  • Table of Contents

    Background ................................................................................................................................... 6

    1. The objectives of the program ........................................................................................... 6

    2. Location of the hospitals ..................................................................................................... 6

    3. Process of assessment ....................................................................................................... 7

    1. MINATAI THAKARE HOSPITAL KONDHAVA ..................................................................... 7

    a. Existing Status of Hospital/Wash Infrastructure Gaps ................................................. 7

    Photographs .............................................................................................................................. 10

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 10

    2. AMARALE HOSPITAL SHIVAJINAGAR ............................................................................. 11

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 11

    Photographs ................................................................................... Error! Bookmark not defined.

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 14

    3. CHHTRAPATI SHIVRAY HOSPITAL, NAGPUR CHAL .................................................... 14

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 14

    Photographs .............................................................................................................................. 16

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 17

    4. LAYGUDE HOSPITAL DHAYARI ........................................................................................ 17

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 17

    Photographs .............................................................................................................................. 20

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 20

    5. MINATAI THAKARE POLYCLINIC VADGAON SHERI ..................................................... 21

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 21

    Photographs .............................................................................................................................. 23

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 24

    6. PMC HOSPITAL KHARADI ................................................................................................. 24

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 24

    Photographs .............................................................................................................................. 27

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 27

    7. PMC HOSPITAL KATRAJ .................................................................................................... 28

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 28

    Photographs .............................................................................................................................. 31

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 31

  • 8. SHIVARKAR HOSPITAL, WANVADI .................................................................................. 32

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 32

    Photographs .............................................................................................................................. 35

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 35

    9. SUTAR HOSPITAL KOTHRUD ........................................................................................... 35

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 35

    Photographs ................................................................................... Error! Bookmark not defined.

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 38

    10. RAJMATA JIJAU HOSPITAL MITRA MANDAL CHAUK ............................................... 39

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 39

    Photographs .............................................................................................................................. 41

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 41

    11. PMC DISPENSARY JANATA VASAHAT ....................................................................... 41

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 41

    Photographs .............................................................................................................................. 44

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 44

    12. POTE HOSPITAL SAHAKARNAGAR ............................................................................. 45

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 45

    Photographs: Toilet ................................................................................................................... 47

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 48

    13. TAMBE DISPENSARY DHANKAWADI .......................................................................... 48

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 48

    Photographs ................................................................................... Error! Bookmark not defined.

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 51

    14. YUGPURUSH CHHATRAPATI SHIVAJI HOSPITAL BIBAWEVADI ........................... 51

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 51

    Photographs .............................................................................................................................. 54

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 54

    15. SONVANE HOSPITAL, BHAWANI PETH ...................................................................... 55

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 55

    Photographs .............................................................................................................................. 56

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 57

    16. KAMALA NEHARU HOSPITAL, MALGALWAR PETH .................................................. 57

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 57

  • Photographs .............................................................................................................................. 60

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 60

    17. DALAVI HOSPITAL, SHIVAJINAGAR ............................................................................ 60

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 60

    Photographs .............................................................................................................................. 63

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 63

    18. KHEDEKAR HOSPITAL, BOPODI .................................................................................. 64

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 64

    Photographs .............................................................................................................................. 67

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 67

    19. DHANKAWADE HOSPITAL, BALAJINAGAR ................................................................ 68

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 68

    Photographs .............................................................................................................................. 71

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 71

    20. KODRE HOSPITAL, MUNDHAVA................................................................................... 71

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 71

    Photographs .............................................................................................................................. 74

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 74

    21. RAJIV GANDHI HOSPITAL, YERWADA ........................................................................ 75

    a. Existing Status of Hospital/Wash Infrastructure Gaps ............................................... 75

    Photographs .............................................................................................................................. 78

    b. Proposed Hospital Infrastructure Renovation Action Plan ......................................... 78

  • Abbreviations

    1. BMWM- Bio Medical Waste Management

    2. CYDA- Centre For Youth Development and activities

    3. FSM- Faecal Sludge Management

    4. GF- Ground Floor

    5. HDPE- High Density Poly Ethylene

    6. HWS- Hand Wash Station

    7. MO- Medical officer

    8. OPD- Out Patient Department

    9. OT- Operation Theatre

    10. PMC- Pune Municipal corporation

    11. POU- Point of Utilization

    12. PWD- Public Work Department

    13. PWSS-Piped water supply scheme

    14. RCC- Reinforced Cement Concrete

    15. RO/UV- Reverse Osmosis, Ultraviolet

    16. UNICEF- United Nations Children's Fund

    17. WASH- Water Sanitation and Hygiene

  • Background

    CYDA in collaboration with UNICEF is planning to implement “Improved WASH Access in

    19 health facilities and 50 community toilets in slums under the Pune Municipal Corporation

    areas” project. It is related to Bio Medical waste and Water, Sanitation and Hygiene in Hospital

    and 11 Hospitals, 8 dispensaries and 50 selected community toilets in PMC area. We have

    list of 11 hospital and 8 dispensaries for assessment of BMW and WASH in Health Facilities

    in 11 hospitals & 8 dispensaries under PMC. The project will look into the gender perspectives

    to ensure access and use of WASH facilities in the community and health facilities. Children,

    adolescents and women are most affected among all during this situation. The project will be

    implemented in the Government Facilities targeting patients irrespective of class, gender and

    age disaggregation, etc. The access to these facilities is free or with very nominal fees as

    these is run by the PMC – Urban Local Body. These hospitals and dispensaries are spread

    across the city and already focus on equity and access. An effort will also be made to sensitize

    the staff of the hcfs on gender equity and access through interactions, orientation and bringing

    in the elements in the sops and checklists.

