MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV LEVEL AREA NO. GRID LINE LOCATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING VENTILATION FAN FAN COIL UNIT (FCU) Actual Actual Actual Actual Actual Actual Actual Actual Actual Progress (%) Actual Actual Actual Actual Actual Actual Actual Actual START START START START START START START START START START START START START START START START START LIFT CORE & ESCAPE STAIRCASE 1 1/A Escape staircase S1 2 1/G Escape staircase S2 3 6/G Escape staircase S3 4 5a/D Escape staircase S4 5 1a/B-C Fire/ service lift lobby 6 5a/D Fire/ service lift lobby 7 2/C Hotel lift lobby 8 5/D BASEMENT LIFT CORE 1 01-2/A Hotel store 1,2 4a/C-D Store 3 2 4a-5/C-D Store (service apt.) 3 7/G Carpark store 4 1-2/F-G Staircase lobby PARKING & DRIVEWAY 5 5/C Passage 6 1-7/A-J Car parking 7 1-7/A-J Motor parking 8 4a-E Handicapped parking space 9 1/E Ramp 1 M&E SERVICE ROOM 10 1/C Fan room 11 3a/B Chiller plant room 12 4/B 13 4a/A-B Sump pit 14 5/A Domestic tank 1, 2 (retail) 15 5/A Pump room 1 (retail) 16 5a/B Pump room 2 (hotel) 17 6/B Pump room 3 (service apt.) 18 6/C-D 19 5a-6/D Pump room 5 (hotel) 20 5b-5c/H Pump room 6 (hotel) 21 5b-5c/J 22 5a/A 23 7/A Domestic tank 3 (hotel) 24 7/B 25 5a-6/C Wet riser tank 1, 2 26 6-7/C Hose reel tank 1, 2 27 7/D 28 5b/H Sprinkler pump stage 1 29 7/J-K Sprinkler tank 1, 2 30 2/H 31 01/G OSD, on-site detention tank 32 01/F Rain water harvesting tank LIFT CORE & ESCAPE STAIRCASE 1 1/A Escape staircase S1 2 1/G Escape staircase S2 3 6/G Escape staircase S3 4 5a/D Escape staircase S4 5 1a/B-C Fire/ service lift lobby 6 5a/D Fire/ service lift lobby 7 2/C Hotel lift lobby 8 5/D LEVEL1 1 1a/A Store 2 5a/D Janitor 3 5a/D-E Refuse 4 5a-D Refuse bin 5 4a-5B/D-F Store 1, 2,3,4,5 6 1-H Ramp 1 RETAIL 7 2a-4a/D-L Retail lobby 8 1-6/C-G Passage 1, 2, 3, 4 9 3/M Retail service lift lobby 10 1-7/A-M 11 4a-5b/C-F Retail male & female toilet 12 4/F Glass lift 13 3a/F Escalator 1 1/A Escape staircase S1 2 1/G Escape staircase S2 3 6/G Escape staircase S3 4 5a/D Escape staircase S4 RISER / SHAFT INSTALLATION CABLE TRAY / TRUNKING INSTALLATION CONDUIT AT COLUMN, WALL & SLAB INSTALLATION PANEL INSTALLATION (SUB SWITCHBOARD) SOCKET OUTLET & LIGHT FITTING INSTALLATION ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING DUCTING INSTALLATION - VERTICAL DUCTING INSTALLATION - HORIZONTAL CHILL PIPE INSTALLATION INSTALLATION CONDUIT & WIRING INSTALLATION GRILL & AC UNIT WET RISER PIPE INSTA Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) Progress (%) TYPICAL COMMON AREA - BASEMENT TO LEVEL 36 Service apartment lift lobby Flood retention tank (below) Pump room 4 (service Apt. + retail) Pump room 7 (retail/ carpark) AC make up tank 1, 2 (hotel) Domestic tank 4 (service apt.) Fresh air fanroom (car park) Grease interceptor system (hotel&retail) TYPICAL COMMON AREA - BASEMENT TO LEVEL 36 Service apartment lift lobby M&E AND SERVICE ROOM Retail unit 1,2,3,4,5,6,7,8,9,10 MMON AREA - TO LEVEL 36 E & ESCAPE RCASE

Upload: shahrulnizam

Post on 08-Dec-2015

7 views

Category:

Documents


0 download

DESCRIPTION

Progress Monitoring

TRANSCRIPT

Page 1: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15

PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

BASE

MEN

T

LIFT

CO

RE

1 01-2/A Hotel store 1,2

4a/C-D Store 3

2 4a-5/C-D Store (service apt.)

3 7/G Carpark store

4 1-2/F-G Staircase lobby

PARK

ING

& D

RIVE

WAY 5 5/C Passage

6 1-7/A-J Car parking

7 1-7/A-J Motor parking

8 4a-E Handicapped parking space

9 1/E Ramp 1

M&

E SE

RVIC

E RO

OM

10 1/C Fan room

11 3a/B Chiller plant room

12 4/B Flood retention tank (below)

13 4a/A-B Sump pit

14 5/A Domestic tank 1, 2 (retail)

15 5/A Pump room 1 (retail)

16 5a/B Pump room 2 (hotel)

17 6/B Pump room 3 (service apt.)

18 6/C-D

19 5a-6/D Pump room 5 (hotel)

20 5b-5c/H Pump room 6 (hotel)

21 5b-5c/J Pump room 7 (retail/ carpark)

22 5a/A AC make up tank 1, 2 (hotel)

23 7/A Domestic tank 3 (hotel)

24 7/B Domestic tank 4 (service apt.)

25 5a-6/C Wet riser tank 1, 2

26 6-7/C Hose reel tank 1, 2

27 7/D Fresh air fanroom (car park)

28 5b/H Sprinkler pump stage 1

29 7/J-K Sprinkler tank 1, 2

30 2/H

31 01/G OSD, on-site detention tank

32 01/F Rain water harvesting tank

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L1

M&

E AN

D S

ERVI

CE R

OO

M 1 1a/A Store

2 5a/D Janitor

3 5a/D-E Refuse

4 5a-D Refuse bin

5 4a-5B/D-F Store 1, 2,3,4,5

6 1-H Ramp 1

RETA

IL

7 2a-4a/D-L Retail lobby

8 1-6/C-G Passage 1, 2, 3, 4

9 3/M Retail service lift lobby

10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10

11 4a-5b/C-F Retail male & female toilet

12 4/F Glass lift

13 3a/F Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

RISER / SHAFT INSTALLATION

CABLE TRAY / TRUNKING

INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONLOOPING & MERGERING

PANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION -

VERTICAL

DUCTING INSTALLATION -

HORIZONTALCHILL PIPE

INSTALLATIONINSTALLATION

CONDUIT & WIRINGINSTALLATION GRILL &

AC UNITWET RISER SYSTEM PIPE

INSTALLATIONSPRINKLER SYSTEM PIPE

INSTALLATIONHOSE REEL SYSTEM PIPE

INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

Pump room 4 (service Apt. + retail)

Grease interceptor system (hotel&retail)

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36TY

PICA

L CO

MM

ON

ARE

A - B

ASEM

ENT

TO L

EVEL

36

Page 2: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15

PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START

RISER / SHAFT INSTALLATION

CABLE TRAY / TRUNKING

INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONLOOPING & MERGERING

PANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION -

VERTICAL

DUCTING INSTALLATION -

HORIZONTALCHILL PIPE

INSTALLATIONINSTALLATION

CONDUIT & WIRINGINSTALLATION GRILL &

AC UNITWET RISER SYSTEM PIPE

INSTALLATIONSPRINKLER SYSTEM PIPE

INSTALLATIONHOSE REEL SYSTEM PIPE

INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 2

M&

E &

SER

VICE

RO

OM

(HO

TEL)

1 2/C Hotel lobby

2 3/B-C Reception

3 1/C Receiving area & purchasing

4 2/D Luggage room

5 1a/B LPG Farm 1 (hotel)

6 2/B Loading & Unloading bay

7 2a/B Receiving area & platform

8 1/C-D Bin center 1

9 1/C-D Store

M&

E &

SER

VICE

RO

OM

(SER

VICE

APA

RTM

ENT

& R

ETAI

L)

10 5a/E Retail service lift lobby

11 5/C Letter box

12 5a/C Fire control room (retail, apt.)

13 6/C MDF room

14 6/C-D Bin center 2

15 5a-6/D AWCS cable room

16 5a-6/D-E AWCS

17 5a/E CWSP

18 5a/E Full vacuumload station

19 6/E Loading & Unloading

20 5a/F Consumer HT room

21 5a/G TNB room

22 6/G TNB meter room

23 5b/G-H M&E room

24 5c/H Diesel fuel pump room

25 5b/H Bomba vehicle turning circle

26 5b/J LPG Farm 2 (retail)

CIRC

ULA

TIO

N 27 4a/E-F Passage

28 01/B Ramp 2

29 2a-7/A-C Drop off

RETA

IL

30 2b-4a/C-K Retail lobby

31 01-5c/C-M Retail unit 1,2,3,4,5,6,7

32 5/E Retail male & female toilet

33 3b/E Glass lift

34 3/E Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 3A

& 3

B

1 3/J Retail lift lobby

M&

E SE

RVIC

E RO

OM

2 1a/B M&E room

3 1/C Store

4 4/E Smoke spill fan room

5 4a/E Copper pipes compartment

6 1a/F Smoke spill fresh air pump room

CARP

AKIN

G &

DRI

VEW

AY

7 2b-E Pedestrian walk way

8 1-5a/C-J Passage

9 1-7/B-M Car parking

10 2a/C Handicapped parking space

11 3/E-F Stair from 3A to 3B

12 01-6/C-K Ramp

OTH

ER R

OO

MS 13 2-2a/E-F Car park management office

14 1/H Male prayer room

15 2/H Female prayer room

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6TY

PICA

L CO

MM

ON

ARE

A - B

ASEM

ENT

TO

LEVE

L 36

RETA IL

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

Page 3: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15

PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START

RISER / SHAFT INSTALLATION

CABLE TRAY / TRUNKING

INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONLOOPING & MERGERING

PANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION -

VERTICAL

DUCTING INSTALLATION -

HORIZONTALCHILL PIPE

INSTALLATIONINSTALLATION

CONDUIT & WIRINGINSTALLATION GRILL &

AC UNITWET RISER SYSTEM PIPE

INSTALLATIONSPRINKLER SYSTEM PIPE

INSTALLATIONHOSE REEL SYSTEM PIPE

INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 4A

& 4

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

4 1-5/B-M Passage

5 2/E-F Stair from 4A to 4B

6 01-6/C-K Ramp

7 1-7/B-M Car parking

8 2a/B, 5-C Handicaped parking space

9 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 5A

& 5

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 2/B Genset room (hotel)

