ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE JCT-GLOBE HWY. 2017098 TRACS No. Project No. Highway Termini Contract # County District Location STATEWIDE SOUTHEAST GILA RIVER BRIDGE #20151 Item 16316 Gross Length Net Length Work Description 1 Bridge Replacement Prepared By: Jalal Kamal CONTRACTS AND SPECIFICATIONS SECTION INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION

Upload: others

Post on 27-Apr-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

ARIZONA DEPARTMENT OF TRANSPORTATION

TABULATION OF BIDS

077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE JCT-GLOBE HWY. 2017098

TRACS No. Project No. Highway Termini Contract #

County District Location

STATEWIDE SOUTHEAST GILA RIVER BRIDGE #20151

Item

16316

Gross Length Net Length Work Description

1 Bridge Replacement

Prepared By:

Jalal Kamal

CONTRACTS AND SPECIFICATIONS SECTION

INFRASTRUCTURE DELIVERY AND OPERATIONS DIVISION

Page 2: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 1 of 20

Bid Opening Date : 6/21/2019, Prequalification Required, Engineer Specialist : Jalal Kamal

BID RESULTS FOR 2017098

Completion Date:

440 Working Days

The proposed project is located in Pinal and Gila Counties on SR77 just south of Winkelman at milepost 134.50 approximately 0.2 miles South of SR177. The work consists ofremoving the existing six-span steel girder bridge and constructing a new six-span bridge, cast-in-place concrete deck. The work also includes placing new asphaltic concreteand asphaltic concrete friction course, pavement markings, guardrail, and other related work.

BidRank ContractorBid Amount

Compared ToDepartment

EstimateExtended

Sum of Items

$12,572,753.90SUNDT CONSTRUCTION, INC.

2620 S. 55TH STREET TEMPE, AZ 85282

1 -3.0% $12,572,753.90

$12,750,000.00FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING

1302 Drivers Way Tempe, AZ 85284

2 -1.7% $12,750,000.00

$12,966,809.90DEPARTMENT ESTIMATE+% $12,966,809.90

$13,313,744.49AMES CONSTRUCTION, INC.

8333 E. HARTFORD DRIVE SCOTTSDALE, AZ 85255

3 +2.7% $13,313,744.49

$13,867,464.55FNF CONSTRUCTION, INC.

115 S. 48TH ST TEMPE, AZ 85281

4 +6.9% $13,867,464.55

Winning Bidder is 3.0% Under Department Estimate (Difference = ($394,056.00))

Page 3: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 2 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020009 CU.YD. REMOVAL OF STRUCTURAL CONCRETE

Bid Rank Department Estimate 17.000 $500.000 $8,500.00

1 SUNDT CONSTRUCTION, INC. $241.750 $4,109.75 -51.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $500.000 $8,500.00 +0.0%

3 AMES CONSTRUCTION, INC. $784.790 $13,341.43 +57.0%

4 FNF CONSTRUCTION, INC. $450.000 $7,650.00 -10.0%

2020020 L.FT. REMOVAL OF CONCRETE CURB

Bid Rank Department Estimate 1,486.000 $10.000 $14,860.00

1 SUNDT CONSTRUCTION, INC. $1.800 $2,674.80 -82.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $7.000 $10,402.00 -30.0%

3 AMES CONSTRUCTION, INC. $2.400 $3,566.40 -76.0%

4 FNF CONSTRUCTION, INC. $7.500 $11,145.00 -25.0%

2020021 L.FT. REMOVAL OF CONCRETE CURB AND GUTTER

Bid Rank Department Estimate 704.000 $10.000 $7,040.00

1 SUNDT CONSTRUCTION, INC. $2.900 $2,041.60 -71.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $15.000 $10,560.00 +50.0%

3 AMES CONSTRUCTION, INC. $3.310 $2,330.24 -66.9%

4 FNF CONSTRUCTION, INC. $11.250 $7,920.00 +12.5%

2020036 SQ.YD. REMOVAL OF ASPHALTIC CONCRETE PAVEMENT

Bid Rank Department Estimate 3,663.000 $10.000 $36,630.00

1 SUNDT CONSTRUCTION, INC. $3.700 $13,553.10 -63.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $5.000 $18,315.00 -50.0%

3 AMES CONSTRUCTION, INC. $7.440 $27,252.72 -25.6%

4 FNF CONSTRUCTION, INC. $4.400 $16,117.20 -56.0%

2020041 L.FT. REMOVAL OF PIPE

Bid Rank Department Estimate 39.000 $30.000 $1,170.00

1 SUNDT CONSTRUCTION, INC. $30.700 $1,197.30 +2.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $70.000 $2,730.00 +133.3%

3 AMES CONSTRUCTION, INC. $79.550 $3,102.45 +165.2%

4 FNF CONSTRUCTION, INC. $78.000 $3,042.00 +160.0%

2020053 EACH REMOVE (SPILLWAY)

Bid Rank Department Estimate 1.000 $1,500.000 $1,500.00

1 SUNDT CONSTRUCTION, INC. $468.500 $468.50 -68.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3,500.000 $3,500.00 +133.3%

3 AMES CONSTRUCTION, INC. $2,223.570 $2,223.57 +48.2%

4 FNF CONSTRUCTION, INC. $3,250.000 $3,250.00 +116.7%

Page 4: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 3 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020054 EACH REMOVE (SLOTTED DRAIN)

Bid Rank Department Estimate 2.000 $1,500.000 $3,000.00

1 SUNDT CONSTRUCTION, INC. $912.500 $1,825.00 -39.2%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,500.000 $3,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $3,102.480 $6,204.96 +106.8%

4 FNF CONSTRUCTION, INC. $2,000.000 $4,000.00 +33.3%

2020071 L.FT. REMOVE GUARD RAIL

Bid Rank Department Estimate 2,713.000 $3.500 $9,495.50

1 SUNDT CONSTRUCTION, INC. $5.000 $13,565.00 +42.9%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3.000 $8,139.00 -14.3%

3 AMES CONSTRUCTION, INC. $2.140 $5,805.82 -38.9%

4 FNF CONSTRUCTION, INC. $2.200 $5,968.60 -37.1%

2020101 L.FT. REMOVE FENCE

Bid Rank Department Estimate 950.000 $3.000 $2,850.00

1 SUNDT CONSTRUCTION, INC. $2.500 $2,375.00 -16.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $2.000 $1,900.00 -33.3%

3 AMES CONSTRUCTION, INC. $1.840 $1,748.00 -38.7%

4 FNF CONSTRUCTION, INC. $1.700 $1,615.00 -43.3%

2020155 EACH REMOVE (RUBRAIL)

Bid Rank Department Estimate 4.000 $350.000 $1,400.00

1 SUNDT CONSTRUCTION, INC. $200.800 $803.20 -42.6%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $250.000 $1,000.00 -28.6%