    1. THE OBJECTIVES OF THE PROGRAM

    A. To understand gaps in the existing WASH Infrastructure among the selected

    hospitals and dispensaries.

    B. To prepare action plan as per the gaps

    C. To prepare an implementation plan to immediate support to improve the identified

    gaps.

    2. LOCATION OF THE HOSPITALS

    Sr. No.

    Name of the Hospital Location

    1 Minatai Thakare Hospital Kondhava

    2 Amrale Dispensary Shivajinagar

    3 Chhatrapati Shivray Hospital Nagpur Chal

    4 Laygude Hospital Dhayari

    5 Minatai Thakare Polyclinic Vadgaon Sheri

    6 Pmc Dispensary Kharadi

    7 Pmc Dispensary Santosh Nagar Katraj

    8 Shivarkar Hospital Wanvadi

    9 Sutar Hospital Kothrud

    10 Tambe Dispensary Dhankavadi

    11 Pote Dispensaryl Sahakarnagar (Padmavati Chauk)

    12 Yugpurush Raja Shivaji Dispensary Bibvewadi

    13 Pmc Dispensary Janata Vasahat (Parvati Paytha)

  • 3. PROCESS OF ASSESSMENT

    Introductory meeting with MO, Nurses in charge and non-medical staff

    Giving brief information about the project to the staff and finding out the existing gaps in

    the areas of WASH and BMWM.

    Transact walk with staff for the detailed assessment of WASH infrastructures and BMWM

    system.

    Finding out the gaps between WASH facilities by visiting each WASH infrastructure.

    Preparation of detailed estimate for the work which have to be done under project.

    Sharing the findings with the Medical Officer as well as others to finalise the plan

    1. MINATAI THAKARE HOSPITAL KONDHAVA

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is Drinking water purification process the RO/UV purifier is provided with cooler.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand sanitizer at the entrance of hospital.

    14 Bharatratna Rajeev Gandhi Hospital Yerwada

    15 Dalavi Hospital Shivajinagar

    16 Khedekar Hospital Bopodi

    17 Kamala Neharu Hospital Mangalwar Peth

    18 Dhankawade Hospital Balajinagar

    19 Kodre Hospital Mundhava

    20 Sonavane Hospital Bhawani Peth

    21 Rajmata Jijau Hospital Mitra Mandal Chauk

  • Status of WASH facilities:

    S. No Current Status of Infrastructure Adequacy Gaps Scope of Work

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2

    Water Storage for Drinking Water

    0 0 0 0 0 -

    3

    Water Storage for Other purpose

    5000 L 50000 L

    5000 L 50000 L

    0 L 0 0 -

    4

    Drinking Water Station

    1 1 0 0 1 Tap replacing

    5 Hand washing basins

    10 10 0 3 3

    Fixing of 2 new basins, fixing of foot operated HWS. Pillar cock, angle

    cock, waste pipe

    6 Sanitizer stand

    0 0 0 1 0 New sanitizer stand fixing

    7 Gents Toilets in Hospital

    0 0 0 0 0 -

    8 Ladies Toilet in Hospital 9 9 0 0 5

    Flushing cistern replacing, chock

    up removing

    9 PWD toilet

    0 0 0 0 1 New

    construction

  • Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3 Drinking water PWSS OK - - -

    Water filter with cooler

    Defunct Tap replacing 1 500

    4 Hand wash basin

    10 basins at different locations

    OK Tap to be changed with elbow operated tap

    8 9600

    Pantry room Defunct Bib cock replacing 1 700

    Near toilet NA New 2 4000

    Pillar cock NA New 2 1600

    Angle cock NA New 2 1200

    Plumbing with all fitting

    NA 1 3158

    5 Toilet

    9 toilet at different locations

    Defunct Chock up removal 4 500

    GF Common toilet

    Defunct Flush tank replacing, angle cock replacing

    1 2100

  • 6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 2772

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total 33349

    7 Additional Hand wash liquid 5ltr can + 500 2 bottle 1 700

    34049

    2. AMARALE HOSPITAL SHIVAJINAGAR

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and ground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also no any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand sanitizer at the entrance of hospital.

  • Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1

    Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    5000 L 3000 L 3000 L

    5000 L 3000 L 3000 L

    0 L 0 0 -

    4 Drinking Water Station

    0 0 1 1 0

    New POU with 2 taps connected to UV purification is required

    5

    Hand washing basins

    2 2 0 1 1

    New Hand wash unit with hand free operation. Need to replace 2 elbow operated tap for wash basin.

    6 Doctors Toilets in Hospital

    1 1 - 0 - Tap Change

    7 Common Toilet in Hospital

    1 1 0 0 1 -

    8 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3 Drinking water PWSS OK - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 2 basins at different locations

    OK

    Tap to be changed with elbow operated tap

    2 2400

    5 Toilet Bib cock

    Defunct

    New 1 700

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 2795

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total 23114

    7

    Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Total 23814

    3. CHHTRAPATI SHIVRAY HOSPITAL, NAGPUR CHAL

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also no any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

  • The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand washing or sanitizing system at the entrance of hospital.