4 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

5 1-5/B-M Passage

6 2/E-F Stair to up from 4A to 4B

7 01-6/C-K Ramp

8 1-7/B-M Car parking

9 2a/B, 5-C Handicaped parking space

10 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 6A

& 6

B

1 3/M Retail lift lobby

2 1-2/B-C Store 1, 2

3 4a/D-E Store 3

4 6/G Store 4

5 6/E Management office

M&

E

6 2a/B Main switch board room (hotel)

7 2b/B Transformer room (hotel)

8 5a-6/C Transformer (apartment)

9 6/C

10 5a-6/C-D Switch gear room (apartment)

11 4a/E CW pump room

12 5/E EFF & CW. Tank

13 6/H Transformer room (retail)

14 6/J Main switch boardroom (retail)

15 6/K Genset room (retail)

16 1a/F Fire pump room (hotel)

17 1/F HR tank 1, 2

18 2/F WR tank 1, 2

PARK

ING 19 01-6/C-K Ramp

20 5a/B, 2/K Motocycle parking

21 01-7/B-M Car parking

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

&

SERV

ICE

R.M

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

&

SERV

ICE

ROO

M

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

& S

ERVI

CE

ROO

M

Main switch board room (apartment)

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

Page 4: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15

PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START

RISER / SHAFT INSTALLATION

CABLE TRAY / TRUNKING

INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONLOOPING & MERGERING

PANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION -

VERTICAL

DUCTING INSTALLATION -

HORIZONTALCHILL PIPE

INSTALLATIONINSTALLATION

CONDUIT & WIRINGINSTALLATION GRILL &

AC UNITWET RISER SYSTEM PIPE

INSTALLATIONSPRINKLER SYSTEM PIPE

INSTALLATIONHOSE REEL SYSTEM PIPE

INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

8 5/D Service apartment lift lobby

LEVE

L 7

M&

E AN

D S

TORE

1 7/H AV store

2 5a-6/C Spa store

3 5/D-E Store

4 1/C Bins room

5 1/C-D AWCS

6 6/C-D Staircase pressurization room

CUST

OM

ER (H

OTE

L)

7 3a/C Reception & check-in counter

8 3a/B Business center/ library

9 4/B Social space

10 4a/B Idea room

11 2/E Bakery

12 3/G All day dining

13 3c-3d/M Pantry

14 5/E Pre-function room

15 4c-G Function room 1

16 5b/G Function room 2

17 4a-6/B Treatment 1, 2, 3

18 5a-6/B Couple treatment room

19 6-7/B Zacuzzi

20 6/D Male & female toilet

FRO

NT

OF

HO

USE

(HO

TEL)

21 2-2a/B Gen. cash

22 1a/B Storage

23 2-2a/B Account manager

24 2a/B Director finance

25 3/B GM office

26 5/C Sales & marketing

27 4-4a/c-D Hotel front office

28 4-4a/C Manager 1, 2

29 4-4a/D Luggage room

30 5/D Store

MAI

N K

ITCH

EN

31 5c/E Food preparation

32 1-1a/C Dry store

33 1-1a/C-D Walk-in freezer

34 2/C-D Walk-in chiller

35 1/D Freeze

36 1/D Chiller

37 2/D Pastry store

MAI

N K

ITCH

EN

38 1/D-E Meat prep

39 1/E Vege prep

40 2/E Pastry & bakery

41 2/E Chocolate room

42 1/E-F Cold kitchen

43 1/F RM. Service office

44 1/F Chef office

45 1/F Room service

46 1/F-G Steward store

47 1-1a/F-G Pot & pan washing

48 1/G Dish washing

49 2/F Cooking area

50 5/A-B Balcony

51 4b-7/H-M Deck extension for F&B funtions

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

MEZ

ZAN

INE

M&

E

1 1/C Bin room

2 1/C AWCS

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

LAN

DSC

APE

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

Page 5: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUMUpdate : 09 Sep 15

PODIUM ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV FIRE FIGHTING

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATIONBOX INSTALLATION CABLING INSTALLATION VENTILATION FAN FAN COIL UNIT (FCU)

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START START

RISER / SHAFT INSTALLATION

CABLE TRAY / TRUNKING

INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONLOOPING & MERGERING

PANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION -

VERTICAL

DUCTING INSTALLATION -

HORIZONTALCHILL PIPE

INSTALLATIONINSTALLATION

CONDUIT & WIRINGINSTALLATION GRILL &

AC UNITWET RISER SYSTEM PIPE

INSTALLATIONSPRINKLER SYSTEM PIPE

INSTALLATIONHOSE REEL SYSTEM PIPE

INSTALLATIONFIRE ALARM SYSTEM PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 7

MEZ

ZAN

INE

M&

E

3 2/B Ahu room 1

4 1/G Ahu room 2

5 01/F-G Balancing tank

6 01/G Pump room

7 1a/B-C M&E area

OFF

ICE

(BO

H)

8 1a/B I.T. Store

9 2-2a/B-C I.T. office

10 2b/B Server room

11 3/B Uniform issue

12 6/E Function room storage

13 6/H AV room

14 2/E HK manager

15 2/E-F HR. DIR. Office

16 2/E-F F&B DIR. Office

17 2/F-G Executive chef

18 1/F Working area

19 1/E Training/ meeting room

20 1a/D Corridors

SERV

ICE

AREA

(BO

H)

21 1-1a/C Security & receiving area

22 2/D Flower shop

23 2/D House keeping office

24 1/D Soiled linen room

25 1/D Valet laundry

26 1/D-E Clean linen room

27 1/C-D Trolley bay

28 3a/B Clinic

29 4/B

30 5a/B Team dinning room

31 6/B Kitchen

32 6/B-C Kitchen storage

33 6/C Staff social lounge

34 6/D Male & female prayer room

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

LEVE

L 8

FACI

LITY

11 3a/C Gym

12 3/B Male, female changing room

13 3/F Swimming pool

14 3/J Pantry

15 4d/J Spiral stair

16 2a-4/B-H Deck

17 2a-7/A-D

18 2b-7/B-J Steps

19 2b-7/B-J Ramp

Male & female changing room, toilet

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

Roof top garden for apartment tower

Page 6: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM

PODIUM

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

BASE

MEN

T

LIFT

CO

RE

1 01-2/A Hotel store 1,2

4a/C-D Store 3

2 4a-5/C-D Store (service apt.)

3 7/G Carpark store

4 1-2/F-G Staircase lobby

PARK

ING

& D

RIVE

WAY 5 5/C Passage

6 1-7/A-J Car parking

7 1-7/A-J Motor parking

8 4a-E Handicapped parking space

9 1/E Ramp 1

M&

E SE

RVIC

E RO

OM

10 1/C Fan room

11 3a/B Chiller plant room

12 4/B Flood retention tank (below)

13 4a/A-B Sump pit

14 5/A Domestic tank 1, 2 (retail)

15 5/A Pump room 1 (retail)

16 5a/B Pump room 2 (hotel)

17 6/B Pump room 3 (service apt.)

18 6/C-D

19 5a-6/D Pump room 5 (hotel)

20 5b-5c/H Pump room 6 (hotel)

21 5b-5c/J Pump room 7 (retail/ carpark)

22 5a/A AC make up tank 1, 2 (hotel)

23 7/A Domestic tank 3 (hotel)

24 7/B Domestic tank 4 (service apt.)

25 5a-6/C Wet riser tank 1, 2

26 6-7/C Hose reel tank 1, 2

27 7/D Fresh air fanroom (car park)

28 5b/H Sprinkler pump stage 1

29 7/J-K Sprinkler tank 1, 2

30 2/H

31 01/G OSD, on-site detention tank

32 01/F Rain water harvesting tank

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L1

M&

E AN

D S

ERVI

CE R

OO

M 1 1a/A Store

2 5a/D Janitor

3 5a/D-E Refuse

4 5a-D Refuse bin

5 4a-5B/D-F Store 1, 2,3,4,5

6 1-H Ramp 1

RETA

IL

7 2a-4a/D-L Retail lobby

8 1-6/C-G Passage 1, 2, 3, 4

9 3/M Retail service lift lobby

10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10

11 4a-5b/C-F Retail male & female toilet

12 4/F Glass lift

13 3a/F Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

Pump room 4 (service Apt. + retail)

Grease interceptor system (hotel&retail)

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36TY

PICA

L CO

MM

ON

ARE

A - B

ASEM

ENT

TO L

EVEL

36

FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

AUTOMATED WASTE COLLECTION SYSTEM

(AWCS)

FIREMAN INTERCOM SYSTEM INSTALLATION

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB

& CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

TRANSPORT PIPE & FITTING

MARKING (BY FASTFLOW) & CORING

ON SLAB (BY UMLB)RISER PIPE

INSTALLATIONDISCHARGE PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 7: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM

PODIUM

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 2

M&

E &

SER

VICE

RO

OM

(HO

TEL)

1 2/C Hotel lobby

2 3/B-C Reception

3 1/C Receiving area & purchasing

4 2/D Luggage room

5 1a/B LPG Farm 1 (hotel)

6 2/B Loading & Unloading bay

7 2a/B Receiving area & platform

8 1/C-D Bin center 1

9 1/C-D Store

M&

E &

SER

VICE

RO

OM

(SER

VICE

APA

RTM

ENT

& R

ETAI

L)

10 5a/E Retail service lift lobby

11 5/C Letter box

12 5a/C Fire control room (retail, apt.)