3 AMES CONSTRUCTION, INC. $214.530 $858.12 -38.7%

4 FNF CONSTRUCTION, INC. $220.000 $880.00 -37.1%

2020156 EACH REMOVE (GUARDRAIL END TREATMENT)

Bid Rank Department Estimate 1.000 $650.000 $650.00

1 SUNDT CONSTRUCTION, INC. $502.000 $502.00 -22.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $600.000 $600.00 -7.7%

3 AMES CONSTRUCTION, INC. $675.700 $675.70 +4.0%

4 FNF CONSTRUCTION, INC. $690.000 $690.00 +6.2%

2020365 L.FT. REMOVE LEAD-BASED STRIPING

Bid Rank Department Estimate 340.000 $5.000 $1,700.00

1 SUNDT CONSTRUCTION, INC. $10.250 $3,485.00 +105.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $12.000 $4,080.00 +140.0%

3 AMES CONSTRUCTION, INC. $12.490 $4,246.60 +149.8%

4 FNF CONSTRUCTION, INC. $71.000 $24,140.00 +1320.0%

Page 5: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 4 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

2020366 L.SUM REMOVE LEAD-BASED PAINT MATERIALS

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

1 SUNDT CONSTRUCTION, INC. $42,000.000 $42,000.00 +1300.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $50,000.000 $50,000.00 +1566.7%

3 AMES CONSTRUCTION, INC. $118,657.940 $118,657.94 +3855.3%

4 FNF CONSTRUCTION, INC. $270,000.000 $270,000.00 +8900.0%

2020370 L.SUM DISPOSE OF LEAD-BASED PAINT MATERIALS (FORCE ACCOUNT)

Bid Rank Department Estimate 1.000 $5,000.000 $5,000.00

1 SUNDT CONSTRUCTION, INC. $5,000.000 $5,000.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $5,000.000 $5,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $5,000.000 $5,000.00 +0.0%

4 FNF CONSTRUCTION, INC. $5,000.000 $5,000.00 +0.0%

2030301 CU.YD. ROADWAY EXCAVATION

Bid Rank Department Estimate 1,777.000 $18.000 $31,986.00

1 SUNDT CONSTRUCTION, INC. $22.000 $39,094.00 +22.2%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $40.000 $71,080.00 +122.2%

3 AMES CONSTRUCTION, INC. $39.750 $70,635.75 +120.8%

4 FNF CONSTRUCTION, INC. $56.000 $99,512.00 +211.1%

2030401 CU.YD. DRAINAGE EXCAVATION

Bid Rank Department Estimate 230.000 $25.000 $5,750.00

1 SUNDT CONSTRUCTION, INC. $17.500 $4,025.00 -30.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $55.000 $12,650.00 +120.0%

3 AMES CONSTRUCTION, INC. $32.550 $7,486.50 +30.2%

4 FNF CONSTRUCTION, INC. $31.000 $7,130.00 +24.0%

3030022 CU.YD. AGGREGATE BASE, CLASS 2

Bid Rank Department Estimate 984.000 $70.000 $68,880.00

1 SUNDT CONSTRUCTION, INC. $75.000 $73,800.00 +7.1%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $65.000 $63,960.00 -7.1%

3 AMES CONSTRUCTION, INC. $73.630 $72,451.92 +5.2%

4 FNF CONSTRUCTION, INC. $87.000 $85,608.00 +24.3%

4090003 TON ASPHALTIC CONCRETE (MISCELLANEOUS STRUCTURAL)

Bid Rank Department Estimate 1,497.000 $110.000 $164,670.00

1 SUNDT CONSTRUCTION, INC. $125.400 $187,723.80 +14.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $155.000 $232,035.00 +40.9%

3 AMES CONSTRUCTION, INC. $189.140 $283,142.58 +71.9%

4 FNF CONSTRUCTION, INC. $95.000 $142,215.00 -13.6%

Page 6: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 5 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

4110001 TON ASPHALTIC CONCRETE FRICTION COURSE (MISC.)

Bid Rank Department Estimate 81.000 $280.000 $22,680.00

1 SUNDT CONSTRUCTION, INC. $330.000 $26,730.00 +17.9%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $200.000 $16,200.00 -28.6%

3 AMES CONSTRUCTION, INC. $495.360 $40,124.16 +76.9%

4 FNF CONSTRUCTION, INC. $290.000 $23,490.00 +3.6%

5010107 L.FT. PIPE, CORRUGATED METAL, SLOTTED, 18"

Bid Rank Department Estimate 84.000 $150.000 $12,600.00

1 SUNDT CONSTRUCTION, INC. $165.000 $13,860.00 +10.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $210.000 $17,640.00 +40.0%

3 AMES CONSTRUCTION, INC. $327.830 $27,537.72 +118.6%

4 FNF CONSTRUCTION, INC. $350.000 $29,400.00 +133.3%

6070038 EACH SLIP BASE (NEW)

Bid Rank Department Estimate 4.000 $250.000 $1,000.00

1 SUNDT CONSTRUCTION, INC. $220.000 $880.00 -12.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $200.000 $800.00 -20.0%

3 AMES CONSTRUCTION, INC. $213.200 $852.80 -14.7%

4 FNF CONSTRUCTION, INC. $180.000 $720.00 -28.0%

6070054 L.FT. SIGN POST (PERFORATED) (2 S)

Bid Rank Department Estimate 8.000 $12.000 $96.00

1 SUNDT CONSTRUCTION, INC. $6.500 $52.00 -45.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $10.000 $80.00 -16.7%

3 AMES CONSTRUCTION, INC. $10.960 $87.68 -8.7%

4 FNF CONSTRUCTION, INC. $10.000 $80.00 -16.7%

6070055 L.FT. SIGN POST (PERFORATED) (2 1/2 S)

Bid Rank Department Estimate 32.000 $13.000 $416.00

1 SUNDT CONSTRUCTION, INC. $8.000 $256.00 -38.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $11.000 $352.00 -15.4%

3 AMES CONSTRUCTION, INC. $12.180 $389.76 -6.3%

4 FNF CONSTRUCTION, INC. $11.000 $352.00 -15.4%

6070057 L.FT. SIGN POST (PERFORATED) (2 1/2 T)

Bid Rank Department Estimate 184.000 $14.000 $2,576.00

1 SUNDT CONSTRUCTION, INC. $10.000 $1,840.00 -28.6%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $16.000 $2,944.00 +14.3%

3 AMES CONSTRUCTION, INC. $18.270 $3,361.68 +30.5%

4 FNF CONSTRUCTION, INC. $16.000 $2,944.00 +14.3%

Page 7: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 6 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6070060 EACH FOUNDATION FOR SIGN POST (CONCRETE)