    Status of WASH facilities:

    Current Status of Infrastructure Scope of Work

    S. No

    Available Functional Dysfunctional Restoration work details

    1 Water Source 1 1 0 -

    2

    Water Storage for Drinking Water 0L 0 0L New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    3000 L 1500 L

    3000 L 1500 L

    0 L -

    4 Drinking Water Station

    0 0 1 New POU with 2 taps connected to UV purification is required

    5

    Hand washing basins 8 6 2

    New Hand wash unit with hand free operation, Tap and waste pipe replacement.

    6 Toilets in Hospital

    4 2 2 Tap replacing, Door latches repair

    7 PWD toilet 0 0 0 New Construction

  • Current situation of WASH infrastructure:

    Photographs

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3 Drinking water PWSS OK - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 8 basins at different locations

    OK Tap to be changed with elbow operated tap

    4 4800

    Basin at first floor Defunct Pillar cock replacing 2 1600

    Basin in sisters room

    Defunct Waste pipe replacing

    1 100

    5 Toilet Bib cock Defunct Replacing bib cock 2 1400

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 15070

    Hand wash liquid New 1 300

    Painting New 1 119

    Total 38189

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Total 38889

    4. LAYGUDE HOSPITAL DHAYARI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE, RCC water tank and underground water tank.

  • There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    There was found an free hand foot operated HWS for the safety from COVID-19

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    2000L 2000L 0L 0 0

    -

    3 Water Storage for Other purpose

    100000L 2000L

    50000L

    100000L 2000L

    50000L 0L 0 0 -

    4 Drinking Water Station

    3 3 - 3 0

    New water filter with UV purification is required

    5 Toilet + Bath 13 12 1 0 0 -

    6 Hand washing basins

    44 44 0 0 4 New 4 elbow operated tap

    7 Bath 11 11 0 0 0 -

  • 8 Gents Urinal 3 3 0 0 0 -

    9 Toilet in Hospital

    30 30 0 0 1 Tap replacement

    10 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

    .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3 Drinking water PWSS OK - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 44 basins at different locations

    OK

    Tap to be changed with elbow operated tap

    4 4800

    5 Toilet Bib cock Defunct

    Replacing bib cock

    1 700

    6 Hand free hand wash basin

    Hand wash liquid Defunct Liquid bottle 1 300

    Total 15800

  • 7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Pedal operated HWS New 1 5000

    Water filter NA

    New UV process water filter

    2 20000

    Sanitizer stand New 1 2000

    Total 43500

    5. MINATAI THAKARE POLYCLINIC VADGAON SHERI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand washing or sanitizing system at the entrance of hospital.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Availa

    ble Function

    al Dysfunctiona

    l

    New Infrastructur

    e

    Restoration

    Restoration work details

    1 Water Source 2 2 0 0 1 -

  • 2 Water Storage for Drinking Water

    0L 0 0L 1 0 New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    22k L 22k L 0 L 1 0 -

    4 Drinking Water Station

    0 0 1 1 0 New water filter with UV purification is required

    5 Hand washing basins

    7 7 0 1 0 New Hand wash unit with hand free operation.

    6 Gents Toilets in Hospital

    0 - - 0 - -

    7 Ladies Toilet in Hospital

    3 3 0 0 1 Flush tank replacing

    1

    8 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

    .

  • Photographs

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3

    Drinking water PWSS OK - - -

    Water filter NA

    New UV process water filter

    1 10000

    4 Hand wash basin

    7 basins at different locations

    OK Tap to be changed with elbow operated tap

    6 7200

    Basin at first floor Defunct

    Waste pipe replacing

    1 150

    Basin at outer wall near OPD case paper row

    Defunct Waste pipe replacing

    1 150

    5 Toilet Toilet at first floor Defunct

    Angle cock replacing

    1 600

    Toilet at first floor Defunct Flush tank replacing 1 1500

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 2 9000

    Plumbing with all fitting

    NA New 1 3452

    Painting New 1 237

    Total 32589

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 1 2000

    Total 35289

    6. PMC HOSPITAL KHARADI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

  • There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is provision of foot operated hand washing unit at the entrance of hospital.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available

    Functional

    Dysfunctional

    New Infrastructur

    e

    Restoration

    Restoration work details

    1 Water Source 1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0L 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    500 L 300L

    500L 300L

    0 L 0 0 -

    4 Drinking Water Station

    0 0 1 1 0

    New POU with 2 taps connected to UV purification is required

    5 Hand washing basins

    4 4 0 0 1 Soap dispenser missing

    6 Toilet in Hospital

    1 1 0 0 1 Floor tiles

    7 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

    .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage Overhead Ok - - -

    3 Drinking water PWSS Ok - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 4 basins at different locations

    Ok Tap to be changed with elbow operated tap

    3 3600

    Near wash area at ground level

    Defunct 4" strainer 1 100

    5 Toilet Common toilet Defunct Chock up removal 1 500

    Ground level Defunct Floor tiles 1 1541

    6 Hand free hand wash basin

    Hand wash liquid Defunct Liquid bottle 1 300

    Total 16041

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 1 2000

    Total 18741

  • 7. PMC HOSPITAL KATRAJ

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet block is good in condition and there is no need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand washing or sanitizing system at the entrance of hospital.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    3000 L 3000 L 0 1 0 -

  • 4 Drinking Water Station

    0 0 0 1 0

    New water filter with UV purification is required

    5 Hand washing basins

    6 7 0 1 0 New Hand wash unit with hand free operation.

