Page 1: Tai's Intern Work Progress  Presentation

Intern Work Progress PresentationTAI HO (HARVEY), WONGMECHANICAL ENGINEERING INTERNMENTOR: BRIAN ESPERTI, P.E.

Page 2: Tai's Intern Work Progress  Presentation

AutoCAD Editing Editing blocks that were inserted into drawings Reconfiguring the appearance of the radiator, making it more prominent. Lightening lower right portion of plan drawing’s lineweight to .002 by utilizing layers Revision cloud text to highlight revision made to the plan

End Results:

Before:Creo 2.0

Page 3: Tai's Intern Work Progress  Presentation

45211-Franklin Correctional Facility

There have been a number of leaks in the domestic hot water piping(DHW) and domestic hot water circulation piping(DHWC) in the buildings at Franklin Correctional Facility.

Department of Corrections and Community Supervision requested for “…The existing copper lines … are in need of replacing. Replace with CPVC where applicable.”

Source: http://coloradogeologicalsurvey.org/geologic-hazards/corrosive-soils/corrosive-soil-damage/

Source: http://progresoweekly.us/death-profit/

Page 4: Tai's Intern Work Progress  Presentation

45211- Pipe Sizing and Fixture Units

Fixtures Fixture Units

Lavatory, General 1Shower, Private 3Sink, Utility 3Hose Bibb 3

Page 5: Tai's Intern Work Progress  Presentation

SB510-DOT Region 3 Mapleview

Department of Transportation requested for service, stated “Evaluate existing heating system and provide recommendations and cost estimates for repair/replacement.

The facility was built in the early 60’s with a small addition put on in the mid-90’s. Oil fired heating hot water boiler was installed in the early 60’s.

Based on the drawings, the heating hot water boiler is likely to be replaced because of the new addition and the age, so heat load calculation is needed to size the boiler.

Panoramic view of boiler room

Mapleview Facility

Page 6: Tai's Intern Work Progress  Presentation

SB510-DrawingsAddition:

Original:

Page 7: Tai's Intern Work Progress  Presentation

SB510- Heat Load Calculation

Page 8: Tai's Intern Work Progress  Presentation

SB510-Boiler

629.2Mbh/0.8=786,500BTU/HR

Validate my answer with original design.

10% safety factor taken into account

New boiler should be sized up to about 941,000 BTU/HR (753.2/.8)

80% efficiency (worst case scenario)

Page 9: Tai's Intern Work Progress  Presentation

SB510- Findings