13 6/C MDF room

14 6/C-D Bin center 2

15 5a-6/D AWCS cable room

16 5a-6/D-E AWCS

17 5a/E CWSP

18 5a/E Full vacuumload station

19 6/E Loading & Unloading

20 5a/F Consumer HT room

21 5a/G TNB room

22 6/G TNB meter room

23 5b/G-H M&E room

24 5c/H Diesel fuel pump room

25 5b/H Bomba vehicle turning circle

26 5b/J LPG Farm 2 (retail)

CIRC

ULA

TIO

N 27 4a/E-F Passage

28 01/B Ramp 2

29 2a-7/A-C Drop off

RETA

IL

30 2b-4a/C-K Retail lobby

31 01-5c/C-M Retail unit 1,2,3,4,5,6,7

32 5/E Retail male & female toilet

33 3b/E Glass lift

34 3/E Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 3A

& 3

B

1 3/J Retail lift lobby

M&

E SE

RVIC

E RO

OM

2 1a/B M&E room

3 1/C Store

4 4/E Smoke spill fan room

5 4a/E Copper pipes compartment

6 1a/F Smoke spill fresh air pump room

CARP

AKIN

G &

DRI

VEW

AY

7 2b-E Pedestrian walk way

8 1-5a/C-J Passage

9 1-7/B-M Car parking

10 2a/C Handicapped parking space

11 3/E-F Stair from 3A to 3B

12 01-6/C-K Ramp

OTH

ER R

OO

MS 13 2-2a/E-F Car park management office

14 1/H Male prayer room

15 2/H Female prayer room

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6TY

PICA

L CO

MM

ON

ARE

A - B

ASEM

ENT

TO

LEVE

L 36

RETA IL

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

AUTOMATED WASTE COLLECTION SYSTEM

(AWCS)

FIREMAN INTERCOM SYSTEM INSTALLATION

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB

& CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

TRANSPORT PIPE & FITTING

MARKING (BY FASTFLOW) & CORING

ON SLAB (BY UMLB)RISER PIPE

INSTALLATIONDISCHARGE PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 8: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM

PODIUM

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 4A

& 4

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

4 1-5/B-M Passage

5 2/E-F Stair from 4A to 4B

6 01-6/C-K Ramp

7 1-7/B-M Car parking

8 2a/B, 5-C Handicaped parking space

9 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 5A

& 5

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 2/B Genset room (hotel)

4 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

5 1-5/B-M Passage

6 2/E-F Stair to up from 4A to 4B

7 01-6/C-K Ramp

8 1-7/B-M Car parking

9 2a/B, 5-C Handicaped parking space

10 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 6A

& 6

B

1 3/M Retail lift lobby

2 1-2/B-C Store 1, 2

3 4a/D-E Store 3

4 6/G Store 4

5 6/E Management office

M&

E

6 2a/B Main switch board room (hotel)

7 2b/B Transformer room (hotel)

8 5a-6/C Transformer (apartment)

9 6/C

10 5a-6/C-D Switch gear room (apartment)

11 4a/E CW pump room

12 5/E EFF & CW. Tank

13 6/H Transformer room (retail)

14 6/J Main switch boardroom (retail)

15 6/K Genset room (retail)

16 1a/F Fire pump room (hotel)

17 1/F HR tank 1, 2

18 2/F WR tank 1, 2

PARK

ING 19 01-6/C-K Ramp

20 5a/B, 2/K Motocycle parking

21 01-7/B-M Car parking

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

&

SERV

ICE

R.M

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

&

SERV

ICE

ROO

M

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LE

VEL

36

LIFT

LO

BBY

& S

ERVI

CE

ROO

M

Main switch board room (apartment)

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

AUTOMATED WASTE COLLECTION SYSTEM

(AWCS)

FIREMAN INTERCOM SYSTEM INSTALLATION

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB

& CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

TRANSPORT PIPE & FITTING

MARKING (BY FASTFLOW) & CORING

ON SLAB (BY UMLB)RISER PIPE

INSTALLATIONDISCHARGE PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 9: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM

PODIUM

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

8 5/D Service apartment lift lobby

LEVE

L 7

M&

E AN

D S

TORE

1 7/H AV store

2 5a-6/C Spa store

3 5/D-E Store

4 1/C Bins room

5 1/C-D AWCS

6 6/C-D Staircase pressurization room

CUST

OM

ER (H

OTE

L)

7 3a/C Reception & check-in counter

8 3a/B Business center/ library

9 4/B Social space

10 4a/B Idea room

11 2/E Bakery

12 3/G All day dining

13 3c-3d/M Pantry

14 5/E Pre-function room

15 4c-G Function room 1

16 5b/G Function room 2

17 4a-6/B Treatment 1, 2, 3

18 5a-6/B Couple treatment room

19 6-7/B Zacuzzi

20 6/D Male & female toilet

FRO

NT

OF

HO

USE

(HO

TEL)

21 2-2a/B Gen. cash

22 1a/B Storage

23 2-2a/B Account manager

24 2a/B Director finance

25 3/B GM office

26 5/C Sales & marketing

27 4-4a/c-D Hotel front office

28 4-4a/C Manager 1, 2

29 4-4a/D Luggage room

30 5/D Store

MAI

N K

ITCH

EN

31 5c/E Food preparation

32 1-1a/C Dry store

33 1-1a/C-D Walk-in freezer

34 2/C-D Walk-in chiller

35 1/D Freeze

36 1/D Chiller

37 2/D Pastry store

MAI

N K

ITCH

EN

38 1/D-E Meat prep

39 1/E Vege prep

40 2/E Pastry & bakery

41 2/E Chocolate room

42 1/E-F Cold kitchen

43 1/F RM. Service office

44 1/F Chef office

45 1/F Room service

46 1/F-G Steward store

47 1-1a/F-G Pot & pan washing

48 1/G Dish washing

49 2/F Cooking area

50 5/A-B Balcony

51 4b-7/H-M Deck extension for F&B funtions

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

MEZ

ZAN

INE

M&

E

1 1/C Bin room

2 1/C AWCS

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

LAN

DSC

APE

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

AUTOMATED WASTE COLLECTION SYSTEM

(AWCS)

FIREMAN INTERCOM SYSTEM INSTALLATION

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB

& CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

TRANSPORT PIPE & FITTING

MARKING (BY FASTFLOW) & CORING

ON SLAB (BY UMLB)RISER PIPE

INSTALLATIONDISCHARGE PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 10: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - PODIUM

PODIUM

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 7

MEZ

ZAN

INE

M&

E

3 2/B Ahu room 1

4 1/G Ahu room 2

5 01/F-G Balancing tank

6 01/G Pump room

7 1a/B-C M&E area

OFF

ICE

(BO

H)

8 1a/B I.T. Store

9 2-2a/B-C I.T. office

10 2b/B Server room

11 3/B Uniform issue

12 6/E Function room storage

13 6/H AV room

14 2/E HK manager

15 2/E-F HR. DIR. Office

16 2/E-F F&B DIR. Office

17 2/F-G Executive chef

18 1/F Working area

19 1/E Training/ meeting room

20 1a/D Corridors

SERV

ICE

AREA

(BO

H)

21 1-1a/C Security & receiving area

22 2/D Flower shop

23 2/D House keeping office

24 1/D Soiled linen room

25 1/D Valet laundry

26 1/D-E Clean linen room

27 1/C-D Trolley bay

28 3a/B Clinic

29 4/B

30 5a/B Team dinning room

31 6/B Kitchen

32 6/B-C Kitchen storage

33 6/C Staff social lounge

34 6/D Male & female prayer room

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

LEVE

L 8

FACI

LITY

11 3a/C Gym

12 3/B Male, female changing room

13 3/F Swimming pool

14 3/J Pantry

15 4d/J Spiral stair

16 2a-4/B-H Deck

17 2a-7/A-D

18 2b-7/B-J Steps

19 2b-7/B-J Ramp

Male & female changing room, toilet

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL

36

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

Roof top garden for apartment tower

FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

SANITARY PIPE FITTING BRACKET INSTALLATION GROUTING PIPE DISCHARGE SUMP

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

AUTOMATED WASTE COLLECTION SYSTEM

(AWCS)

FIREMAN INTERCOM SYSTEM INSTALLATION

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB

& CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

TRANSPORT PIPE & FITTING

MARKING (BY FASTFLOW) & CORING

ON SLAB (BY UMLB)RISER PIPE

INSTALLATIONDISCHARGE PIPE INSTALLATION

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 11: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTELUpdate : 09 Sep 15

DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV

LOCA

TIO

N /

RO

OM

TYP

E

CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION GRILL INSTALLATION

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON RISER / SHAFT

INSTALLATIONCABLE LADDER INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD

TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION - BEDROOM

DUCTING INSTALLATION - BATHROOM

COPPER PIPE INSTALLATION

DRAIN PIPE INSTALLATION

FLEXIBLE DUCT INSTALLATION -

BEDROOMINSTALLATION CONDUIT

& WIRINGFAN COIL UNIT (FCU) -

DUCT TYPE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 12: Table Monitoring Progress Finsihing & MEP

DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV

LOCA

TIO

N /

RO

OM

TYP

E

CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION GRILL INSTALLATION

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START STARTLEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON RISER / SHAFT

INSTALLATIONCABLE LADDER INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD

TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION - BEDROOM

DUCTING INSTALLATION - BATHROOM

COPPER PIPE INSTALLATION

DRAIN PIPE INSTALLATION

FLEXIBLE DUCT INSTALLATION -

BEDROOMINSTALLATION CONDUIT

& WIRINGFAN COIL UNIT (FCU) -

DUCT TYPE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 13: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTEL

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

GRILL INSTALLATION SANITARY PIPE FITTING HOT WATER PIPE FITTING OPENING CLEANING PIPE INSTALLATION BRACKET INSTALLATION

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

VENTILATION GRILL - LPAD & SSAD SHAFT

SPRINKLER SYSTEM PIPE INSTALLATION

HOSE REEL SYSTEM PIPE INSTALLATION

WET RISER SYSTEM PIPE INSTALLATION

INSTALLATION CONDUIT & WIRING FOR FA & FI

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

SMOKE DETECTOR ACCESSORIES

INSTALLATION

FIREMAN INTERCOM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB &

CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 14: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) RAINWATER DOWN PIPE

GRILL INSTALLATION SANITARY PIPE FITTING HOT WATER PIPE FITTING OPENING CLEANING PIPE INSTALLATION BRACKET INSTALLATION

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

VENTILATION GRILL - LPAD & SSAD SHAFT

SPRINKLER SYSTEM PIPE INSTALLATION

HOSE REEL SYSTEM PIPE INSTALLATION

WET RISER SYSTEM PIPE INSTALLATION

INSTALLATION CONDUIT & WIRING FOR FA & FI

SPRINKLER HEAD INSTALLATION

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

SMOKE DETECTOR ACCESSORIES

INSTALLATION

FIREMAN INTERCOM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB &

CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 15: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - HOTEL

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

RAINWATER DOWN PIPE

BRACKET INSTALLATION GROUTING PIPE

Actual Actual

START START

OUTLET & FLOOR TRAP INSTALLATION

Progress (%)

Progress (%)

Progress (%)

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 16: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

RAINWATER DOWN PIPE

BRACKET INSTALLATION GROUTING PIPE

Actual Actual

START START

OUTLET & FLOOR TRAP INSTALLATION

Progress (%)

Progress (%)

Progress (%)

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 17: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15

DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV

LEVE

L

AREA

NO

.