    6 Gents Toilets in Hospital

    2 2 0 0 - Pipeline leakage prpblem of inlet

    supply

    7 Ladies Toilet in Hospital

    2 2 0 0 0 -

    8 Gents Urinal 2 2 0 0 0 -

    9 Ladies Urinal

    2 2 0 0 0 -

    10 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    3000 L 3000 L 0 1 0 -

    4 Drinking Water Station

    0 0 0 1 0 New water filter with UV purification is required

  • 5 Hand washing basins

    6 7 0 1 0 New Hand wash unit with hand free operation.

    6 Gents Toilets in Hospital

    2 2 0 0 - Pipeline leakage prpblem of inlet

    supply

    7 Ladies Toilet in Hospital

    2 2 0 0 0 -

    8 Gents Urinal 2 2 0 0 0 -

    9 Ladies Urinal

    2 2 0 0 0 -

    10 PWD toilet 0 0 0 1 0 New Construction

    8. SHIVARKAR HOSPITAL, WANVADI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand washing or sanitizing system at the entrance of hospital.

  • Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    2 2 0 0 1 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    4000L 4000 L L 0 0 -

    4 Drinking Water Station

    1 0 1 1 0

    New water filter with UV purification is required

    5 Hand washing basins

    7 5 2 1 0

    New Hand wash unit with hand free operation, Tap replacement, Pipeline work

    6 Toilets in Hospital

    5 4 1 0 - -

    7 Bathroom In Hospital

    2 2 0 0 0 -

    8 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    OK - - -

    3 Drinking water PWSS OK - - -

    Water filter NA

    New UV process water filter

    1 10000

    4 Hand wash basin

    7 basins at different locations

    OK Tap changed with elbow operated tap

    2 2400

    Basin in Injection room

    Defunct Pillar cock 1 800

    Basin in dressing room

    Defunct Pillar cock 1 800

    5 Toilet Bib cock Defunct Replacing bib cock 1 700

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 9290

    Hand wash liquid NA New 1 300

    Painting NA New 1 119

    Total 29209

    9. SUTAR HOSPITAL KOTHRUD

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet block is average in condition and there is need of retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

  • There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    There is no any provision for hand washing or sanitizing system at the entrance of hospital.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    100000L 100000 L 0L 1 0 -

    4 Drinking Water Station

    1 1 0 1 0

    Need of UV process water filter.

    5 Hand washing basins

    26 20 6 1 0

    New Hand wash unit with hand free operation, Tap replacement

    6 Toilets in Hospital

    14 12 2 0 2 Replacing of flush tank

    7 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    Ok - - -

    3 Drinking water PWSS Ok - - -

    Water filter NA

    New UV process water filter

    1 10000

    4 Hand wash basin

    26 basins at different locations

    Ok Tap to be changed with elbow operated tap

    14 16800

    Basin at 2nd floor in patient toilet block

    Defunct Pillar cock replacing 2 1600

    Basin in Lab Defunct

    Waste pipe replacing

    1 100

    5 Toilet 2nd floor patient toilet Defunct Replacing flush tank 1 1500

    2nd floor patient toilet Defunct

    Angle cock replacing

    1 600

    Staff toilet near laboratory Defunct Replacing flush tank 1 1500

    Staff toilet near laboratory Defunct

    Angle cock replacing

    1 600

    6 Hand free hand wash basin

    Clearance and cleaning 1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting NA New 1 5959

    Hand wash liquid New 1 300

    Painting New 1 119

    Total 43878

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 1 2000

    Total 46578

  • 10. RAJMATA JIJAU HOSPITAL MITRA MANDAL CHAUK

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are quite good in condition and there is no need of any retrofitting

    and renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S, No

    Available

    Functional

    Dysfunctional

    New Infrastructur

    e

    Restoration

    Restoration work details

    1 Water Source 1 1 0 0 1 -

    2 Water Storage for Drinking Water

    50L 50L 0 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    50k L +10000

    0L 22k L 0 L 1 0 -

    4 Drinking Water Station

    2 2 0 2 0 New water filter with UV purification is required

    5 Hand washing basins

    12 12 0 0 0 -

  • 6 Common Toilets in Hospital

    11 11 - 0 - -

    7 Staff Toilet in Hospital

    5 5 0 0 0 -

    8 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    Estimated cost

    1 Water filter 2 10000 20000

    2 Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Total 20700

    11. PMC DISPENSARY JANATA VASAHAT

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank only.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

  • The existing toilet blocks are average in condition and there is no need of any retrofitting

    and renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    25L 25L 0 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    600 L 600 L 0 L 1 0 -

    4 Drinking Water Station

    0 0 0 1 0

    New water filter connected to UV purification is required

    5 Hand washing basins

    4 4 0 1 0 New Hand wash unit with hand free operation.