Bid Rank Department Estimate 19.000 $200.000 $3,800.00

1 SUNDT CONSTRUCTION, INC. $195.000 $3,705.00 -2.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $325.000 $6,175.00 +62.5%

3 AMES CONSTRUCTION, INC. $365.480 $6,944.12 +82.7%

4 FNF CONSTRUCTION, INC. $310.000 $5,890.00 +55.0%

6080005 SQ.FT. WARNING, MARKER, OR REGULATORY SIGN PANEL

Bid Rank Department Estimate 80.000 $20.000 $1,600.00

1 SUNDT CONSTRUCTION, INC. $13.000 $1,040.00 -35.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $21.000 $1,680.00 +5.0%

3 AMES CONSTRUCTION, INC. $24.370 $1,949.60 +21.9%

4 FNF CONSTRUCTION, INC. $21.000 $1,680.00 +5.0%

6080010 SQ.FT. SIGN PANEL (HINGED, SIGN S5)

Bid Rank Department Estimate 28.000 $35.000 $980.00

1 SUNDT CONSTRUCTION, INC. $24.000 $672.00 -31.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $26.000 $728.00 -25.7%

3 AMES CONSTRUCTION, INC. $30.460 $852.88 -13.0%

4 FNF CONSTRUCTION, INC. $26.000 $728.00 -25.7%

6080025 SQ.FT. FLAT SHEET ALUMINUM SIGN PANEL

Bid Rank Department Estimate 85.000 $30.000 $2,550.00

1 SUNDT CONSTRUCTION, INC. $13.000 $1,105.00 -56.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $26.000 $2,210.00 -13.3%

3 AMES CONSTRUCTION, INC. $30.460 $2,589.10 +1.5%

4 FNF CONSTRUCTION, INC. $26.000 $2,210.00 -13.3%

6080101 L.SUM MISCELLANEOUS WORK (SIGNS)

Bid Rank Department Estimate 1.000 $2,000.000 $2,000.00

1 SUNDT CONSTRUCTION, INC. $300.000 $300.00 -85.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3,000.000 $3,000.00 +50.0%

3 AMES CONSTRUCTION, INC. $2,436.510 $2,436.51 +21.8%

4 FNF CONSTRUCTION, INC. $2,100.000 $2,100.00 +5.0%

7010025 EACH TEMPORARY IMPACT ATTENUATION DEVICE (ENERGY ABSORBING TERM.)

Bid Rank Department Estimate 4.000 $2,250.000 $9,000.00

1 SUNDT CONSTRUCTION, INC. $1,250.000 $5,000.00 -44.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,300.000 $5,200.00 -42.2%

3 AMES CONSTRUCTION, INC. $1,482.100 $5,928.40 -34.1%

4 FNF CONSTRUCTION, INC. $1,650.000 $6,600.00 -26.7%

Page 8: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 7 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7010026 EACH-DAY TEMPORARY IMPACT ATTENUTION DEVICE (ENERGY ABS. TERM.) (IN USE)

Bid Rank Department Estimate 370.000 $35.000 $12,950.00

1 SUNDT CONSTRUCTION, INC. $25.000 $9,250.00 -28.6%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $26.000 $9,620.00 -25.7%

3 AMES CONSTRUCTION, INC. $30.460 $11,270.20 -13.0%

4 FNF CONSTRUCTION, INC. $33.000 $12,210.00 -5.7%

7015010 L.FT. TEMPORARY CONCRETE BARRIER (INSTALLATION AND REMOVAL)

Bid Rank Department Estimate 3,300.000 $15.000 $49,500.00

1 SUNDT CONSTRUCTION, INC. $17.000 $56,100.00 +13.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $13.000 $42,900.00 -13.3%

3 AMES CONSTRUCTION, INC. $14.820 $48,906.00 -1.2%

4 FNF CONSTRUCTION, INC. $19.000 $62,700.00 +26.7%

7015042 L.FT. TEMPORARY PAINTED MARKING (STRIPE)

Bid Rank Department Estimate 32,900.000 $0.150 $4,935.00

1 SUNDT CONSTRUCTION, INC. $0.220 $7,238.00 +46.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $9,870.00 +100.0%

3 AMES CONSTRUCTION, INC. $0.320 $10,528.00 +113.3%

4 FNF CONSTRUCTION, INC. $0.210 $6,909.00 +40.0%

7015052 L.FT. OBLITERATE PAVEMENT MARKING (STRIPE)

Bid Rank Department Estimate 14,500.000 $1.000 $14,500.00

1 SUNDT CONSTRUCTION, INC. $0.400 $5,800.00 -60.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.500 $7,250.00 -50.0%

3 AMES CONSTRUCTION, INC. $0.770 $11,165.00 -23.0%

4 FNF CONSTRUCTION, INC. $0.500 $7,250.00 -50.0%

7015091 SQ.FT. SPECIALTY SIGNS

Bid Rank Department Estimate 1,022.000 $20.000 $20,440.00

1 SUNDT CONSTRUCTION, INC. $20.000 $20,440.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $16.000 $16,352.00 -20.0%

3 AMES CONSTRUCTION, INC. $18.740 $19,152.28 -6.3%

4 FNF CONSTRUCTION, INC. $21.000 $21,462.00 +5.0%

7016020 L.FT./DAY TEMPORARY CONCRETE BARRIER (IN USE)

Bid Rank Department Estimate 593,200.000 $0.050 $29,660.00

1 SUNDT CONSTRUCTION, INC. $0.040 $23,728.00 -20.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.050 $29,660.00 +0.0%

3 AMES CONSTRUCTION, INC. $0.050 $29,660.00 +0.0%

4 FNF CONSTRUCTION, INC. $0.050 $29,660.00 +0.0%

Page 9: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 8 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016030 EACH-DAY BARRICADE (TYPE II, VERT.PANEL, TUBULAR MARKER)

Bid Rank Department Estimate 24,300.000 $0.250 $6,075.00

1 SUNDT CONSTRUCTION, INC. $0.100 $2,430.00 -60.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $4,860.00 -20.0%

3 AMES CONSTRUCTION, INC. $0.130 $3,159.00 -48.0%

4 FNF CONSTRUCTION, INC. $0.200 $4,860.00 -20.0%

7016031 EACH-DAY BARRICADE (TYPE III, HIGH LEVEL FLAG TREES)

Bid Rank Department Estimate 5,870.000 $0.350 $2,054.50

1 SUNDT CONSTRUCTION, INC. $0.300 $1,761.00 -14.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $1,761.00 -14.3%

3 AMES CONSTRUCTION, INC. $0.320 $1,878.40 -8.6%

4 FNF CONSTRUCTION, INC. $0.500 $2,935.00 +42.9%

7016032 EACH-DAY PORTABLE SIGN STANDS (RIGID)

Bid Rank Department Estimate 720.000 $0.150 $108.00

1 SUNDT CONSTRUCTION, INC. $0.250 $180.00 +66.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $216.00 +100.0%

3 AMES CONSTRUCTION, INC. $0.290 $208.80 +93.3%

4 FNF CONSTRUCTION, INC. $0.300 $216.00 +100.0%

7016033 EACH-DAY PORTABLE SIGN STANDS (SPRING TYPE)

Bid Rank Department Estimate 1,400.000 $0.500 $700.00

1 SUNDT CONSTRUCTION, INC. $0.300 $420.00 -40.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.500 $700.00 +0.0%

3 AMES CONSTRUCTION, INC. $0.460 $644.00 -8.0%

4 FNF CONSTRUCTION, INC. $0.600 $840.00 +20.0%

7016035 EACH-DAY WARNING LIGHTS (TYPE A)

Bid Rank Department Estimate 38,900.000 $0.100 $3,890.00

1 SUNDT CONSTRUCTION, INC. $0.130 $5,057.00 +30.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.100 $3,890.00 +0.0%