GRI

D L

INE CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START START START START START START START START START START START START START START START START START START

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

RISER / SHAFT INSTALLATION

CABLE LADDER INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION - LIVING ROOM

DUCTING INSTALLATION - BATHROOM

COPPER PIPE INSTALLATION

DRAIN PIPE INSTALLATION

FLEXIBLE DUCT INSTALLATION - LIVING

ROOMINSTALLATION CONDUIT

& WIRING FAN COIL UNIT (FCU) -

DUCT TYPE FAN COIL UNIT (FCU) - CEILING CASSETTE TYPE

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Page 18: Table Monitoring Progress Finsihing & MEP

DESCRIPTION ELECTRICAL SERVICES ( ELECTRICAL & ELV - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD ACCESS, GUARD TOUR, EARTHNING & LIGHTNING) ACMV

LEVE

L

AREA

NO

.

GRI

D L

INE CABLING INSTALLATION BOX INSTALLATION CABLING INSTALLATION LOOPING & MERGERING EXHAUST INSTALLATION

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START START START START START START START START START START START START START START START START START STARTLOCA

TIO

N /

RO

OM

TY

PE

RISER / SHAFT INSTALLATION

CABLE LADDER INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CABLE TRAY / TRUNKING INSTALLATION

CONDUIT AT COLUMN, WALL & SLAB

INSTALLATIONPANEL INSTALLATION (SUB SWITCHBOARD)

SOCKET OUTLET & LIGHT FITTING INSTALLATION

ELV DEVICES - TELEPHONE, DATA SYSTEM, MATV, CCTV, P.A, CARD

ACCESS, GUARD TOUR, EARTHNING & LIGHTNING

DUCTING INSTALLATION - LIVING ROOM

DUCTING INSTALLATION - BATHROOM

COPPER PIPE INSTALLATION

DRAIN PIPE INSTALLATION

FLEXIBLE DUCT INSTALLATION - LIVING

ROOMINSTALLATION CONDUIT

& WIRING FAN COIL UNIT (FCU) -

DUCT TYPE FAN COIL UNIT (FCU) - CEILING CASSETTE TYPE

LEVE

L 10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Page 19: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

FINISHING MONITORING APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15

ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) AUTOMATED WASTE COLLECTION SYSTEM (AWCS) RAINWATER DOWN PIPE

GRILL INSTALLATION SANITARY PIPE FITTING OPENING CLEANING

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START START START START START START START START START START START START START START START START START START

AC UNIT - WALL MOUNTED

VENTILATION GRILL - LPAD & SSAD SHAFT

HOSE REEL SYSTEM PIPE INSTALLATION

INSTALLATION CONDUIT & WIRING FOR FA & FI

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

FIREMAN INTERCOM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB &

CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

VALVES & WATER METER INSTALLATION

TRANSPORT

PIPE & FITTING

STAINLESS STEEL

PIPING & FITTING

HOPPER DOOR INSTALLATION

Page 20: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCA

TIO

N /

RO

OM

TY

PE

LEVE

L 10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

ACMV FIRE FIGHTING PLUMBING WORKS (COLD WATER, HOT WATER & SANITARY PLUMBING SYSTEM) AUTOMATED WASTE COLLECTION SYSTEM (AWCS) RAINWATER DOWN PIPE

GRILL INSTALLATION SANITARY PIPE FITTING OPENING CLEANING

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START START START START START START START START START START START START START START START START START START

AC UNIT - WALL MOUNTED

VENTILATION GRILL - LPAD & SSAD SHAFT

HOSE REEL SYSTEM PIPE INSTALLATION

INSTALLATION CONDUIT & WIRING FOR FA & FI

HOSE REEL DRUMSET INSTALLATION

LANDING VALVE & CANVAS HOSE INSTALLATION

FIRE ALARM ACCESSORIES

INSTALLATION

FIREMAN INTERCOM ACCESSORIES

INSTALLATION

PREPARE OPENING / SLEEVE AT FLOOR SLAB &

CONCEAL PIPE IN SHEARWALL / COLUMN

TRANFER PIPE INSTALLATION

DROPPER PIPE INSTALLATION

HANGER PIPE INSTALLATION

COLD WATER PIPE FITTING

HOT WATER PIPE FITTING

VALVES & WATER METER INSTALLATION

TRANSPORT

PIPE & FITTING

STAINLESS STEEL

PIPING & FITTING

HOPPER DOOR INSTALLATION

Page 21: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS MECHANICAL, ELECTRICAL & PLUMBING WORKS - APARTMENT

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

FINISHING MONITORING APARTMENT

RAINWATER DOWN PIPE

PIPE INSTALLATION BRACKET INSTALLATION GROUTING PIPE

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START

OUTLET & FLOOR TRAP INSTALLATION

Page 22: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCA

TIO

N /

RO

OM

TY

PE

LEVE

L 10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

RAINWATER DOWN PIPE

PIPE INSTALLATION BRACKET INSTALLATION GROUTING PIPE

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

START START START START

OUTLET & FLOOR TRAP INSTALLATION

Page 23: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15

DESCRIPTION INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)

LEVE

L

AREA

NO

.

GRI

D L

INE WINDOW - SUB FRAME WINDOW - FRAME SLIDING DOOR - FRAME WALL TILE - HT CEILING FRAME FLOOR SCREEDING FLOOR TILE - HT FLOOR SKIRTING - HT KITCHEN - WORKTOP

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualSTART START START START START START START START START START START START START START START START START START START START START START

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

STRUCTURE WORKS ADJUSTMENT

WALL - BLOCKWALL STAIRCASE, M&E SHAFT

& RISER

WATERPROOFING ON WET AREA + PONDING

TEST + SCREEDING WALL - SKIMCOAT /

PLASTERING DOOR - SOLID TIMBER

DOOR SUB FRAME SLIDING DOOR - SUB

FRAME LOUVRE ALLUMINIUM -

SUB FRAME WINDOW - LAMINATED

GLASS WINDOW FIX PANEL

SLIDING DOOR - LAMINATED GLASS

SLIDING DOOR WT FIX PANEL

WALL - ACCOUSTIC TREATMENT

WALL - FEATURE WALL TILE - HT - BATHROOM

PAINTING WALL BASED - EMULSION PAINT

FINISH BATHROOM - VANITY

TOP

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Page 24: Table Monitoring Progress Finsihing & MEP

DESCRIPTION INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)

LEVE

L

AREA

NO

.

GRI

D L

INE WINDOW - SUB FRAME WINDOW - FRAME SLIDING DOOR - FRAME WALL TILE - HT CEILING FRAME FLOOR SCREEDING FLOOR TILE - HT FLOOR SKIRTING - HT KITCHEN - WORKTOP

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualProgress (%)

ActualSTART START START START START START START START START START START START START START START START START START START START START STARTLO

CATI

ON

/ R

OO

M

TYPE

STRUCTURE WORKS ADJUSTMENT

WALL - BLOCKWALL STAIRCASE, M&E SHAFT

& RISER

WATERPROOFING ON WET AREA + PONDING

TEST + SCREEDING WALL - SKIMCOAT /

PLASTERING DOOR - SOLID TIMBER

DOOR SUB FRAME SLIDING DOOR - SUB

FRAME LOUVRE ALLUMINIUM -

SUB FRAME WINDOW - LAMINATED

GLASS WINDOW FIX PANEL

SLIDING DOOR - LAMINATED GLASS

SLIDING DOOR WT FIX PANEL

WALL - ACCOUSTIC TREATMENT

WALL - FEATURE WALL TILE - HT - BATHROOM

PAINTING WALL BASED - EMULSION PAINT

FINISH BATHROOM - VANITY

TOPLE

VEL

10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Page 25: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - APARTMENT

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

FINISHING MONITORING APARTMENT FINISHING MONITORING APARTMENTUpdate : 09 Sep 15

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)

CEILING BOARD LOUVRE ALLUMINIUM IRONMONGERY TIMBER FLOORING - WD SKIRTING - TIMBER BATHROOM - MIRROR

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

START START START START START START START START START START START START START START START START START START START START START

BATHROOM - VANITY TOP

PAINTING CEILING BASED - EMULSION PAINT

FINISH DOOR - SOLID TIMBER

DOOR FRAME DOOR - SOLID TIMBER

DOOR LEAVE RAILING BALCONY - STEEL + LAMINATED

GLASS RAILING PAINTING WALL FINAL - EMULSION PAINT FINISH

PAINTING CEILING FINAL - EMULSION PAINT FINISH

TRESHOLD - ALLUMINIUM

KITCHEN - BACK PAINTED GLASS

BATHROOM - SANITARY FITTING

BATHROOM - TEMPERED CLEAR GLASS

SHOWER SCREEN ID - KITCHEN - CABINET

& SHELF ID - KITCHEN -

APPLIANCES ID - BATHROOM - CABINET & SHELF

ID - BEDROOM - FURNITURE & APPLIANCES

ID - LIVING ROOM - FURNITURE & APPLIANCES

Page 26: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCA

TIO

N /

RO

OM

TY

PE

LEVE

L 10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN)

CEILING BOARD LOUVRE ALLUMINIUM IRONMONGERY TIMBER FLOORING - WD SKIRTING - TIMBER BATHROOM - MIRROR

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

START START START START START START START START START START START START START START START START START START START START START

BATHROOM - VANITY TOP

PAINTING CEILING BASED - EMULSION PAINT

FINISH DOOR - SOLID TIMBER

DOOR FRAME DOOR - SOLID TIMBER

DOOR LEAVE RAILING BALCONY - STEEL + LAMINATED

GLASS RAILING PAINTING WALL FINAL - EMULSION PAINT FINISH

PAINTING CEILING FINAL - EMULSION PAINT FINISH

TRESHOLD - ALLUMINIUM

KITCHEN - BACK PAINTED GLASS

BATHROOM - SANITARY FITTING

BATHROOM - TEMPERED CLEAR GLASS

SHOWER SCREEN ID - KITCHEN - CABINET

& SHELF ID - KITCHEN -

APPLIANCES ID - BATHROOM - CABINET & SHELF

ID - BEDROOM - FURNITURE & APPLIANCES

ID - LIVING ROOM - FURNITURE & APPLIANCES

Page 27: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - APARTMENT

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LEVE

L 8

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14 6/G

15 5a/D

16 1a/B-C

17 5a/D

18 5/D

19 4d-H RC Flat roof

20 5/C-G Apartment corridor

21 4-7/C-H

LEVE

L 9

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 10

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

LOCA

TIO

N /

RO

OM

TY

PE

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apt. unit (A1a-7a, B1a-4a, C1a-2a)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

FINISHING MONITORING APARTMENTUpdate : 09 Sep 15

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN) LIFT LOBBY & APARTMENT CORRIDOR M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

WALL SKIMCOAT CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)START START START START START START START START START START START START START START START START START START

ID - LIVING ROOM - FURNITURE & APPLIANCES

CEILING FINISHES - FRAME

WALL EMULSION PAINT - BASED

FLOOR FINISHES - HOMOGENEOUS TILE

SKIRTING - HOMOGENOUS TILE

CEILING FINISHES - GYPSUM BOARD

CEILING FINISHES - FINISH EMULSION PAINT

WALL EMULSION PAINT - FINAL

BACK PAINTED GLASS ON LIFT LOBBY

WALL FINISHES - RENDER / SKIM COAT

CEILING FINISHES - RENDER / SKIM COAT

HOMOGENOUS TILE FOR AWCS

CEILING FINISHES - PAINTING

WALL FINISHING - PAINTING

Page 28: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LEVE

L

AREA

NO

.