    6 Gents Toilets in Hospital

    1 1 0 0 0 -

    7 Ladies Toilet in Hospital

    2 2 0 0 0 -

    8 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

    .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2

    Water storage Overhead OK New tank with

    fabricated base 500 litre 15000

    3

    Drinking water PWSS Ok - - -

    Water filter NA New UV process water filter

    1 10000

    4

    Hand wash basin 2 basins at different locations

    OK

    Tap to be changed with elbow operated tap

    4 4800

    5

    Toilet Common toilet OK - - -

  • 6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 11572

    Hand wash liquid New 1 300

    Painting New 1 119

    Total 46591

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Total 47291

    12. POTE HOSPITAL SAHAKARNAGAR

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are bad in condition and there is no need of any retrofitting and

    renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for

    0L 0 0L 0 0 -

  • Drinking Water

    3 Water Storage for Other purpose

    4000 L 4000 L 0 L 0 0 -

    4 Drinking Water Station

    0 0 0 1 0

    New water filter with UV purification is required

    5 Hand washing basins

    10 10 0 1 0 New Hand wash unit with hand free operation.

    6 Toilets in Hospital

    5 4 1 0 1 Pipe Chocked up repair

    7 Bathroom in Hospital

    2 2 0 0 0 -

    8 Common Bath+ Toilet

    1 1 0 0 0 -

    9 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs: Toilet

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    Ok - - -

    3 Drinking water PWSS Ok - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 10 basins at different locations

    Ok Tap to be changed with elbow operated tap

    10 12000

    5 Toilet

    Toilet near waiting area at first floor

    Defunct Chock up removal 1 1000

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    New 1 10892

    Hand wash liquid New 1 300

    Painting New 1 119

    Total 39111

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 1 2000

    Total 41811

    13. TAMBE DISPENSARY DHANKAWADI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are quite good in condition and there is no need of any retrofitting

    and renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

  • There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    New Drinking water storage tank with tank base.

    3 Water Storage for Other purpose

    5000 L 5000 L 0 L 1 0 -

    4 Drinking Water Station

    0 0 0 1 0

    New POU for drinking with UV purification is required

    5 Hand washing basins

    4 4 0 2 0 New Hand wash unit with hand free operation.

    6 Toilets in Hospital

    2 2 0 0 - -

    7 Ladies Toilet in Hospital

    0 0 0 0 0 -

    8 PWD toilet

    0 0 0 1 0 New Construction

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage Overhead Ok - - -

    3 Drinking water PWSS Ok - - -

    Water filter NA

    New UV process water filter

    1 10000

    4

    Hand wash basin 4 basins at different locations

    Ok Tap to be changed with elbow operated tap

    3 3600

    5

    Toilet Common OK - - -

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 11065

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total 31884

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Fabricated stand New 1 5000

    Sanitizer stand New 1 2000

    Total 39584

    14. YUGPURUSH CHHATRAPATI SHIVAJI HOSPITAL BIBAWEVADI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is no any provision for Drinking water purification process, only cooler is fitted no

    any UV process. The water from corporation is used for drinking purpose, also any

    separate storage for drinking water.

  • The existing toilet blocks are average in condition and there is no need of any retrofitting

    and renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0 New Drinking

    water storage tank with tank base.

    3 Water Storage for Other purpose

    20k L 20k L 0 L 0 1 New R.C.C Cover

    (2 ftx2 Ft)

    4 Drinking Water Station

    2 1 1 0 1 Repair of one drinking water

    station required.

    5 Hand washing basins

    2 2 0 1 0 New Hand wash unit with hand free operation.

    6 Gents urinal in Hospital

    2 2 0 0 0 -

    7 Gents Toilet in Hospital

    0 0 0 0 0 -

    8 Ladies Toilet in Hospital

    2 2 0 0 0 -

    9 Staff toilet 1 1 0 0 0

  • 10 Common toilet

    2 2 0 0 0

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage

    Overhead and underground

    Defunct RCC cover 1 800

    3 Drinking water PWSS OK - - -

    Water filter with cooler Defunct

    Repair and maintenance

    1 1000

    4 Hand wash basin

    2 basins at different locations

    OK Tap to be changed with elbow operated tap

    2 2400

    5 Toilet Common OK - - -

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting NA New 1 2553

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total 13972

  • 7 Additional Hand wash liquid 5ltr can + 500 2 bottle 1 700

    Sanitizer stand New 1 2000

    Total 16672

    15. SONVANE HOSPITAL, BHAWANI PETH

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are average in condition and there is no need of any retrofitting

    and renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source 1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3 Water Storage for Other purpose

    70k L 70k L 0 L 0 0 -

  • 4 Drinking Water Station

    2 1 1 0 1

    New Drinking UV process filter

    required

    5 Hand washing basins

    2 2 0 1 2

    New Hand wash unit with hand free operation. Connection pipe, waste pipe.

    6 Gents urinal in Hospital

    2 2 0 0 0 -

    7 Gents Toilet in Hospital

    0 0 0 0 0 -

    8 Ladies Toilet in Hospital

    2 2 0 0 0 -

    9 Staff toilet 1 1 0 0 0 -

    10 Common toilet

    2 2 0 0 0 -

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

    Photographs

  • b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Elbow tap 8 1200 9600

    Connection pipe 1 200 200

    Waste pipe 2 100 200

    Pedal HWS 2 5000 10000

    water filter 2 10000 20000

    Handwash liquid 5ltr can + 500 2

    bottle 1 700

    Santizer stand 2 2000 4000

    TOTAL 44700

    16. KAMALA NEHARU HOSPITAL, MALGALWAR PETH

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are very bad in condition and there is need of any retrofitting and

    renovation work. Some toilets are filled with materials. There is no separate toilet in the

    Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

  • For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source 1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0 -

    3 Water Storage for Other purpose

    90k L 90k L 0 L 0 0 -

    4 Drinking Water Station

    0 0 0 3 0 New UV operated

    water filter.