3 AMES CONSTRUCTION, INC. $0.140 $5,446.00 +40.0%

4 FNF CONSTRUCTION, INC. $0.150 $5,835.00 +50.0%

7016037 EACH-DAY WARNING LIGHTS (TYPE C)

Bid Rank Department Estimate 13,900.000 $0.200 $2,780.00

1 SUNDT CONSTRUCTION, INC. $0.130 $1,807.00 -35.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.100 $1,390.00 -50.0%

3 AMES CONSTRUCTION, INC. $0.140 $1,946.00 -30.0%

4 FNF CONSTRUCTION, INC. $0.170 $2,363.00 -15.0%

Page 10: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 9 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016038 EACH-DAY TRAFFIC CONE (28 INCHES)

Bid Rank Department Estimate 790.000 $0.150 $118.50

1 SUNDT CONSTRUCTION, INC. $0.130 $102.70 -13.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $158.00 +33.3%

3 AMES CONSTRUCTION, INC. $0.140 $110.60 -6.7%

4 FNF CONSTRUCTION, INC. $0.200 $158.00 +33.3%

7016039 EACH-DAY EMBEDDED SIGN POST

Bid Rank Department Estimate 25,500.000 $0.120 $3,060.00

1 SUNDT CONSTRUCTION, INC. $0.130 $3,315.00 +8.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $5,100.00 +66.7%

3 AMES CONSTRUCTION, INC. $0.290 $7,395.00 +141.7%

4 FNF CONSTRUCTION, INC. $0.200 $5,100.00 +66.7%

7016050 EACH-DAY TRUCK MOUNTED ATTENUATOR

Bid Rank Department Estimate 4.000 $400.000 $1,600.00

1 SUNDT CONSTRUCTION, INC. $201.000 $804.00 -49.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $300.000 $1,200.00 -25.0%

3 AMES CONSTRUCTION, INC. $258.890 $1,035.56 -35.3%

4 FNF CONSTRUCTION, INC. $1,200.000 $4,800.00 +200.0%

7016051 EACH-DAY TEMPORARY SIGN (LESS THAN 10 S.F.)

Bid Rank Department Estimate 4,680.000 $0.300 $1,404.00

1 SUNDT CONSTRUCTION, INC. $0.160 $748.80 -46.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $1,404.00 +0.0%

3 AMES CONSTRUCTION, INC. $0.320 $1,497.60 +6.7%

4 FNF CONSTRUCTION, INC. $0.300 $1,404.00 +0.0%

7016052 EACH-DAY TEMPORARY SIGN (10 S.F. OR MORE)

Bid Rank Department Estimate 12,900.000 $0.500 $6,450.00

1 SUNDT CONSTRUCTION, INC. $0.270 $3,483.00 -46.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.400 $5,160.00 -20.0%

3 AMES CONSTRUCTION, INC. $0.320 $4,128.00 -36.0%

4 FNF CONSTRUCTION, INC. $0.400 $5,160.00 -20.0%

7016067 EACH-DAY CHANGEABLE MESSAGE BOARD (CONTRACTOR FURNISHED)

Bid Rank Department Estimate 1,250.000 $25.000 $31,250.00

1 SUNDT CONSTRUCTION, INC. $19.500 $24,375.00 -22.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $35.000 $43,750.00 +40.0%

3 AMES CONSTRUCTION, INC. $25.190 $31,487.50 +0.8%

4 FNF CONSTRUCTION, INC. $40.000 $50,000.00 +60.0%

Page 11: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 10 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7016071 HOUR PILOT VEHICLE WITH DRIVER

Bid Rank Department Estimate 110.000 $50.000 $5,500.00

1 SUNDT CONSTRUCTION, INC. $40.640 $4,470.40 -18.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $51.000 $5,610.00 +2.0%

3 AMES CONSTRUCTION, INC. $54.940 $6,043.40 +9.9%

4 FNF CONSTRUCTION, INC. $70.000 $7,700.00 +40.0%

7016075 HOUR FLAGGING SERVICES (CIVILIAN)

Bid Rank Department Estimate 780.000 $33.000 $25,740.00

1 SUNDT CONSTRUCTION, INC. $35.600 $27,768.00 +7.9%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $23.000 $17,940.00 -30.3%

3 AMES CONSTRUCTION, INC. $47.740 $37,237.20 +44.7%

4 FNF CONSTRUCTION, INC. $45.000 $35,100.00 +36.4%

7016078 HOUR FLAGGING SERVICES (LOCAL ENFORCEMENT OFFICER)

Bid Rank Department Estimate 280.000 $75.000 $21,000.00

1 SUNDT CONSTRUCTION, INC. $70.500 $19,740.00 -6.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $85.000 $23,800.00 +13.3%

3 AMES CONSTRUCTION, INC. $98.680 $27,630.40 +31.6%

4 FNF CONSTRUCTION, INC. $90.000 $25,200.00 +20.0%

7016080 HOUR FLAGGING SERVICES (DPS)

Bid Rank Department Estimate 400.000 $65.260 $26,104.00

1 SUNDT CONSTRUCTION, INC. $65.260 $26,104.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $65.260 $26,104.00 +0.0%

3 AMES CONSTRUCTION, INC. $65.260 $26,104.00 +0.0%

4 FNF CONSTRUCTION, INC. $65.260 $26,104.00 +0.0%

7040005 L.FT. PAVEMENT MARKING (WHITE EXTRUDED THERMOPLASTIC) (0.090")

Bid Rank Department Estimate 6,800.000 $0.600 $4,080.00

1 SUNDT CONSTRUCTION, INC. $0.520 $3,536.00 -13.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.500 $3,400.00 -16.7%