GRI

D L

INE

LOCA

TIO

N /

RO

OM

TY

PE

LEVE

L 10

APAR

TMEN

T

195/C-G Apartment corridor

204-7/C-H

LEVE

L 11

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

LEVE

L 12

APAR

TMEN

T

1 A1

2 A2

3 A3

4 A4

5 A5

6 A6

7 A7

8 B1

9 B2

10 B3

11 B4

12 C1

13 C2

14

6/G

15

5a/D

161a/B-C

17

5a/D

185/D

195/C-G Apartment corridor

204-7/C-H

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

Escape staircase S3 (basement to level 34)

Escape staircase S4 (basem.t to lower RC flat roof)

Fire/ service lift lobby at basement to level 19 (hotel)

Fire/ service lift lobby at basement to level 36 (service apartment)

Service apartment lift lobby at level 2 to level 36

Apartment units (A1-7, B1-4, C1-2)

INTERNAL UNIT WORKS (BATHROOM, LIVING ROOM, BEDROOM, KITCHEN) LIFT LOBBY & APARTMENT CORRIDOR M&E RISER AND ROOM (SSAD, HR, ELECT RISER, CW RISER, LPAD, TEL, ELV, WR & AWCS - 10 ROOMS & RISERS)

WALL SKIMCOAT CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)Actual

Progress (%)START START START START START START START START START START START START START START START START START START

ID - LIVING ROOM - FURNITURE & APPLIANCES

CEILING FINISHES - FRAME

WALL EMULSION PAINT - BASED

FLOOR FINISHES - HOMOGENEOUS TILE

SKIRTING - HOMOGENOUS TILE

CEILING FINISHES - GYPSUM BOARD

CEILING FINISHES - FINISH EMULSION PAINT

WALL EMULSION PAINT - FINAL

BACK PAINTED GLASS ON LIFT LOBBY

WALL FINISHES - RENDER / SKIM COAT

CEILING FINISHES - RENDER / SKIM COAT

HOMOGENOUS TILE FOR AWCS

CEILING FINISHES - PAINTING

WALL FINISHING - PAINTING

Page 29: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - HOTELUpdate : 09 Sep 15

DESCRIPTION INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

LOCA

TIO

N /

RO

OM

TYP

E

WALL BLOCKWALL WINDOW - SUB FRAME WALL SKIMCOAT CEILING - GYPSUM FRAME WALL PAINTING BASED FLOOR SCREEDING FLOOR TILE SKIRTING - TIMBER CEILING - BASED PAINT IRONMONGERY

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON SLIDING DOOR - SUB

FRAME DOOR ENTRANCE SOLID

TIMBER - SUB FRAME WATERPROOFING ON WET AREA + PONDING

TEST + SCREEDING WINDOW - FRAME +

GLASS WALL TILE - BATHROOM

BATHROOM - VANITY COUNTER

SKIRTING - TILE - BATHROOM

CEILING - GYPSUM BOARD

CEILING TRIM & SHADOW GAP METAL

BEADING DOOR ENTRANCE SOLID TIMBER - FRAME & LEAVE

SLIDING DOOR - FRAME & LEAVE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 30: Table Monitoring Progress Finsihing & MEP

DESCRIPTION INTERNAL UNIT WORKS (BATHROOM & BEDROOM)

LOCA

TIO

N /

RO

OM

TYP

E

WALL BLOCKWALL WINDOW - SUB FRAME WALL SKIMCOAT CEILING - GYPSUM FRAME WALL PAINTING BASED FLOOR SCREEDING FLOOR TILE SKIRTING - TIMBER CEILING - BASED PAINT IRONMONGERY

Actual Actual Actual Actual Actual Actual Actual Actual ActualProgress (%)

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START STARTLEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON SLIDING DOOR - SUB

FRAME DOOR ENTRANCE SOLID

TIMBER - SUB FRAME WATERPROOFING ON WET AREA + PONDING

TEST + SCREEDING WINDOW - FRAME +

GLASS WALL TILE - BATHROOM

BATHROOM - VANITY COUNTER

SKIRTING - TILE - BATHROOM

CEILING - GYPSUM BOARD

CEILING TRIM & SHADOW GAP METAL

BEADING DOOR ENTRANCE SOLID TIMBER - FRAME & LEAVE

SLIDING DOOR - FRAME & LEAVE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 31: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - HOTEL

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

INTERNAL UNIT WORKS (BATHROOM & BEDROOM) LIFT LOBBY & HOTEL CORRIDOR

CEILING - FINISH PAINT WALL PAINTING FINISH BAHTROOM - MIRROR WALL - SKIMCOAT FLOOR - SCREEDING

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

BATHROOM - SANITARY FITTING

BATHROOM - CISTERN MOVEABLE COVER IN

GRANITE FINISH BATHROOM -

ARTWORK BATHROOM -

TEMPERED GLASS SHELVES

ID - BATHROOM - COUNTER DRAWER, VANITY SHELVES IN

SOLID TIMBER FINISH

ID - BEDROOM - ARCHITRAVE IN SOLID

TIMBER FINISH ID - BEDROOM -

DRAPERY

ID - BEDROOM - BEDHEAD FRAME IN

ALUMINIUM & LAMINATE FINISH

ID - BEDROOM - UPHOLSTERED FINISH

ID - BEDROOM - MIRROR WORKS

ID - BEDROOM - FLOOR FINISH CARPET

ID - BEDROOM - FURNITURE & APPLIANCES

CONCRETE CURB ON PIPE CHASE DOOR

CEILING - FRAME INSTALLATION

PIPE CHASE DOOR LOUVRE & TIMBER

HOLLOW CORE - FRAME

PIPE CHASE DOOR LOUVRE & TIMBER

HOLLOW CORE - LEAVE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 32: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

INTERNAL UNIT WORKS (BATHROOM & BEDROOM) LIFT LOBBY & HOTEL CORRIDOR

CEILING - FINISH PAINT WALL PAINTING FINISH BAHTROOM - MIRROR WALL - SKIMCOAT FLOOR - SCREEDING

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START START START START START START

BATHROOM - SANITARY FITTING

BATHROOM - CISTERN MOVEABLE COVER IN

GRANITE FINISH BATHROOM -

ARTWORK BATHROOM -

TEMPERED GLASS SHELVES

ID - BATHROOM - COUNTER DRAWER, VANITY SHELVES IN

SOLID TIMBER FINISH

ID - BEDROOM - ARCHITRAVE IN SOLID

TIMBER FINISH ID - BEDROOM -

DRAPERY

ID - BEDROOM - BEDHEAD FRAME IN

ALUMINIUM & LAMINATE FINISH

ID - BEDROOM - UPHOLSTERED FINISH

ID - BEDROOM - MIRROR WORKS

ID - BEDROOM - FLOOR FINISH CARPET

ID - BEDROOM - FURNITURE & APPLIANCES

CONCRETE CURB ON PIPE CHASE DOOR

CEILING - FRAME INSTALLATION

PIPE CHASE DOOR LOUVRE & TIMBER

HOLLOW CORE - FRAME

PIPE CHASE DOOR LOUVRE & TIMBER

HOLLOW CORE - LEAVE

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 33: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - HOTEL

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L 8

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1/C Store

3 1a/C Tel/IT

4 1a/G Smoke lobby

5 2/B, 1-2a/B Balcony

6 1a-2/B-H Hotel corridor

7 1-2a/B-M Hotel room 1-25

LEVE

L 9

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room

2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 10

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

LIFT LOBBY & HOTEL CORRIDOR M&E RISER AND ROOM

CEILING - PAINTING CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START

SKIRTING IN SOLID TIMBER

CEILING - GYPSUM BOARD

CEILING - PORTAL CEILING IN BACKPAINTED

GLASS FINISH

WALL - END WALL IN COPPER FREE MIRROR

FINISH ID WALL - IN WALL

COVERING FINISH ID FLOOR - CARPET

INSTALLATION WALL FINISHES -

RENDER / SKIM COAT CEILING FINISHES -

RENDER / SKIM COAT HOMOGENOUS TILE

FOR AWCS CEILING FINISHES -

PAINTING WALL FINISHING -

PAINTING

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E7
Aline Tschaeppaet: Room number: 0802
E41
Aline Tschaeppaet: Room number: 0802
E73
Aline Tschaeppaet: Room number: 0802
Page 34: Table Monitoring Progress Finsihing & MEP

DESCRIPTION

LOCA

TIO

N /

RO

OM

TYP

E

LEVE

L /

NAM

E O

F FL

OO

R LE

VELS

AS

PER

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

NO

. / N

AME

OF

FLO

OR

LEVE

LS F

OR

CON

STRU

CTIO

N &

AU

THO

RITY

DRA

WIN

GS

GRI

D L

INE/

NAM

E O

F FL

OO

R LE

VELS

FO

R SI

GN

AGE

AND

HO

TEL

OPE

RATI

ON

LEVE

L 10

3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 11

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

LEVE

L 12

1 02 S - K2 04 Disable -K3 06 S -K4 08 S - K5 10 S -T6 12 S - K7 14 S -T8 16 S - K9 18 D- K

10 01 D- K11 03 S - K12 05 D- K13 07 S -T14 09 S - K15 11 P -T16 13 P - K17 15 P -T18 17 P - K19 19 P - K20 21 P - K21 23 S -T22 25 D - T23 20 J -K

1 1/A

2 1/G

7 2/C

1 1a/B Linen room2 1a/G Smoke lobby3 1-2b/B-M Hotel room 1-254 1a-2/B-H Hotel corridor5 2/B, 1-2a/B Balcony

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

Escape staircase S1 (basement to level 20)

Escape staircase S2 (basement to level 19)

Hotel lift lobby at level 3 to level 18

LIFT LOBBY & HOTEL CORRIDOR M&E RISER AND ROOM

CEILING - PAINTING CEMENT SAND SCREED DOOR FRAME DOOR LEAVE IRONMONGERY

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual

START START START START START START START START START START START START START START START START

SKIRTING IN SOLID TIMBER

CEILING - GYPSUM BOARD

CEILING - PORTAL CEILING IN BACKPAINTED

GLASS FINISH

WALL - END WALL IN COPPER FREE MIRROR

FINISH ID WALL - IN WALL

COVERING FINISH ID FLOOR - CARPET

INSTALLATION WALL FINISHES -

RENDER / SKIM COAT CEILING FINISHES -

RENDER / SKIM COAT HOMOGENOUS TILE

FOR AWCS CEILING FINISHES -

PAINTING WALL FINISHING -

PAINTING

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

E105
Aline Tschaeppaet: Room number: 0802
E137
Aline Tschaeppaet: Room number: 0802
Page 35: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

BASE

MEN

T

LIFT

CO

RE

1 01-2/A Hotel store 1,2

4a/C-D Store 3

2 4a-5/C-D Store (service apt.)