    5 Hand washing basins

    64 64 0 3 10

    New Hand wash unit with hand free operation. Pillar cock, waste pipe, Basin

    6 Gents urinal in Hospital

    9 9 0 0 0 -

    7 Gents Toilet in Hospital

    8 5 3 0 3 Chocked up, bib cock

    8 Ladies Toilet in Hospital

    33 25 8 0 8 Chocked up, material stored, flush tank

    9 PWD toilet 0 0 0 1 0 New Construction

  • Current situation of WASH infrastructure:

    .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    1 Elbow tap 37 1200 44400

    2 Bib cock 5 700 3500

    3 Pillar 2 800 1600

    4 Waste pipe 10 100 1000

    5 Flush tank 5 1500 7500

    6 Pedal HWS 4 5000 20000

    7 Water filter 3 10000 30000

    8 Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    9 Sanitizer stand 3 2000 6000

    Total 114700

    17. DALAVI HOSPITAL, SHIVAJINAGAR

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and ground water tank.

  • There is provision for Drinking water purification process.

    The existing toilet blocks are average in condition and there is need of any retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source 1 1 0 0 0 -

    2

    Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3

    Water Storage for Other purpose

    70k L 70k L 0 L 0 0 -

    4

    Drinking Water Station

    1 1 0 0 0

    -

    5 Hand washing basins

    49 49 0 2 4

    New Hand wash unit with hand free operation. Waste pipe, connection pipe

    6 Gents urinal in Hospital

    0 0 0 0 0 -

    7 Gents Toilet in Hospital

    2 2 0 0 0 -

    8 Ladies Toilet in Hospital

    2 2 0 0 0 -

  • 9 Staff toilet 7 7 0 0 0

    10 Common toilet

    21 21 0 0 5 Seat cover, bib cock, jet spray

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage Overhead OK - - -

    3 Drinking water Water filter OK - - -

    4 Hand wash basin

    49 basins at different locations

    OK Tap to be changed with elbow operated tap

    7 8400

    2nd floor Basin inside Disha staff room

    Defunct Connection pipe 1 200

    2nd floor common area

    Dysfunctional

    Total restoration- pillar cock, connection pipe, waste pipe

    1 1100

    2nd floor inside ward

    Dysfunctional

    Total restoration- pillar cock, connection pipe, waste pipe

    1 1100

    2nd floor basin in injection room

    NA New basin fixing with all fittings

    1 2000

    2nd floor basin in injection room

    NA Pillar cock with connection pipe

    1 900

    5 Toilet

    2nd floor inside Disha staff room

    Defunct Seat cover, flush tank 1 2000

    2nd floor common area

    Defunct Seat cover 1 500

  • Ground floor inside bath

    Defunct Bib cock 1 700

    Ground floor inside OPD

    Defunct Jet spray 1 1000

    Ground floor inside gents toilet

    Defunct Seat cover 1 500

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting

    NA New 1 4449

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total

    30068

    7 Additional Hand wash liquid 5ltr can + 500 2 bottle 1 700

    Sanitizer stand New 2 4000

    Total

    34768

    18. KHEDEKAR HOSPITAL, BOPODI

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead HDPE water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are average in condition and there is need of any retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

  • Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source 1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3 Water Storage for Other purpose

    60k L 60k L 0 L 0 0 -

    4 Drinking Water Station

    0 0 0 3 0

    Water filter with UV process at each

    floor

    5 Hand washing basins

    43 41 2 1 3

    New Hand wash unit with hand free operation. Waste pipe, connection pipe, pillar cock

    6 Gents urinal in Hospital

    2 2 0 0 0 -

    7 Gents Toilet in Hospital

    0 0 0 0 0 -

    8 Ladies Toilet in Hospital

    2 2 0 0 0 -

    9 Staff toilet 1 1 0 0 0

    10 Common toilet

    2 2 0 1 0 Replacing flush tan, angle cock

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    KHEDEKAR HOSPITAL BOPODI

    S. No

    Infrastructure Descriptio

    n Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage Overhead OK - - -

    3 Drinking water PWSS Ok - - -

    Water filter for each floor

    NA New UV process water filter

    3 30000

    4

    Hand wash basin 43 basins at different locations

    OK Tap to be changed with elbow operated tap

    7 8400

    2nd floor Basin inside Disha staff room

    Defunct Replacing pillar cock 1 800

    3nd floor common area

    Dysfunctional

    Total restoration- pillar cock, connection pipe, waste pipe

    1 2000

    Ground floor pantry room

    Dysfunctional

    Chocked up 1 500

  • 5 Toilet

    3rd floor common toilet

    Defunct Replacing flush tank with angle cock

    1 2100

    6 Hand free hand wash basin

    Clearance and cleaning

    1 300

    Fabricated stand

    NA New 1 4500

    Plumbing with all fitting

    NA New 1 5786

    Hand wash liquid

    New 1 300

    Painting New 1 119

    Sanitizer stand

    New 1 2000

    Total 56805

    7 Additional

    Hand wash liquid

    5ltr can + 500 2 bottle 1 700

    Hand wash stand

    New 1 5000

    Total 62505

    19. DHANKAWADE HOSPITAL, BALAJINAGAR

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is provision for Drinking water purification process, still need one more water filter

    at first floor.