3 AMES CONSTRUCTION, INC. $0.470 $3,196.00 -21.7%

4 FNF CONSTRUCTION, INC. $0.500 $3,400.00 -16.7%

7040006 L.FT. PAVEMENT MARKING (YELLOW EXTRUDED THERMOPLASTIC) (0.090")

Bid Rank Department Estimate 9,390.000 $0.600 $5,634.00

1 SUNDT CONSTRUCTION, INC. $0.520 $4,882.80 -13.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.500 $4,695.00 -16.7%

3 AMES CONSTRUCTION, INC. $0.790 $7,418.10 +31.7%

4 FNF CONSTRUCTION, INC. $0.500 $4,695.00 -16.7%

Page 12: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 11 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7040073 EACH PAVEMENT LEGEND (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090")

Bid Rank Department Estimate 1.000 $140.000 $140.00

1 SUNDT CONSTRUCTION, INC. $150.000 $150.00 +7.1%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $120.000 $120.00 -14.3%

3 AMES CONSTRUCTION, INC. $184.580 $184.58 +31.8%

4 FNF CONSTRUCTION, INC. $117.000 $117.00 -16.4%

7040074 EACH PAVEMENT SYMBOL (EXTRUDED THERMOPLASTIC) (ALKYD) (0.090")

Bid Rank Department Estimate 2.000 $140.000 $280.00

1 SUNDT CONSTRUCTION, INC. $150.000 $300.00 +7.1%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $120.000 $240.00 -14.3%

3 AMES CONSTRUCTION, INC. $168.530 $337.06 +20.4%

4 FNF CONSTRUCTION, INC. $107.000 $214.00 -23.6%

7042031 L.FT. PRIMER-SEALER FOR PCCP THERMOPLASTIC STRIPING

Bid Rank Department Estimate 11,900.000 $0.300 $3,570.00

1 SUNDT CONSTRUCTION, INC. $0.150 $1,785.00 -50.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $2,380.00 -33.3%

3 AMES CONSTRUCTION, INC. $0.090 $1,071.00 -70.0%

4 FNF CONSTRUCTION, INC. $0.110 $1,309.00 -63.3%

7042051 L.FT. REMOVAL OF CURING COMPOUND FOR STRIPING

Bid Rank Department Estimate 11,900.000 $0.400 $4,760.00

1 SUNDT CONSTRUCTION, INC. $0.150 $1,785.00 -62.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $3,570.00 -25.0%

3 AMES CONSTRUCTION, INC. $0.400 $4,760.00 +0.0%

4 FNF CONSTRUCTION, INC. $0.260 $3,094.00 -35.0%

7060015 EACH PAVEMENT MARKER, RAISED, TYPE D

Bid Rank Department Estimate 90.000 $6.000 $540.00

1 SUNDT CONSTRUCTION, INC. $4.500 $405.00 -25.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $6.000 $540.00 +0.0%

3 AMES CONSTRUCTION, INC. $8.030 $722.70 +33.8%

4 FNF CONSTRUCTION, INC. $5.250 $472.50 -12.5%

7060018 EACH PAVEMENT MARKER, RAISED, TYPE G

Bid Rank Department Estimate 19.000 $4.000 $76.00

1 SUNDT CONSTRUCTION, INC. $4.500 $85.50 +12.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $6.000 $114.00 +50.0%

3 AMES CONSTRUCTION, INC. $8.030 $152.57 +100.8%

4 FNF CONSTRUCTION, INC. $5.250 $99.75 +31.3%

Page 13: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 12 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

7080001 L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (WHITE)

Bid Rank Department Estimate 4,900.000 $0.400 $1,960.00

1 SUNDT CONSTRUCTION, INC. $0.220 $1,078.00 -45.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $980.00 -50.0%

3 AMES CONSTRUCTION, INC. $0.190 $931.00 -52.5%

4 FNF CONSTRUCTION, INC. $0.150 $735.00 -62.5%

7080011 L.FT. PERMANENT PAVEMENT MARKING (PAINTED) (YELLOW)

Bid Rank Department Estimate 6,260.000 $0.400 $2,504.00

1 SUNDT CONSTRUCTION, INC. $0.220 $1,377.20 -45.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.200 $1,252.00 -50.0%

3 AMES CONSTRUCTION, INC. $0.190 $1,189.40 -52.5%

4 FNF CONSTRUCTION, INC. $0.150 $939.00 -62.5%

7080121 EACH PERMANENT PAVEMENT MARKING (PAINTED SYMBOL) (ARROW)

Bid Rank Department Estimate 2.000 $25.000 $50.00

1 SUNDT CONSTRUCTION, INC. $75.000 $150.00 +200.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $55.000 $110.00 +120.0%

3 AMES CONSTRUCTION, INC. $80.250 $160.50 +221.0%

4 FNF CONSTRUCTION, INC. $51.000 $102.00 +104.0%

7080301 EACH PAINT BULL NOSE

Bid Rank Department Estimate 2.000 $115.000 $230.00

1 SUNDT CONSTRUCTION, INC. $150.000 $300.00 +30.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $100.000 $200.00 -13.0%

3 AMES CONSTRUCTION, INC. $144.450 $288.90 +25.6%

4 FNF CONSTRUCTION, INC. $92.000 $184.00 -20.0%

7370210 L.SUM TEMPORARY TRAFFIC SIGNALS (PORTABLE)

Bid Rank Department Estimate 1.000 $45,000.000 $45,000.00

1 SUNDT CONSTRUCTION, INC. $150,000.000 $150,000.00 +233.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $40,000.000 $40,000.00 -11.1%

3 AMES CONSTRUCTION, INC. $43,004.370 $43,004.37 -4.4%

4 FNF CONSTRUCTION, INC. $75,000.000 $75,000.00 +66.7%

8050003 ACRE SEEDING (CLASS II)

Bid Rank Department Estimate 19.000 $4,000.000 $76,000.00

1 SUNDT CONSTRUCTION, INC. $3,450.000 $65,550.00 -13.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $4,000.000 $76,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $4,202.980 $79,856.62 +5.1%

4 FNF CONSTRUCTION, INC. $4,200.000 $79,800.00 +5.0%

Page 14: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 13 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

8101014 L.FT. EROSION CONTROL (WATTLESS) (20")

Bid Rank Department Estimate 2,700.000 $8.000 $21,600.00

1 SUNDT CONSTRUCTION, INC. $3.250 $8,775.00 -59.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $4.000 $10,800.00 -50.0%

3 AMES CONSTRUCTION, INC. $3.590 $9,693.00 -55.1%

4 FNF CONSTRUCTION, INC. $6.000 $16,200.00 -25.0%

8101018 SQ.YD. EROSION CONTROL (STABILIZED CONSTRUCTION ENTRANCE/EXIT GRAVEL PAD)

Bid Rank Department Estimate 680.000 $15.000 $10,200.00

1 SUNDT CONSTRUCTION, INC. $28.700 $19,516.00 +91.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $15.000 $10,200.00 +0.0%