3 7/G Carpark store

4 1-2/F-G Staircase lobby

PARK

ING

& D

RIVE

WAY

5 5/C Passage

6 1-7/A-J Car parking

7 1-7/A-J Motor parking

8 4a-E Handicapped parking space

9 1/E Ramp 1

M&

E SE

RVIC

E RO

OM

10 1/C Fan room

11 3a/B Chiller plant room

12 4/B Flood retention tank (below)

13 4a/A-B Sump pit

14 5/A Domestic tank 1, 2 (retail)

15 5/A Pump room 1 (retail)

16 5a/B Pump room 2 (hotel)

17 6/B Pump room 3 (service apt.)

18 6/C-D Pump room 4 (service Apt. + retail)

19 5a-6/D Pump room 5 (hotel)

20 5b-5c/H Pump room 6 (hotel)

21 5b-5c/J Pump room 7 (retail/ carpark)

22 5a/A AC make up tank 1, 2 (hotel)

23 7/A Domestic tank 3 (hotel)

24 7/B Domestic tank 4 (service apt.)

25 5a-6/C Wet riser tank 1, 2

26 6-7/C Hose reel tank 1, 2

27 7/D Fresh air fanroom (car park)

28 5b/H Sprinkler pump stage 1

29 7/J-K Sprinkler tank 1, 2

30 2/H

31 01/G OSD, on-site detention tank

32 01/F Rain water harvesting tank

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L1

M&

E AN

D S

ERVI

CE R

OO

M 1 1a/A Store

2 5a/D Janitor

3 5a/D-E Refuse

4 5a-D Refuse bin

5 4a-5B/D-F Store 1, 2,3,4,5

6 1-H Ramp 1

RETA

IL

7 2a-4a/D-L Retail lobby

8 1-6/C-G Passage 1, 2, 3, 4

9 3/M Retail service lift lobby

10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10

11 4a-5b/C-F Retail male & female toilet

12 4/F Glass lift

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

Grease interceptor system (hotel&retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

Page 36: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L1

RETA

IL

13 3a/F Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 2

M&

E &

SER

VICE

RO

OM

(HO

TEL)

1 2/C Hotel lobby

2 3/B-C Reception

3 1/C Receiving area & purchasing

4 2/D Luggage room

5 1a/B LPG Farm 1 (hotel)

6 2/B Loading & Unloading bay

7 2a/B Receiving area & platform

8 1/C-D Bin center 1

9 1/C-D Store

M&

E &

SER

VICE

RO

OM

(SER

VICE

APA

RTM

ENT

& R

ETAI

L)

10 5a/E Retail service lift lobby

11 5/C Letter box

12 5a/C Fire control room (retail, apt.)

13 6/C MDF room

14 6/C-D Bin center 2

15 5a-6/D AWCS cable room

16 5a-6/D-E AWCS

17 5a/E CWSP

18 5a/E Full vacuumload station

19 6/E Loading & Unloading

20 5a/F Consumer HT room

21 5a/G TNB room

22 6/G TNB meter room

23 5b/G-H M&E room

24 5c/H Diesel fuel pump room

25 5b/H Bomba vehicle turning circle

26 5b/J LPG Farm 2 (retail)

CIRC

ULA

TIO

N 27 4a/E-F Passage

28 01/B Ramp 2

29 2a-7/A-C Drop off

RETA

IL

30 2b-4a/C-K Retail lobby

31 01-5c/C-M Retail unit 1,2,3,4,5,6,7

32 5/E Retail male & female toilet

33 3b/E Glass lift

34 3/E Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 3A

& 3

B

1 3/J Retail lift lobby

M&

E SE

RVIC

E RO

OM

2 1a/B M&E room

3 1/C Store

4 4/E Smoke spill fan room

5 4a/E Copper pipes compartment

6 1a/F Smoke spill fresh air pump room

CARP

AKIN

G &

DRI

VEW

AY

7 2b-E Pedestrian walk way

8 1-5a/C-J Passage

9 1-7/B-M Car parking

10 2a/C Handicapped parking space

11 3/E-F Stair from 3A to 3B

12 01-6/C-K Ramp

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO L

EVEL

36

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

RETA IL

Page 37: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 3A

& 3

B

OTH

ER R

OO

MS 13 2-2a/E-F Car park management office

14 1/H Male prayer room

15 2/H Female prayer room

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 4A

& 4

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

4 1-5/B-M Passage

5 2/E-F Stair from 4A to 4B

6 01-6/C-K Ramp

7 1-7/B-M Car parking

8 2a/B, 5-C Handicaped parking space

9 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 5A

& 5

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 2/B Genset room (hotel)

4 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

5 1-5/B-M Passage

6 2/E-F Stair to up from 4A to 4B

7 01-6/C-K Ramp

8 1-7/B-M Car parking

9 2a/B, 5-C Handicaped parking space

10 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 6A

& 6

B

1 3/M Retail lift lobby

2 1-2/B-C Store 1, 2

3 4a/D-E Store 3

4 6/G Store 4

5 6/E Management office

M&

E

6 2a/B Main switch board room (hotel)

7 2b/B Transformer room (hotel)

8 5a-6/C Transformer (apartment)

9 6/C

10 5a-6/C-D Switch gear room (apartment)

11 4a/E CW pump room

12 5/E EFF & CW. Tank

13 6/H Transformer room (retail)

14 6/J Main switch boardroom (retail)

15 6/K Genset room (retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

R.M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

ROO

M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

& S

ERVI

CE

ROO

M

Main switch board room (apartment)

Page 38: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 6A

& 6

B

M&

E

16 1a/F Fire pump room (hotel)

17 1/F HR tank 1, 2

18 2/F WR tank 1, 2

PARK

ING 19 01-6/C-K Ramp

20 5a/B, 2/K Motocycle parking

21 01-7/B-M Car parking

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

M&

E AN

D S

TORE

1 7/H AV store

2 5a-6/C Spa store

3 5/D-E Store

4 1/C Bins room

5 1/C-D AWCS

6 6/C-D Staircase pressurization room

CUST

OM

ER (H

OTE

L)

7 3a/C Reception & check-in counter

8 3a/B Business center/ library

9 4/B Social space

10 4a/B Idea room

11 2/E Bakery

12 3/G All day dining

13 3c-3d/M Pantry

14 5/E Pre-function room

15 4c-G Function room 1

16 5b/G Function room 2

17 4a-6/B Treatment 1, 2, 3

18 5a-6/B Couple treatment room

19 6-7/B Zacuzzi

20 6/D Male & female toilet

FRO

NT

OF

HO

USE

(HO

TEL)

21 2-2a/B Gen. cash

22 1a/B Storage

23 2-2a/B Account manager

24 2a/B Director finance

25 3/B GM office

26 5/C Sales & marketing

27 4-4a/c-D Hotel front office

28 4-4a/C Manager 1, 2

29 4-4a/D Luggage room

30 5/D Store

MAI

N K

ITCH

EN

31 5c/E Food preparation

32 1-1a/C Dry store

33 1-1a/C-D Walk-in freezer

34 2/C-D Walk-in chiller

35 1/D Freeze

36 1/D Chiller

37 2/D Pastry store

MAI

N K

ITCH

EN

38 1/D-E Meat prep

39 1/E Vege prep

40 2/E Pastry & bakery

41 2/E Chocolate room

42 1/E-F Cold kitchen

43 1/F RM. Service office

44 1/F Chef office

45 1/F Room service

Page 39: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 7

MAI

N K

ITCH

EN

46 1/F-G Steward store

47 1-1a/F-G Pot & pan washing

48 1/G Dish washing

49 2/F Cooking area

LAN

DSC

APE

50 5/A-B Balcony

51 4b-7/H-M Deck extension for F&B funtions

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

MEZ

ZAN

INE

M&

E

1 1/C Bin room

2 1/C AWCS

3 2/B Ahu room 1

4 1/G Ahu room 2

5 01/F-G Balancing tank

6 01/G Pump room

7 1a/B-C M&E area

OFF

ICE

(BO

H)

8 1a/B I.T. Store

9 2-2a/B-C I.T. office

10 2b/B Server room

11 3/B Uniform issue

12 6/E Function room storage

13 6/H AV room

14 2/E HK manager

15 2/E-F HR. DIR. Office

16 2/E-F F&B DIR. Office

17 2/F-G Executive chef

18 1/F Working area

19 1/E Training/ meeting room

20 1a/D Corridors

SERV

ICE

AREA

(BO

H)

21 1-1a/C Security & receiving area

22 2/D Flower shop

23 2/D House keeping office

24 1/D Soiled linen room

25 1/D Valet laundry

26 1/D-E Clean linen room

27 1/C-D Trolley bay

28 3a/B Clinic

29 4/B

30 5a/B Team dinning room

31 6/B Kitchen

32 6/B-C Kitchen storage

33 6/C Staff social lounge

34 6/D Male & female prayer room

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

LEVE

L 8

FACI

LITY

11 3a/C Gym

Male & female changing room, toilet

TYPI

CAL

COM

MO

N A

REA

- B

ASE

MEN

T TO

LEV

EL

36

LIFT

CO

RE &

ESC

APE

ST

AIR

CASE

Page 40: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUMUpdate : 09 Sep 15

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATIONBLOCKWALL WALL - GRANITE FLOOR - GRANITE

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START START

BLOCKWALL M&E SHAFT & RISER

WALL - SKIMCOAT WITH PAINT FINISH

WATERPROOFING + PONDING TEST +

SCREEDINGFIRE RATE TIMBER

DOOR - SUB FRAMESTEEL DOOR - SUB

FRAMETIMBER FLUSH DOOR -

SUB FRAMEWALL - HOMOGENEOUS

TILEWALL - RENDER /

SKIMCOATCEILING - RENDER /

SKIMCOAT

CEILING - RENDER / SKIMCOAT WITH PAINT

FINISH

CEILING - FRAME FOR PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - FRAME FOR EXPOSED GRID GYPSUM

CEILING PANELFLOOR - CEMENT SAND

SCREEDFLOOR - FLOWCRETE

COATINGFLOOR -

HOMOGENEOUS TILEFLOOR - RENDER /

SKIMCOAT

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

LEVE

L 8

FACI

LITY

12 3/B Male, female changing room

13 3/F Swimming pool

14 3/J Pantry

15 4d/J Spiral stair

16 2a-4/B-H Deck

17 2a-7/A-D

18 2b-7/B-J Steps

19 2b-7/B-J Ramp

Roof top garden for apartment tower

Page 41: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

BASE

MEN

T

LIFT

CO

RE

1 01-2/A Hotel store 1,2

4a/C-D Store 3

2 4a-5/C-D Store (service apt.)