    The existing toilet blocks are good in condition and there is no need of any retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

  • Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3 Water Storage for Other purpose

    50k L 50k L 0 L 0 0 -

    4 Drinking Water Station

    0 0 0 1 0

    New UV process water filter

    5 Hand washing basins

    14 14 0 2 1

    New Hand wash unit with hand free operation. Waste pipe

    6 Gents urinal in Hospital

    2 2 0 0 0 -

    7 Gents Toilet in Hospital

    2 2 0 0 0 -

    8 Ladies Toilet in Hospital

    2 2 0 0 0 -

    9 Common toilet

    4 4 0 0 0

    10 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    1 Waste pipe 1 100 100

    2 Pedal HWS 2 5000 10000

    3 Water filter 1 10000 10000

    4 Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    5 Sanitizer stand 2 2000 4000

    Total 24800

    20. KODRE HOSPITAL, MUNDHAVA

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC, HDPE water tank and underground water tank.

    There is provision for Drinking water purification process but currently that was under

    maintenance, so need to servicing and new filter for OPD.

  • The existing toilet blocks are average in condition and there is need of any retrofitting and

    renovation work. There is no separate toilet in the Hospital for person with special

    needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

    Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3 Water Storage for Other purpose

    20k L 20k L 0 L 0 1 -

    4 Drinking Water Station

    2 0 2 1 2

    New UV process water filter.

    Servicing of old units.

    5 Hand washing basins

    10 10 0 1 0 New Hand wash unit with hand free operation.

    6 Gents urinal in Hospital

    0 0 0 0 0 -

    7 Gents Toilet in Hospital

    1 1 0 0 0 -

    8 Ladies Toilet in Hospital

    1 1 0 0 0 -

    9 Staff toilet 3 3 0 0 3 Flush tank, angle cock

  • 10 Common toilet

    3 3 0 0 3 Strainer, flush tank

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

    .

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    Infrastructure Description Status Need Nos Cost

    1 Water source PWSS OK - - -

    2 Water storage Overhead OK - - -

    3 Drinking water PWSS Ok - - -

    Water filter for OPD NA

    New UV process water filter

    1 10000

    Water filter Defunct Servicing 2 4000

    4 Hand wash basin 10 basins at different locations

    OK

    Tap to be changed with elbow operated tap

    9 10800

    1st floor 3tap HWS in OT Defunct

    Waste pipe replacing

    1 150

    1st floor 3tap HWS in OT NA

    Wall mounted dispenser stand

    1 300

    5 Toilet Ground floor at entrance ladies toilet

    Defunct 4" strainer 2 200

    Ground floor at entrance gents toilet

    Defunct Flush tank replacing

    1 1500

    Ground floor at entrance gents toilet

    Defunct Angle cock replacing

    1 600

    2nd floor in ward Defunct

    Flush tank replacing

    1 1500

  • 2nd floor in ward Defunct

    Angle cock replacing

    1 600

    2nd floor in ward patient toilet

    Defunct Flush tank replacing

    2 3000

    2nd floor in ward patient toilet

    Defunct Angle cock replacing

    2 1200

    6 Hand free hand wash basin

    Clearance and cleaning 1 300

    Fabricated stand NA New 1 4500

    Plumbing with all fitting NA New 1 4910

    Hand wash liquid New 1 300

    Painting New 1 119

    Sanitizer stand New 1 2000

    Total 45979

    7 Additional Hand wash liquid

    5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 1 2000

    Total 48679

    21. RAJIV GANDHI HOSPITAL, YERWADA

    a. Existing Status of Hospital/Wash Infrastructure Gaps

    PWSS is the main source of water. No any other source of water for drinking as well as

    other purpose

    Water is stored in overhead RCC water tank and underground water tank.

    There is no any provision for Drinking water purification process. The water from

    corporation is used for drinking purpose, also any separate storage for drinking water.

    The existing toilet blocks are very bad in condition and there is need of any retrofitting and

    renovation work.

    There is no separate toilet in the Hospital for person with special needs.(PWD)

    The FSM is done by connecting soil pipe to corporation drainage line.

    There are several hand wash basins in the hospitals and it requires the renovation such

    as broken tap replacing, waste water management.

    For BMWM there is segregation of waste and all record keep maintained.

    Status of WASH facilities:

  • Current Status of Infrastructure Adequacy Gaps Scope of Work

    S. No

    Available Functional Dysfunctional New Infrastructure

    Restoration Restoration work details

    1 Water Source

    1 1 0 0 0 -

    2 Water Storage for Drinking Water

    0L 0 0L 1 0

    -

    3 Water Storage for Other purpose

    80k L 80k L 0 L 0 1 -

    4 Drinking Water Station

    0 0 0 2 0

    New UV process water filter required.

    5

    Hand washing basins

    21 21 0 4 13

    New Hand wash unit with hand free operation. Waste pipe, connection pipe, pillar cock, chock up removing.