3 AMES CONSTRUCTION, INC. $4.870 $3,311.60 -67.5%

4 FNF CONSTRUCTION, INC. $13.000 $8,840.00 -13.3%

8101021 L.FT. EROSION CONTROL (WATTLES) (9")

Bid Rank Department Estimate 585.000 $4.000 $2,340.00

1 SUNDT CONSTRUCTION, INC. $2.100 $1,228.50 -47.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $5.000 $2,925.00 +25.0%

3 AMES CONSTRUCTION, INC. $2.330 $1,363.05 -41.8%

4 FNF CONSTRUCTION, INC. $3.500 $2,047.50 -12.5%

9010001 L.SUM MOBILIZATION

Bid Rank Department Estimate 1.000 $1,250,000.000 $1,250,000.00

1 SUNDT CONSTRUCTION, INC. $1,150,000.000 $1,150,000.00 -8.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,537,342.000 $1,537,342.00 +23.0%

3 AMES CONSTRUCTION, INC. $1,284,000.000 $1,284,000.00 +2.7%

4 FNF CONSTRUCTION, INC. $1,400,000.000 $1,400,000.00 +12.0%

9020001 L.FT. CHAIN LINK FENCE, TYPE 1 (36")

Bid Rank Department Estimate 300.000 $30.000 $9,000.00

1 SUNDT CONSTRUCTION, INC. $15.000 $4,500.00 -50.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $16.000 $4,800.00 -46.7%

3 AMES CONSTRUCTION, INC. $22.430 $6,729.00 -25.2%

4 FNF CONSTRUCTION, INC. $16.000 $4,800.00 -46.7%

9030012 L.FT. BARBED WIRE FENCE, TYPE 2

Bid Rank Department Estimate 600.000 $5.000 $3,000.00

1 SUNDT CONSTRUCTION, INC. $5.000 $3,000.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $14.000 $8,400.00 +180.0%

3 AMES CONSTRUCTION, INC. $18.780 $11,268.00 +275.6%

4 FNF CONSTRUCTION, INC. $14.000 $8,400.00 +180.0%

Page 15: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 14 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9050005 L.FT. GUARD RAIL, W-BEAM, SINGLE FACE (MESH)

Bid Rank Department Estimate 1,000.000 $35.000 $35,000.00

1 SUNDT CONSTRUCTION, INC. $40.000 $40,000.00 +14.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $26.000 $26,000.00 -25.7%

3 AMES CONSTRUCTION, INC. $32.780 $32,780.00 -6.3%

4 FNF CONSTRUCTION, INC. $26.000 $26,000.00 -25.7%

9050011 L.FT. GUARD RAIL, THRIE BEAM

Bid Rank Department Estimate 4.000 $2,500.000 $10,000.00

1 SUNDT CONSTRUCTION, INC. $4,500.000 $18,000.00 +80.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $2,000.000 $8,000.00 -20.0%

3 AMES CONSTRUCTION, INC. $2,402.310 $9,609.24 -3.9%

4 FNF CONSTRUCTION, INC. $1,900.000 $7,600.00 -24.0%

9050025 EACH GUARD RAIL TERMINAL (TANGENT TYPE)

Bid Rank Department Estimate 1.000 $4,000.000 $4,000.00

1 SUNDT CONSTRUCTION, INC. $5,000.000 $5,000.00 +25.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3,700.000 $3,700.00 -7.5%

3 AMES CONSTRUCTION, INC. $4,689.880 $4,689.88 +17.2%

4 FNF CONSTRUCTION, INC. $3,750.000 $3,750.00 -6.3%

9080001 L.FT. CONCRETE CURB (C-05.10) (TYPE A)

Bid Rank Department Estimate 740.000 $15.000 $11,100.00

1 SUNDT CONSTRUCTION, INC. $22.200 $16,428.00 +48.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $35.000 $25,900.00 +133.3%

3 AMES CONSTRUCTION, INC. $67.680 $50,083.20 +351.2%

4 FNF CONSTRUCTION, INC. $38.000 $28,120.00 +153.3%

9080084 L.FT. CONCRETE CURB AND GUTTER (TYPE D)

Bid Rank Department Estimate 654.000 $20.000 $13,080.00

1 SUNDT CONSTRUCTION, INC. $30.500 $19,947.00 +52.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $40.000 $26,160.00 +100.0%

3 AMES CONSTRUCTION, INC. $91.750 $60,004.50 +358.8%

4 FNF CONSTRUCTION, INC. $53.000 $34,662.00 +165.0%

9080085 L.FT. CONCRETE CURB AND GUTTER (VARIABLE WIDTH GUTTER@ GR TERMINAL)(C-10.77)

Bid Rank Department Estimate 100.000 $30.000 $3,000.00

1 SUNDT CONSTRUCTION, INC. $46.400 $4,640.00 +54.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $100.000 $10,000.00 +233.3%

3 AMES CONSTRUCTION, INC. $147.320 $14,732.00 +391.1%

4 FNF CONSTRUCTION, INC. $108.000 $10,800.00 +260.0%

Page 16: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 15 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9160001 L.FT. EMBANKMENT CURB

Bid Rank Department Estimate 560.000 $10.000 $5,600.00

1 SUNDT CONSTRUCTION, INC. $10.400 $5,824.00 +4.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $11.000 $6,160.00 +10.0%

3 AMES CONSTRUCTION, INC. $26.460 $14,817.60 +164.6%

4 FNF CONSTRUCTION, INC. $11.000 $6,160.00 +10.0%

9170011 L.FT. EMBANKMENT DOWNDRAINS (C-4.20)

Bid Rank Department Estimate 126.000 $90.000 $11,340.00

1 SUNDT CONSTRUCTION, INC. $89.500 $11,277.00 -0.6%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $200.000 $25,200.00 +122.2%

3 AMES CONSTRUCTION, INC. $47.740 $6,015.24 -47.0%

4 FNF CONSTRUCTION, INC. $116.000 $14,616.00 +28.9%

9170012 L.FT. EMBANKMENT DOWNDRAINS (C-4.20) (DOUBLE)

Bid Rank Department Estimate 100.000 $75.000 $7,500.00

1 SUNDT CONSTRUCTION, INC. $90.600 $9,060.00 +20.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $250.000 $25,000.00 +233.3%

3 AMES CONSTRUCTION, INC. $70.450 $7,045.00 -6.1%

4 FNF CONSTRUCTION, INC. $118.000 $11,800.00 +57.3%

9170031 EACH INLET (C-4.20) (SINGLE)

Bid Rank Department Estimate 2.000 $3,000.000 $6,000.00

1 SUNDT CONSTRUCTION, INC. $3,606.000 $7,212.00 +20.2%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3,000.000 $6,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $9,143.470 $18,286.94 +204.8%