3 7/G Carpark store

4 1-2/F-G Staircase lobby

PARK

ING

& D

RIVE

WAY

5 5/C Passage

6 1-7/A-J Car parking

7 1-7/A-J Motor parking

8 4a-E Handicapped parking space

9 1/E Ramp 1

M&

E SE

RVIC

E RO

OM

10 1/C Fan room

11 3a/B Chiller plant room

12 4/B Flood retention tank (below)

13 4a/A-B Sump pit

14 5/A Domestic tank 1, 2 (retail)

15 5/A Pump room 1 (retail)

16 5a/B Pump room 2 (hotel)

17 6/B Pump room 3 (service apt.)

18 6/C-D Pump room 4 (service Apt. + retail)

19 5a-6/D Pump room 5 (hotel)

20 5b-5c/H Pump room 6 (hotel)

21 5b-5c/J Pump room 7 (retail/ carpark)

22 5a/A AC make up tank 1, 2 (hotel)

23 7/A Domestic tank 3 (hotel)

24 7/B Domestic tank 4 (service apt.)

25 5a-6/C Wet riser tank 1, 2

26 6-7/C Hose reel tank 1, 2

27 7/D Fresh air fanroom (car park)

28 5b/H Sprinkler pump stage 1

29 7/J-K Sprinkler tank 1, 2

30 2/H

31 01/G OSD, on-site detention tank

32 01/F Rain water harvesting tank

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L1

M&

E AN

D S

ERVI

CE R

OO

M 1 1a/A Store

2 5a/D Janitor

3 5a/D-E Refuse

4 5a-D Refuse bin

5 4a-5B/D-F Store 1, 2,3,4,5

6 1-H Ramp 1

RETA

IL

7 2a-4a/D-L Retail lobby

8 1-6/C-G Passage 1, 2, 3, 4

9 3/M Retail service lift lobby

10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10

11 4a-5b/C-F Retail male & female toilet

12 4/F Glass lift

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

Grease interceptor system (hotel&retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 42: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L1

RETA

IL

13 3a/F Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 2

M&

E &

SER

VICE

RO

OM

(HO

TEL)

1 2/C Hotel lobby

2 3/B-C Reception

3 1/C Receiving area & purchasing

4 2/D Luggage room

5 1a/B LPG Farm 1 (hotel)

6 2/B Loading & Unloading bay

7 2a/B Receiving area & platform

8 1/C-D Bin center 1

9 1/C-D Store

M&

E &

SER

VICE

RO

OM

(SER

VICE

APA

RTM

ENT

& R

ETAI

L)

10 5a/E Retail service lift lobby

11 5/C Letter box

12 5a/C Fire control room (retail, apt.)

13 6/C MDF room

14 6/C-D Bin center 2

15 5a-6/D AWCS cable room

16 5a-6/D-E AWCS

17 5a/E CWSP

18 5a/E Full vacuumload station

19 6/E Loading & Unloading

20 5a/F Consumer HT room

21 5a/G TNB room

22 6/G TNB meter room

23 5b/G-H M&E room

24 5c/H Diesel fuel pump room

25 5b/H Bomba vehicle turning circle

26 5b/J LPG Farm 2 (retail)

CIRC

ULA

TIO

N 27 4a/E-F Passage

28 01/B Ramp 2

29 2a-7/A-C Drop off

RETA

IL

30 2b-4a/C-K Retail lobby

31 01-5c/C-M Retail unit 1,2,3,4,5,6,7

32 5/E Retail male & female toilet

33 3b/E Glass lift

34 3/E Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 3A

& 3

B

1 3/J Retail lift lobby

M&

E SE

RVIC

E RO

OM

2 1a/B M&E room

3 1/C Store

4 4/E Smoke spill fan room

5 4a/E Copper pipes compartment

6 1a/F Smoke spill fresh air pump room

CARP

AKIN

G &

DRI

VEW

AY

7 2b-E Pedestrian walk way

8 1-5a/C-J Passage

9 1-7/B-M Car parking

10 2a/C Handicapped parking space

11 3/E-F Stair from 3A to 3B

12 01-6/C-K Ramp

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO L

EVEL

36

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

RETA IL

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 43: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 3A

& 3

B

OTH

ER R

OO

MS 13 2-2a/E-F Car park management office

14 1/H Male prayer room

15 2/H Female prayer room

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 4A

& 4

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

4 1-5/B-M Passage

5 2/E-F Stair from 4A to 4B

6 01-6/C-K Ramp

7 1-7/B-M Car parking

8 2a/B, 5-C Handicaped parking space

9 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 5A

& 5

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 2/B Genset room (hotel)

4 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

5 1-5/B-M Passage

6 2/E-F Stair to up from 4A to 4B

7 01-6/C-K Ramp

8 1-7/B-M Car parking

9 2a/B, 5-C Handicaped parking space

10 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 6A

& 6

B

1 3/M Retail lift lobby

2 1-2/B-C Store 1, 2

3 4a/D-E Store 3

4 6/G Store 4

5 6/E Management office

M&

E

6 2a/B Main switch board room (hotel)

7 2b/B Transformer room (hotel)

8 5a-6/C Transformer (apartment)

9 6/C

10 5a-6/C-D Switch gear room (apartment)

11 4a/E CW pump room

12 5/E EFF & CW. Tank

13 6/H Transformer room (retail)

14 6/J Main switch boardroom (retail)

15 6/K Genset room (retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

R.M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

ROO

M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

& S

ERVI

CE

ROO

M

Main switch board room (apartment)

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 44: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 6A

& 6

B

M&

E

16 1a/F Fire pump room (hotel)

17 1/F HR tank 1, 2

18 2/F WR tank 1, 2

PARK

ING 19 01-6/C-K Ramp

20 5a/B, 2/K Motocycle parking

21 01-7/B-M Car parking

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

M&

E AN

D S

TORE

1 7/H AV store

2 5a-6/C Spa store

3 5/D-E Store

4 1/C Bins room

5 1/C-D AWCS

6 6/C-D Staircase pressurization room

CUST

OM

ER (H

OTE

L)

7 3a/C Reception & check-in counter

8 3a/B Business center/ library

9 4/B Social space

10 4a/B Idea room

11 2/E Bakery

12 3/G All day dining

13 3c-3d/M Pantry

14 5/E Pre-function room

15 4c-G Function room 1

16 5b/G Function room 2

17 4a-6/B Treatment 1, 2, 3

18 5a-6/B Couple treatment room

19 6-7/B Zacuzzi

20 6/D Male & female toilet

FRO

NT

OF

HO

USE

(HO

TEL)

21 2-2a/B Gen. cash

22 1a/B Storage

23 2-2a/B Account manager

24 2a/B Director finance

25 3/B GM office

26 5/C Sales & marketing

27 4-4a/c-D Hotel front office

28 4-4a/C Manager 1, 2

29 4-4a/D Luggage room

30 5/D Store

MAI

N K

ITCH

EN

31 5c/E Food preparation

32 1-1a/C Dry store

33 1-1a/C-D Walk-in freezer

34 2/C-D Walk-in chiller

35 1/D Freeze

36 1/D Chiller

37 2/D Pastry store

MAI

N K

ITCH

EN

38 1/D-E Meat prep

39 1/E Vege prep

40 2/E Pastry & bakery

41 2/E Chocolate room

42 1/E-F Cold kitchen

43 1/F RM. Service office

44 1/F Chef office

45 1/F Room service

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 45: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 7

MAI

N K

ITCH

EN

46 1/F-G Steward store

47 1-1a/F-G Pot & pan washing

48 1/G Dish washing

49 2/F Cooking area

LAN

DSC

APE

50 5/A-B Balcony

51 4b-7/H-M Deck extension for F&B funtions

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

MEZ

ZAN

INE

M&

E

1 1/C Bin room

2 1/C AWCS

3 2/B Ahu room 1

4 1/G Ahu room 2

5 01/F-G Balancing tank

6 01/G Pump room

7 1a/B-C M&E area

OFF

ICE

(BO

H)

8 1a/B I.T. Store

9 2-2a/B-C I.T. office

10 2b/B Server room

11 3/B Uniform issue

12 6/E Function room storage

13 6/H AV room

14 2/E HK manager

15 2/E-F HR. DIR. Office

16 2/E-F F&B DIR. Office

17 2/F-G Executive chef

18 1/F Working area

19 1/E Training/ meeting room

20 1a/D Corridors

SERV

ICE

AREA

(BO

H)

21 1-1a/C Security & receiving area

22 2/D Flower shop

23 2/D House keeping office

24 1/D Soiled linen room

25 1/D Valet laundry

26 1/D-E Clean linen room

27 1/C-D Trolley bay

28 3a/B Clinic

29 4/B

30 5a/B Team dinning room

31 6/B Kitchen

32 6/B-C Kitchen storage

33 6/C Staff social lounge

34 6/D Male & female prayer room

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

LEVE

L 8

FACI

LITY

11 3a/C Gym

Male & female changing room, toilet

TYPI

CAL

COM

MO

N A

REA

- B

ASE

MEN

T TO

LEV

EL

36

LIFT

CO

RE &

ESC

APE

ST

AIR

CASE

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 46: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 8

FACI

LITY

12 3/B Male, female changing room

13 3/F Swimming pool

14 3/J Pantry

15 4d/J Spiral stair

16 2a-4/B-H Deck

17 2a-7/A-D

18 2b-7/B-J Steps

19 2b-7/B-J Ramp

Roof top garden for apartment tower

MONITORING PROGRESS FINISHING - PODIUM

PODIUM

SKIRTING - TIMBER WALL BASED PAINTING WALL FINAL PAINTING STEEL DOOR - LEAVE STEEL ROLLER SHUTTER

Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual Actual ActualSTART START START START START START START START START START START START START START START START START START

FLOOR - RENDER / SKIMCOAT

SKIRTING - HOMOGENOUS TILE

FLOOR - RENDER / SKIMCOAT WITH PAINT

FINISHFIRE RATE TIMBER

DOOR - LEAVETIMBER FLUSH DOOR -

LEAVE

CEILING - GYPSUM PLASTER BOARD AND EMULTION PAINTED

FINISH

CEILING - EXPOSED GRID GYPSUM CEILING

PANELCEILING BASED

PAINTINGCEILING FINAL

PAINTINGIRONMONGERY - FIRE RATE TIMBER DOOR

IRONMONGERY - TIMBER FLUSH DOOR

IRONMONGERY - STEEL DOOR

IRONMONGERY - STEEL ROLLER SHUTTER

SANITARY WARE - FAUCET

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 47: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

BASE

MEN

T

LIFT

CO

RE

1 01-2/A Hotel store 1,2

4a/C-D Store 3

2 4a-5/C-D Store (service apt.)