    6 Gents urinal in Hospital

    2 2 0 0 2 Total restoration required

    7 Gents Toilet in Hospital

    0 0 0 0 0 -

    8 Ladies Toilet in Hospital

    0 0 0 0 0 -

    9 Staff toilet 3 3 0 0 1 Ventilation window

    10 Common toilet

    11 5 6 0 6 Chocked up, tap broken, ventilation window broken

    11 PWD toilet 0 0 0 1 0 New Construction

    Current situation of WASH infrastructure:

  • Photographs

    b. Proposed Hospital Infrastructure Renovation Action Plan

    ESTIMATED COST

    S. No

    Infrastructure

    Description Status Need Nos Cost

    1 Water source

    PWSS OK - - -

    2 Water storage

    Overhead OK - - -

    3 Drinking water

    PWSS Ok - - -

    4 Hand wash basin

    21 basins at different locations

    OK

    14 Tap to be changed with elbow operated tap

    14 16800

    Ground floor basin Defunct

    Replacing waste pipe

    1 150

    Ground floor basin inside bath Defunct

    Replacing waste pipe

    1 150

    Ground floor sink basin inside ward

    Defunct Replacing bib cock

    1 800

    Ground floor basin inside ward Defunct

    Chock up removal

    1 300

    Ground floor basin near ward Defunct

    Pillar cock with connection pipe

    1 900

  • 1st floor basin in injection room

    Defunct Chock up removal

    1 500

    1st floor basin in injection room

    NA New basin fixing with all fittings

    1 2000

    1st floor basin in injection room

    NA Pillar cock with connection pipe

    1 900

    1st floor basin in ARB Room Defunct

    Chock up removal

    1 500

    1st floor basin in ARB Room NA

    New basin fixing with all fittings

    1 2000

    1st floor basin in ARB Room NA

    Pillar cock with connection pipe

    1 900

    1st floor basin in ARB Room Defunct

    Chock up removal

    1 500

    Basing at Parking

    Dysfunctional

    Total restoration 1 1000

    At entrance Defunct

    Replacing foot press tap

    1 1000

    5 Toilet Ground floor inside ward Defunct

    Replacing bib cock

    1 700

    Ground floor near ward Defunct

    Fixing ventilation window

    1 2000

    Dr Room Defunct Seat cover 1 500

    Ground floor inside Pharmacy Defunct

    Fixing ventilation window

    2 4000

    1st floor inside injection room

    Dysfunctional

    Cleaning and chocked removal

    2 2000

    1st floor inside ARB room

    Dysfunctional

    Cleaning and chocked removal

    2 2000

    1st floor inside ARB room Defunct

    Replacing cock (Railway toilet type)

    1 1000

    1st floor inside ward

    Dysfunctional

    Fixing ventilation window

    1 2000

    1st floor inside ward bathroom Defunct 4" strainer 2 200

    Toilet at Parking

    Dysfunctional

    Total restoration 1 2000

    Urinal at Parking

    Dysfunctional

    Total restoration 1 1000

    Total drainage Defunct Total restoration 1 5000

    Total 50800

    6 Additional Water filter 2 20000

    Pedal hand wash unit 3 15000

    Hand wash liquid 5ltr can + 500 2 bottle

    1 700

    Sanitizer stand New 2 4000

    Total 90500

  • Background1. THE OBJECTIVES OF THE PROGRAM2. LOCATION OF THE HOSPITALS3. PROCESS OF ASSESSMENT1. MINATAI THAKARE HOSPITAL KONDHAVAa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    2. AMARALE HOSPITAL SHIVAJINAGARa. Existing Status of Hospital/Wash Infrastructure Gapsb. Proposed Hospital Infrastructure Renovation Action Plan

    3. CHHTRAPATI SHIVRAY HOSPITAL, NAGPUR CHALa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    4. LAYGUDE HOSPITAL DHAYARIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    5. MINATAI THAKARE POLYCLINIC VADGAON SHERIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    6. PMC HOSPITAL KHARADIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    7. PMC HOSPITAL KATRAJa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    8. SHIVARKAR HOSPITAL, WANVADIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    9. SUTAR HOSPITAL KOTHRUDa. Existing Status of Hospital/Wash Infrastructure Gapsb. Proposed Hospital Infrastructure Renovation Action Plan

    10. RAJMATA JIJAU HOSPITAL MITRA MANDAL CHAUKa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    11. PMC DISPENSARY JANATA VASAHATa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    12. POTE HOSPITAL SAHAKARNAGARa. Existing Status of Hospital/Wash Infrastructure GapsPhotographs: Toiletb. Proposed Hospital Infrastructure Renovation Action Plan

    13. TAMBE DISPENSARY DHANKAWADIa. Existing Status of Hospital/Wash Infrastructure Gapsb. Proposed Hospital Infrastructure Renovation Action Plan

    14. YUGPURUSH CHHATRAPATI SHIVAJI HOSPITAL BIBAWEVADIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    15. SONVANE HOSPITAL, BHAWANI PETHa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    16. KAMALA NEHARU HOSPITAL, MALGALWAR PETHa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    17. DALAVI HOSPITAL, SHIVAJINAGARa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    18. KHEDEKAR HOSPITAL, BOPODIa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    19. DHANKAWADE HOSPITAL, BALAJINAGARa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    20. KODRE HOSPITAL, MUNDHAVAa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan

    21. RAJIV GANDHI HOSPITAL, YERWADAa. Existing Status of Hospital/Wash Infrastructure GapsPhotographsb. Proposed Hospital Infrastructure Renovation Action Plan