4 FNF CONSTRUCTION, INC. $5,300.000 $10,600.00 +76.7%

9170032 EACH INLET (C-4.20) (DOUBLE)

Bid Rank Department Estimate 2.000 $3,500.000 $7,000.00

1 SUNDT CONSTRUCTION, INC. $4,200.500 $8,401.00 +20.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $6,000.000 $12,000.00 +71.4%

3 AMES CONSTRUCTION, INC. $12,806.470 $25,612.94 +265.9%

4 FNF CONSTRUCTION, INC. $6,600.000 $13,200.00 +88.6%

9170042 EACH OUTLET (C-4.20)

Bid Rank Department Estimate 2.000 $4,500.000 $9,000.00

1 SUNDT CONSTRUCTION, INC. $3,507.000 $7,014.00 -22.1%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $5,000.000 $10,000.00 +11.1%

3 AMES CONSTRUCTION, INC. $15,395.830 $30,791.66 +242.1%

4 FNF CONSTRUCTION, INC. $4,000.000 $8,000.00 -11.1%

Page 17: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 16 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9170044 EACH OUTLET (C-4.20) (DOUBLE)

Bid Rank Department Estimate 2.000 $5,000.000 $10,000.00

1 SUNDT CONSTRUCTION, INC. $3,489.500 $6,979.00 -30.2%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $7,000.000 $14,000.00 +40.0%

3 AMES CONSTRUCTION, INC. $16,862.440 $33,724.88 +237.2%

4 FNF CONSTRUCTION, INC. $4,000.000 $8,000.00 -20.0%

9230002 HOUR CONTRACTOR BASED ON-THE-JOB TRAINING

Bid Rank Department Estimate 3,000.000 $3.000 $9,000.00

1 SUNDT CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3.000 $9,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

4 FNF CONSTRUCTION, INC. $3.000 $9,000.00 +0.0%

9240010 L.SUM FORCE ACCOUNT WORK (BIOLOGIST)

Bid Rank Department Estimate 1.000 $3,000.000 $3,000.00

1 SUNDT CONSTRUCTION, INC. $3,000.000 $3,000.00 +0.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $3,000.000 $3,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $3,000.000 $3,000.00 +0.0%

4 FNF CONSTRUCTION, INC. $3,000.000 $3,000.00 +0.0%

9240170 L.SUM CONTRACTOR QUALITY CONTROL

Bid Rank Department Estimate 1.000 $45,000.000 $45,000.00

1 SUNDT CONSTRUCTION, INC. $125,000.000 $125,000.00 +177.8%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $175,000.000 $175,000.00 +288.9%

3 AMES CONSTRUCTION, INC. $92,000.000 $92,000.00 +104.4%

4 FNF CONSTRUCTION, INC. $125,000.000 $125,000.00 +177.8%

9240181 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(MANUAL/MECHANICAL METHODS)

Bid Rank Department Estimate 62,073.000 $0.300 $18,621.90

1 SUNDT CONSTRUCTION, INC. $0.330 $20,484.09 +10.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.400 $24,829.20 +33.3%

3 AMES CONSTRUCTION, INC. $0.410 $25,449.93 +36.7%

4 FNF CONSTRUCTION, INC. $0.400 $24,829.20 +33.3%

9240182 SQ.YD. MISCELLANEOUS WORK (CONTROL OF NOXIOUS PLANTS)(HERBICIDE)

Bid Rank Department Estimate 75,866.000 $0.250 $18,966.50

1 SUNDT CONSTRUCTION, INC. $0.210 $15,931.86 -16.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $0.300 $22,759.80 +20.0%

3 AMES CONSTRUCTION, INC. $0.260 $19,725.16 +4.0%

4 FNF CONSTRUCTION, INC. $0.300 $22,759.80 +20.0%

Page 18: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 17 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

9250001 L.SUM CONSTRUCTION SURVEYING AND LAYOUT

Bid Rank Department Estimate 1.000 $50,000.000 $50,000.00

1 SUNDT CONSTRUCTION, INC. $200,000.000 $200,000.00 +300.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $100,000.000 $100,000.00 +100.0%

3 AMES CONSTRUCTION, INC. $173,500.000 $173,500.00 +247.0%

4 FNF CONSTRUCTION, INC. $100,000.000 $100,000.00 +100.0%

2020002 A L.SUM REMOVE BRIDGE

Bid Rank Department Estimate 1.000 $400,000.000 $400,000.00

1 SUNDT CONSTRUCTION, INC. $350,000.000 $350,000.00 -12.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $500,000.000 $500,000.00 +25.0%

3 AMES CONSTRUCTION, INC. $313,795.000 $313,795.00 -21.6%

4 FNF CONSTRUCTION, INC. $404,000.000 $404,000.00 +1.0%

2030501 A CU.YD. STRUCTURAL EXCAVATION

Bid Rank Department Estimate 220.000 $50.000 $11,000.00

1 SUNDT CONSTRUCTION, INC. $262.000 $57,640.00 +424.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $45.000 $9,900.00 -10.0%

3 AMES CONSTRUCTION, INC. $76.090 $16,739.80 +52.2%

4 FNF CONSTRUCTION, INC. $261.000 $57,420.00 +422.0%

2030506 A CU.YD. STRUCTURE BACKFILL

Bid Rank Department Estimate 275.000 $100.000 $27,500.00

1 SUNDT CONSTRUCTION, INC. $69.600 $19,140.00 -30.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $90.000 $24,750.00 -10.0%

3 AMES CONSTRUCTION, INC. $77.140 $21,213.50 -22.9%

4 FNF CONSTRUCTION, INC. $175.000 $48,125.00 +75.0%

6010002 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,000)

Bid Rank Department Estimate 21.000 $700.000 $14,700.00

1 SUNDT CONSTRUCTION, INC. $921.500 $19,351.50 +31.6%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $2,000.000 $42,000.00 +185.7%

3 AMES CONSTRUCTION, INC. $750.000 $15,750.00 +7.1%

4 FNF CONSTRUCTION, INC. $1,050.000 $22,050.00 +50.0%

6010003 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 3,500)

Bid Rank Department Estimate 1,118.000 $750.000 $838,500.00

1 SUNDT CONSTRUCTION, INC. $890.000 $995,020.00 +18.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,400.000 $1,565,200.00 +86.7%

3 AMES CONSTRUCTION, INC. $950.000 $1,062,100.00 +26.7%

4 FNF CONSTRUCTION, INC. $790.000 $883,220.00 +5.3%

Page 19: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 18 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6010005 A CU.YD. STRUCTURAL CONCRETE (CLASS S) (F'C = 4,500)

Bid Rank Department Estimate 1,610.000 $800.000 $1,288,000.00

1 SUNDT CONSTRUCTION, INC. $775.000 $1,247,750.00 -3.1%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $800.000 $1,288,000.00 +0.0%

