Government of Bangladesh 20 September 2011, Dhaka ROAD MAP FOR ROAD MAP FOR 500 MW SOLAR POWER DEVELOPMENT 500 MW SOLAR POWER DEVELOPMENT PROGRAMME PROGRAMME Power Division Ministry of Power, Energy and Mineral Resources Tapos Kumar Roy Additional Secretary

Upload: adbsaenprojects

Post on 22-Feb-2015

87 views

Category:

Documents


2 download

DESCRIPTION

Roadmap for Implementation of 500 MW Solar Power Development Program

TRANSCRIPT

Page 1: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

Government of Bangladesh

20 September 2011, Dhaka

ROAD MAP FORROAD MAP FOR

500 MW SOLAR POWER DEVELOPMENT 500 MW SOLAR POWER DEVELOPMENT PROGRAMME PROGRAMME

Power DivisionMinistry of Power, Energy and Mineral Resources

Tapos Kumar RoyAdditional Secretary

Page 2: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

2

RENEWABLE ENERGY POLICYRENEWABLE ENERGY POLICY

Policy envisions: - 5% of total power from renewable sources by 2015- 10% of total power from renewable sources by 2020

Policy demands (as of June 2011 Program):- 800 MW power from renewable by 2015- 2000 MW power from renewable by 2020

A dedicated agency proposed: Sustainable Energy Development Authority (SEDA)

Policy effective in 2009

Page 3: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

3

Existing Incentives from Government- Electricity generated from Renewable Energy Projects (less than 5 MW)

may be purchased by Power Utility or any Consumer through mutual agreement

- Renewable Energy Project Investors will be exempted from corporate income tax for a period of 10 years.

- Renewable Energy Equipment and raw materials will be exempted from charging 15% VAT

- An incentive tariff may be considered for electricity generated from renewable energy sources which may be 10% higher than the highest price of electricity purchased by the utility from private generators.

Page 4: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

Full/ Partial Duty exemption:- Solar Panel- Solar Panel manufacturing equipment- LED Light- Solar Operated Light- Wind Power Plant

Promotional Funds for Renewable Energy Projects through:- Bangladesh Bank- IDCOL- Commercial Banks

Existing Incentives from Government…contd.

Page 5: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

500 MW SOLAR POWER 500 MW SOLAR POWER DEVELOPMENT PROGRAMME DEVELOPMENT PROGRAMME

5

Page 6: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

6

500 MW SOLAR POWER DEVELOPMENT PROGRAM500 MW SOLAR POWER DEVELOPMENT PROGRAM--AT A GLANCEAT A GLANCE

An initiative of Power DivisionLargest ever Solar Power Development Initiative in Bangladesh Adopted in accordance with vision in RE PolicyCollaboration with a number of government ministries and their agenciesStrong involvement of private sector in implementationCompletion by 2015Planning to incorporate CDM componentsThe Initial Idea had been presented at ADB’s 3rd Asian Solar Energy Forum in Bangkok, 1-3 June 2011

Page 7: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

ACHIEVEMENT ON RENEWABLE ENERGY DEVELOPMENTACHIEVEMENT ON RENEWABLE ENERGY DEVELOPMENT……....(JUNE 11)(JUNE 11)

7

Category Achievement

Solar Home System (SHS) 47 MW(1 Million Units)

Other Solar PV Applications(e.g. Markets, Office Buildings etc.)

1 MW

Roof-top Solar PV Systems of New Electricity Consumers

3 MW

Wind Energy 2 MW

Biomass based electricity 1 MW

Biogas based electricity 1 MW

Total 55 MW

92% contribution is from solar PV Technology

Page 8: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

LIST OF SOLAR POWER PROJECTS UNDER PIPELINE LIST OF SOLAR POWER PROJECTS UNDER PIPELINE

8

Type of Project Capacity Impl. Location Major Source of Funding

Solar Thermal Power Plant 20 MW Private Sector

Bhaluka, Mymensingh

Private Sector (IPP basis)

Grid Connected Solar PV Power Plant

400 kW BPDB Sullah, Sunamganj Climate Change Trust Fund

1 MW BPDB Rajshahi City Private Sector (IPP basis)

3 MW BPDB Rajabarihat, Rajshahi Private Sector (IPP basis)

3 MW BPDB Sarishabari, Jamalpur Private Sector (IPP basis)

5 MW BPDB Kaptai, Rangamati Asian Development Bank

Solar PV System 28 kW REB REB H/Q GoB

Solar LED Street Light System.

225kW PDB& c.corp.

