×
Log in
Upload File
Most Popular
Study
Business
Design
Technology
Travel
Explore all categories
The top documents tagged [rpc construction muon]
Status of the LHCb RPC detector Changes with respect to Note 2000-053 6 cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
213 views