3 AMES CONSTRUCTION, INC. $650.000 $1,046,500.00 -18.8%

4 FNF CONSTRUCTION, INC. $860.000 $1,384,600.00 +7.5%

6010831 A SQ.YD. GROOVE BRIDGE DECK

Bid Rank Department Estimate 4,486.000 $8.000 $35,888.00

1 SUNDT CONSTRUCTION, INC. $5.000 $22,430.00 -37.5%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $15.000 $67,290.00 +87.5%

3 AMES CONSTRUCTION, INC. $6.770 $30,370.22 -15.4%

4 FNF CONSTRUCTION, INC. $7.000 $31,402.00 -12.5%

6011132 A L.FT. COMBINATION PEDESTRIAN-TRAFFIC BRIDGE RAILING

Bid Rank Department Estimate 812.000 $120.000 $97,440.00

1 SUNDT CONSTRUCTION, INC. $290.000 $235,480.00 +141.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $175.000 $142,100.00 +45.8%

3 AMES CONSTRUCTION, INC. $305.910 $248,398.92 +154.9%

4 FNF CONSTRUCTION, INC. $340.000 $276,080.00 +183.3%

6011140 A L.FT. F-SHAPE BRIDGE CONCRETE BARRIER AND TRANSITION (34")

Bid Rank Department Estimate 1,624.000 $120.000 $194,880.00

1 SUNDT CONSTRUCTION, INC. $115.000 $186,760.00 -4.2%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $150.000 $243,600.00 +25.0%

3 AMES CONSTRUCTION, INC. $85.900 $139,501.60 -28.4%

4 FNF CONSTRUCTION, INC. $130.000 $211,120.00 +8.3%

6011345 A L.FT. DECK JOINT ASSEMBLY (STRIP SEAL JOINT)

Bid Rank Department Estimate 164.000 $250.000 $41,000.00

1 SUNDT CONSTRUCTION, INC. $255.000 $41,820.00 +2.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $400.000 $65,600.00 +60.0%

3 AMES CONSTRUCTION, INC. $222.350 $36,465.40 -11.1%

4 FNF CONSTRUCTION, INC. $325.000 $53,300.00 +30.0%

6011371 A SQ.FT. APPROACH SLAB (SD 2.01)

Bid Rank Department Estimate 1,857.000 $35.000 $64,995.00

1 SUNDT CONSTRUCTION, INC. $27.500 $51,067.50 -21.4%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $40.000 $74,280.00 +14.3%

3 AMES CONSTRUCTION, INC. $28.850 $53,574.45 -17.6%

4 FNF CONSTRUCTION, INC. $42.000 $77,994.00 +20.0%

Page 20: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 19 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6014953 A L.FT. PRECAST, P/S MEMBER (AASHTO TYPE 5 GIRDER)

Bid Rank Department Estimate 2,377.000 $300.000 $713,100.00

1 SUNDT CONSTRUCTION, INC. $485.000 $1,152,845.00 +61.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $440.000 $1,045,880.00 +46.7%

3 AMES CONSTRUCTION, INC. $473.550 $1,125,628.35 +57.9%

4 FNF CONSTRUCTION, INC. $505.000 $1,200,385.00 +68.3%

6014973 A L.FT. PRECAST, P/S MEMBER (AASHTO TYPE 6 SUPER GIRDER)

Bid Rank Department Estimate 2,877.000 $350.000 $1,006,950.00

1 SUNDT CONSTRUCTION, INC. $500.000 $1,438,500.00 +42.9%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $460.000 $1,323,420.00 +31.4%

3 AMES CONSTRUCTION, INC. $452.230 $1,301,065.71 +29.2%

4 FNF CONSTRUCTION, INC. $495.000 $1,424,115.00 +41.4%

6015101 A EACH RESTRAINERS, VERTICAL EARTHQUAKE (FIXED)

Bid Rank Department Estimate 48.000 $200.000 $9,600.00

1 SUNDT CONSTRUCTION, INC. $137.500 $6,600.00 -31.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $200.000 $9,600.00 +0.0%

3 AMES CONSTRUCTION, INC. $114.050 $5,474.40 -43.0%

4 FNF CONSTRUCTION, INC. $120.000 $5,760.00 -40.0%

6015102 A EACH RESTRAINERS, VERTICAL EARTHQUAKE (EXPANSION)

Bid Rank Department Estimate 48.000 $200.000 $9,600.00

1 SUNDT CONSTRUCTION, INC. $255.750 $12,276.00 +27.9%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $300.000 $14,400.00 +50.0%

3 AMES CONSTRUCTION, INC. $201.540 $9,673.92 +0.8%

4 FNF CONSTRUCTION, INC. $250.000 $12,000.00 +25.0%

6050002 A LB. REINFORCING STEEL

Bid Rank Department Estimate 631,905.000 $1.200 $758,286.00

1 SUNDT CONSTRUCTION, INC. $1.400 $884,667.00 +16.7%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1.600 $1,011,048.00 +33.3%

3 AMES CONSTRUCTION, INC. $1.110 $701,414.55 -7.5%

4 FNF CONSTRUCTION, INC. $1.000 $631,905.00 -16.7%

6090084 B L.FT. DRILLED SHAFT FOUNDATION (84")

Bid Rank Department Estimate 360.000 $2,500.000 $900,000.00

1 SUNDT CONSTRUCTION, INC. $1,800.000 $648,000.00 -28.0%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,100.000 $396,000.00 -56.0%

3 AMES CONSTRUCTION, INC. $1,927.540 $693,914.40 -22.9%

4 FNF CONSTRUCTION, INC. $1,920.000 $691,200.00 -23.2%

Page 21: TABULATION OF BIDS - Amazon S3s3-us-west-2.amazonaws.com/adot-cmss3bp00001/document/...ARIZONA DEPARTMENT OF TRANSPORTATION TABULATION OF BIDS 077 SW 134 H841601C 077-A-(210)T TUCSON-ORACLE

Printed: 7/22/2019 Page 20 of 20

*** Bid Tabs for Project H841601C ***

ItemNumber

Unit ofMeasure Item Description Quantity Unit Price Extended Amount

Compared ToDept Estimate

6090096 B L.FT. DRILLED SHAFT FOUNDATION (96")

Bid Rank Department Estimate 1,380.000 $3,000.000 $4,140,000.00

1 SUNDT CONSTRUCTION, INC. $1,850.000 $2,553,000.00 -38.3%

2 FISHER SAND & GRAVEL CO. DBA SOUTHWEST ASPHALT PAVING $1,350.000 $1,863,000.00 -55.0%

3 AMES CONSTRUCTION, INC. $2,458.870 $3,393,240.60 -18.0%

4 FNF CONSTRUCTION, INC. $2,380.000 $3,284,400.00 -20.7%