6 City Corporations Asian Development Bank

Solar Powered Irrigation Pump (each 14 kWp )

280 kW REB 8 PBSs Climate Change Trust Fund

Solar Powered Irrigation Pump (each 8 kWp ) & SHS

222 kW REB 7 PBSs KOICA

Solar-Wind Hybrid Power Plant

1 MW BPDB Hatia Island Asian Development Bank

TOTAL (Est.) 35 MW

Page 9: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

9

Category Status

Commercial Solar Power Projects

340 MW

Social Solar Power Projects 160 MW

Total 500 MW

TARGET FORTARGET FOR

500 MW SOLAR POWER DEVELOPMENT PROGRAMME500 MW SOLAR POWER DEVELOPMENT PROGRAMME

Page 10: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

TWO BROAD CATEGORIES PROGRAMME TWO BROAD CATEGORIES PROGRAMME

10

-- COMMERCIAL TYPE COMMERCIAL TYPE -- SOCIAL SERVICE TYPESOCIAL SERVICE TYPE

Page 11: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

11

Program Capacity (MW)

1 Solar Irrigation Pumps 150

2 Solar Power Mini Grid System 25

3 a) Solar Park at govt. land 115

b) Solar Park at Railway Area 20

4 Solar Power in Private Commercial and Residential Buildings

10

5 Solar Power in Industries 20

Total 340

A. COMMERCIAL PROJECTSA. COMMERCIAL PROJECTS

Page 12: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

12

1. REPLACEMENT OF DIESEL IRRIGATION PUMPS WITH 1. REPLACEMENT OF DIESEL IRRIGATION PUMPS WITH SOLAR POWER SOLAR POWER

- 1.34 Million Diesel operated Irrigation Pumps in the country

- 18,700 of them will be replaced with Solar

- The Replacement Pumps include Shallow Tube Wells (STWs) & Low Lift

Pumps (LLPs)

- Average capacity of each solar pump is 8 kWp with Head of 12-15 Meter

- Area coverage on average 8 Hectares of Paddy Fields per Pump

- Total Solar Power Capacity Addition: 150 MW

- A Monitoring Committee will supervise the programme

Page 13: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

13

ADB & other DPs

IDCOL

Partner Org. (PO)[Equity Participation]

Farmers Group

Gran

t

Low

Inte

rest

Cred

it

Gran

t &

Cred

it Su

ppor

t

Tech

.As

sist.

Impl

.

O&M

Solar Irr. Pump

Wat

er Wat

er T

ariff

Loan

Re

pay.

Loan

Re

pay.

IMPLEMENTATION MODELIMPLEMENTATION MODEL

Page 14: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

14

2. MINI GRID SOLAR POWER SYSTEM AT REMOTE 2. MINI GRID SOLAR POWER SYSTEM AT REMOTE VILLAGES UNDER RAPSS MODELVILLAGES UNDER RAPSS MODEL

- Guideline for Remote Area Power Supply System (RAPSS) was undertaken in 2007- 30 remote Upazillas have been identified under RAPSS where gridexpansion is not planned for next 10-15 years

- New area identification under process

- Private RAPSS Operator as Area Franchise will be hired through Competitive Bidding - Necessary Grant and credit support will be extended through IDCOL.- REB will supervise the project as well as, will provide tariff subsidy to the RAPSS Operator.

- Total Solar Power Capacity Addition: 25 MW

Page 15: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

15

Power CellTe

chni

cal

Assis

t.

Selec

ts o

pera

tor

Thro

ugh

bidd

ing

Implementation ModelImplementation Model

ADB & other DPs

IDCOL(As financing inst.)

RAPSS Operator[Equity Participation]

Gran

t

Low

Inte

rest

Cred

it

Gran

t &

Cred

it Su

ppor

t

Gen.

Di

st.

& O&M

Solar Mini Grid Lo

an

Repa

y.Lo

an

Repa

y.

RAPSS Fund(under Power Division/Power cell’s control)

Gran

t

Low

Inte

rest

Cred

it

Loan

Re

pay.

REB

Tarif

f co

llect

ion

Tarif

f Su

bsid

y

Moni

torin

g

Page 16: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

16

3. SOLAR PARK AT GOVT. LAND 3. SOLAR PARK AT GOVT. LAND Solar Park as Demonstration Projects in non-agricultural landsThe power generated will be fed into the Grid on commercial basisTotal Solar Power Capacity Addition: 115 MW

Primarily 4 potential sites have been identified , may have other location to be identified: Sl. No. Location Land available Est. Gen.

Capacity

1. Rajabarihat, Rajshahi 52 Acres 15-20 MW2. PGCB Grid Sub-station

Compound, Ishwardi, Pabna18 Acres 5-6 MW

3. Rajshahi (Char area at the river Padma)

500 Acres 150-160 MW

4. Adjacent area near Bangabandhu Bridge

150 Acres 30-40 MW

Total 200-226 MW

Page 17: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

17

BPDBTe

chni

cal

Assis

t.

