TAG Conference Call: December 9th/10th, 2009

Review of CDG183 Modification Proposals

version 2.0

Page 2: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

2

www.cdg.org

2

2

Objectives of Modifications Ensure CDG183 testing continues to be rigorous

Better streamline the testing process Critically evaluate test categories

Customize required testing for supported features

Provide more information about device to test lab

Add more required testing coverage

Page 3: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

3

www.cdg.org

3

3

Overview of Proposed Changes

Introduction to Feature and Function Checklist

Addition of Data Throughput Test Plan

Other minor changes to test plan categories and coverage

Page 4: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

4

www.cdg.org

4

4

Feature and Function Checklist Found in the new “F&F” spreadsheet tab in CDG183

Requires macros to be enabled in spreadsheet

Used by test lab to collect device information from the OEM

Identifies device’s supported features, which can affect required testing

Page 5: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

5

www.cdg.org

5

5

Feature and Function Checklist (cont.) The “blue” feature list filters required test cases

Page 6: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

6

www.cdg.org

6

6

New Data Throughput Test Plan Ensures throughput performance of packet data

New plan recently contributed to the CCF

Included in this version, but compliance not yet required

Need to better evaluate the requirements

Need to ensure availability of test platform

Page 7: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

7

www.cdg.org

7

7

Other Changes Some redundant test cases removed, e.g. C.S0031 test

cases redundant with C.S0043 test cases

Some test case categories modified to optional/highly desired (easiest to see viewed via filters)

LBS test cases added in OMH specific test plan

Page 8: TAG Conference Call: December 9 th /10 th, 2009 Review of CDG183 Modification Proposals version 2.0

8

www.cdg.org

8

8

Next Steps Provide time for independent review of:

Feature and function checklist and filters

Optional/Highly Desired test cases

LBS test coverage

Harmonize any comments or concerns

Publish new version of CDG183

Pursue completion of data throughput test plan