA

B

C

D

12345678

8 7 6 5 4 3 2 1

THE INFORMATION CONTAINED IN THISDRAWING IS THE SOLE PROPERTY OF<INSERT COMPANY NAME HERE>. ANY REPRODUCTION IN PART OR AS A WHOLEWITHOUT THE WRITTEN PERMISSION OF<INSERT COMPANY NAME HERE> IS PROHIBITED.

PROPRIETARY AND CONFIDENTIAL

DIMENSIONS ARE IN INCHESTOLERANCES:FRACTIONALANGULAR: MACH BEND TWO PLACE DECIMAL THREE PLACE DECIMAL

INTERPRET GEOMETRICTOLERANCING PER:

MATERIAL

FINISH

DRAWN

CHECKED

ENG APPR.

MFG APPR.

Q.A.

COMMENTS:

DATENAME

SIZE

BDWG. NO. REV

WEIGHT: SCALE: 1:12

UNLESS OTHERWISE SPECIFIED:

SHEET 1 OF 2DO NOT SCALE DRAWING

TARR-24-011

THE JOHN WOOD COMPANYS.R.TITLE:

5/15/18

36" DIA ASME VERTICALPRIMED STORAGE TANK

C