Selec

ts

IMPLEMENTATION MODELIMPLEMENTATION MODEL

ADB & other DPs

Solar Park IPP [Equity Participation]

PRG

PCG

BPDB

Guar

ante

eFe

e

Tarif

f

15 Y

rsPP

A

Page 18: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

18

4. SOLAR PARK AT RAILWAY AREAs4. SOLAR PARK AT RAILWAY AREAs

- Bangladesh Railway has many unutilized lands- Solar PV Park may installed at those areas- Project may be implemented on IPP basis- Generated Power may be fed into the grid on commercial basis- BPDB will buy the power from the IPP

- IPP Developer would have land lease agreement with Railway

- Total Solar Power Capacity Addition: 20MW

Page 19: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

19

List of Potential Railway Sites for Solar Park

Sl. No. Location Land available Est. Gen. Capacity

1. Azampur Railway Station, Dhaka

52 Acres 12-15 MW

2. Halishahar RTA, Chittagong 42 Acres 8-10 MW

3. Pahartoli Railway Station, Chittagong

25 Acres 5-7 MW

4. Kumira Railway Station, Chittagong

30 Acres 6-8 MW

Total 31 – 40 MW

Primarily 4 potential sites have been identified:

Page 20: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

20

BPDBTe

chni

cal

Assis

t.Se

lects

Implementation Model

ADB & other DPs

Solar Park IPP [Equity Participation]

Low

Inte

rest

Cre

dit

BPDB Lo

an R

epay

men

tTa

riff

15 Y

rsPP

A

RAILWAY

Land

Lea

se

Fee

15 Y

rsLL

A

Page 21: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

21

- Government has a directive to install solar panel to meet certain percentage of load demand as a pre-condition to get new electricity connection- Solar Power System will reduce load demand on Grid Electricity- Nearly 3 MWp Solar Panel already installed through out the country under the Directive

- Project aims to extend Credit facility to the Consumers as an incentive- Commercialization of the Program is under study- Est. Solar Power Capacity Addition: 10 MW

5. INSTALLATION OF ROOF TOP SOLAR SOLUTIONS 5. INSTALLATION OF ROOF TOP SOLAR SOLUTIONS ON COMMERCIAL AND RESIDENTIAL BUILDINGSON COMMERCIAL AND RESIDENTIAL BUILDINGS

Page 22: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

22

6. INSTALLATION OF ROOF TOP SOLAR SOLUTIONS 6. INSTALLATION OF ROOF TOP SOLAR SOLUTIONS IN INDUSTRIESIN INDUSTRIES

- Government is encouraging Industries to install solar panel to meet certain percentage of their load demand- Solar Panel will be installed at the unutilized roof-top of industries- Solar Power System will reduce load demand on Grid Electricity- Total no. of Industries targeted: 400- Average capacity of each system is 50 kWp- Est. Solar Power Capacity Addition: 20 MW

Page 23: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

23

ADB & other DPs

IDCOL/ Bangladesh Bank

Project Participant[Equity Participation]

Power Division /SEDA

Low

Inte

rest

Cred

it

Cred

it Su

ppor

t

Impl

.

O&M

Solar Roof-top Solutions

Loan

Re

pay.

Loan

Re

pay.

Implementation Model

Tech. Support

Tech

nica

lAs

sista

nce

Page 24: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

24

Page 25: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

25

B. Social ProjectsB. Social Projects

Page 26: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

Technical Assistance (Project dependent):- Project Design - Preparation of Standard Procurement and Contract

Documents- Detail Feasibility Study- Capacity Building

Grant SupportLow Interest Credit Support (For Capital Cost Buy down)

Technical Support

Financial Support

ADB & DPS SUPPORT EXPECTEDADB & DPS SUPPORT EXPECTED

Page 27: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

GOVERNMENT SUPPORT OFFEREDGOVERNMENT SUPPORT OFFERED

1. Implementation Support2. Fiscal Incentives for Project Investors and Operators3. Import Duty Exemption (Full/ Partial) for certain technology

and equipment4. Land Acquisition (Project Dependent)5. Institutional Support

Page 28: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

SUMMARY OF PROJECT FINANCINGSUMMARY OF PROJECT FINANCING

28

Page 29: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

SUMMARY OF PROJECT FINANCINGSUMMARY OF PROJECT FINANCING ………….CONTD..CONTD.

29

Page 30: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

30

SUMMARY OF PROJECT FINANCINGSUMMARY OF PROJECT FINANCING ………….CONTD..CONTD.

Capacity Addition under Consideration: 500 MW

Total Investment requirement: 2.76 b USD • Commercial Projects: 1.77 b• Social Projects: 0.99 b

ADB & Other DP Finance: 2.23 b USD (81%)• Grant: 1.38 b (62%)• Credit: 0.85 b (38%)

GOB and Private Sector Participation : 0.53 b (19%)Grant Support would also be required to undertake integrated Capacity Development Project

Page 31: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

31

CAPACITY DEVELOPMENT SUPPORT CAPACITY DEVELOPMENT SUPPORT

Requires Institutional capacity building support both in public and private sector. Strong R&D support also needs to be facilitatedCapacity development support for CDM project preparationAn Integrated Capacity Development Project may include all those essentials Setting up institution for the Standardization of equipment

Page 32: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

32

WAY FORWARDWAY FORWARD

This initiative would be considered as a landmark success story for the govt. Its success will be rest upon the govt. development partners and the private entrepreneurs initiatives by working together very closely. Development partners support will be very much needed to go for this programme.

It would be a model for other developing countries who envisage making a mass break-through in solar power development.

Page 33: Tapos Kumar Roy - 500 MW Solar Power Devt Prog

Let Sun Power Our FutureLet Sun Power Our Future

Thank You.