3 7/G Carpark store

4 1-2/F-G Staircase lobby

PARK

ING

& D

RIVE

WAY

5 5/C Passage

6 1-7/A-J Car parking

7 1-7/A-J Motor parking

8 4a-E Handicapped parking space

9 1/E Ramp 1

M&

E SE

RVIC

E RO

OM

10 1/C Fan room

11 3a/B Chiller plant room

12 4/B Flood retention tank (below)

13 4a/A-B Sump pit

14 5/A Domestic tank 1, 2 (retail)

15 5/A Pump room 1 (retail)

16 5a/B Pump room 2 (hotel)

17 6/B Pump room 3 (service apt.)

18 6/C-D Pump room 4 (service Apt. + retail)

19 5a-6/D Pump room 5 (hotel)

20 5b-5c/H Pump room 6 (hotel)

21 5b-5c/J Pump room 7 (retail/ carpark)

22 5a/A AC make up tank 1, 2 (hotel)

23 7/A Domestic tank 3 (hotel)

24 7/B Domestic tank 4 (service apt.)

25 5a-6/C Wet riser tank 1, 2

26 6-7/C Hose reel tank 1, 2

27 7/D Fresh air fanroom (car park)

28 5b/H Sprinkler pump stage 1

29 7/J-K Sprinkler tank 1, 2

30 2/H

31 01/G OSD, on-site detention tank

32 01/F Rain water harvesting tank

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L1

M&

E AN

D S

ERVI

CE R

OO

M 1 1a/A Store

2 5a/D Janitor

3 5a/D-E Refuse

4 5a-D Refuse bin

5 4a-5B/D-F Store 1, 2,3,4,5

6 1-H Ramp 1

RETA

IL

7 2a-4a/D-L Retail lobby

8 1-6/C-G Passage 1, 2, 3, 4

9 3/M Retail service lift lobby

10 1-7/A-M Retail unit 1,2,3,4,5,6,7,8,9,10

11 4a-5b/C-F Retail male & female toilet

12 4/F Glass lift

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

Grease interceptor system (hotel&retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 48: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L1

RETA

IL

13 3a/F Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 2

M&

E &

SER

VICE

RO

OM

(HO

TEL)

1 2/C Hotel lobby

2 3/B-C Reception

3 1/C Receiving area & purchasing

4 2/D Luggage room

5 1a/B LPG Farm 1 (hotel)

6 2/B Loading & Unloading bay

7 2a/B Receiving area & platform

8 1/C-D Bin center 1

9 1/C-D Store

M&

E &

SER

VICE

RO

OM

(SER

VICE

APA

RTM

ENT

& R

ETAI

L)

10 5a/E Retail service lift lobby

11 5/C Letter box

12 5a/C Fire control room (retail, apt.)

13 6/C MDF room

14 6/C-D Bin center 2

15 5a-6/D AWCS cable room

16 5a-6/D-E AWCS

17 5a/E CWSP

18 5a/E Full vacuumload station

19 6/E Loading & Unloading

20 5a/F Consumer HT room

21 5a/G TNB room

22 6/G TNB meter room

23 5b/G-H M&E room

24 5c/H Diesel fuel pump room

25 5b/H Bomba vehicle turning circle

26 5b/J LPG Farm 2 (retail)

CIRC

ULA

TIO

N 27 4a/E-F Passage

28 01/B Ramp 2

29 2a-7/A-C Drop off

RETA

IL

30 2b-4a/C-K Retail lobby

31 01-5c/C-M Retail unit 1,2,3,4,5,6,7

32 5/E Retail male & female toilet

33 3b/E Glass lift

34 3/E Escalator

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 3A

& 3

B

1 3/J Retail lift lobby

M&

E SE

RVIC

E RO

OM

2 1a/B M&E room

3 1/C Store

4 4/E Smoke spill fan room

5 4a/E Copper pipes compartment

6 1a/F Smoke spill fresh air pump room

CARP

AKIN

G &

DRI

VEW

AY

7 2b-E Pedestrian walk way

8 1-5a/C-J Passage

9 1-7/B-M Car parking

10 2a/C Handicapped parking space

11 3/E-F Stair from 3A to 3B

12 01-6/C-K Ramp

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO L

EVEL

36

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

RETA IL

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 49: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 3A

& 3

B

OTH

ER R

OO

MS 13 2-2a/E-F Car park management office

14 1/H Male prayer room

15 2/H Female prayer room

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 4A

& 4

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

4 1-5/B-M Passage

5 2/E-F Stair from 4A to 4B

6 01-6/C-K Ramp

7 1-7/B-M Car parking

8 2a/B, 5-C Handicaped parking space

9 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 5A

& 5

B

1 1-2/B-C Store 1, 2

2 4a/D-E Store 3

3 2/B Genset room (hotel)

4 3/M Retail lift lobby

PARK

ING

& D

RIVE

WAY

5 1-5/B-M Passage

6 2/E-F Stair to up from 4A to 4B

7 01-6/C-K Ramp

8 1-7/B-M Car parking

9 2a/B, 5-C Handicaped parking space

10 2-2a/J-M Motocycle

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 6A

& 6

B

1 3/M Retail lift lobby

2 1-2/B-C Store 1, 2

3 4a/D-E Store 3

4 6/G Store 4

5 6/E Management office

M&

E

6 2a/B Main switch board room (hotel)

7 2b/B Transformer room (hotel)

8 5a-6/C Transformer (apartment)

9 6/C

10 5a-6/C-D Switch gear room (apartment)

11 4a/E CW pump room

12 5/E EFF & CW. Tank

13 6/H Transformer room (retail)

14 6/J Main switch boardroom (retail)

15 6/K Genset room (retail)

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

R.M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

&

SERV

ICE

ROO

M

TYPI

CAL

COM

MO

N A

REA

- BA

SEM

ENT

TO

LEVE

L 36

LIFT

LO

BBY

& S

ERVI

CE

ROO

M

Main switch board room (apartment)

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 50: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 6A

& 6

B

M&

E

16 1a/F Fire pump room (hotel)

17 1/F HR tank 1, 2

18 2/F WR tank 1, 2

PARK

ING 19 01-6/C-K Ramp

20 5a/B, 2/K Motocycle parking

21 01-7/B-M Car parking

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

M&

E AN

D S

TORE

1 7/H AV store

2 5a-6/C Spa store

3 5/D-E Store

4 1/C Bins room

5 1/C-D AWCS

6 6/C-D Staircase pressurization room

CUST

OM

ER (H

OTE

L)

7 3a/C Reception & check-in counter

8 3a/B Business center/ library

9 4/B Social space

10 4a/B Idea room

11 2/E Bakery

12 3/G All day dining

13 3c-3d/M Pantry

14 5/E Pre-function room

15 4c-G Function room 1

16 5b/G Function room 2

17 4a-6/B Treatment 1, 2, 3

18 5a-6/B Couple treatment room

19 6-7/B Zacuzzi

20 6/D Male & female toilet

FRO

NT

OF

HO

USE

(HO

TEL)

21 2-2a/B Gen. cash

22 1a/B Storage

23 2-2a/B Account manager

24 2a/B Director finance

25 3/B GM office

26 5/C Sales & marketing

27 4-4a/c-D Hotel front office

28 4-4a/C Manager 1, 2

29 4-4a/D Luggage room

30 5/D Store

MAI

N K

ITCH

EN

31 5c/E Food preparation

32 1-1a/C Dry store

33 1-1a/C-D Walk-in freezer

34 2/C-D Walk-in chiller

35 1/D Freeze

36 1/D Chiller

37 2/D Pastry store

MAI

N K

ITCH

EN

38 1/D-E Meat prep

39 1/E Vege prep

40 2/E Pastry & bakery

41 2/E Chocolate room

42 1/E-F Cold kitchen

43 1/F RM. Service office

44 1/F Chef office

45 1/F Room service

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 51: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 7

MAI

N K

ITCH

EN

46 1/F-G Steward store

47 1-1a/F-G Pot & pan washing

48 1/G Dish washing

49 2/F Cooking area

LAN

DSC

APE

50 5/A-B Balcony

51 4b-7/H-M Deck extension for F&B funtions

TYPI

CAL

COM

MO

N A

REA

- BAS

EMEN

T TO

LEV

EL 3

6

LIFT

CO

RE &

ESC

APE

STAI

RCAS

E

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

5 1a/B-C Fire/ service lift lobby

6 5a/D Fire/ service lift lobby

7 2/C Hotel lift lobby

8 5/D Service apartment lift lobby

LEVE

L 7

MEZ

ZAN

INE

M&

E

1 1/C Bin room

2 1/C AWCS

3 2/B Ahu room 1

4 1/G Ahu room 2

5 01/F-G Balancing tank

6 01/G Pump room

7 1a/B-C M&E area

OFF

ICE

(BO

H)

8 1a/B I.T. Store

9 2-2a/B-C I.T. office

10 2b/B Server room

11 3/B Uniform issue

12 6/E Function room storage

13 6/H AV room

14 2/E HK manager

15 2/E-F HR. DIR. Office

16 2/E-F F&B DIR. Office

17 2/F-G Executive chef

18 1/F Working area

19 1/E Training/ meeting room

20 1a/D Corridors

SERV

ICE

AREA

(BO

H)

21 1-1a/C Security & receiving area

22 2/D Flower shop

23 2/D House keeping office

24 1/D Soiled linen room

25 1/D Valet laundry

26 1/D-E Clean linen room

27 1/C-D Trolley bay

28 3a/B Clinic

29 4/B

30 5a/B Team dinning room

31 6/B Kitchen

32 6/B-C Kitchen storage

33 6/C Staff social lounge

34 6/D Male & female prayer room

1 1/A Escape staircase S1

2 1/G Escape staircase S2

3 6/G Escape staircase S3

4 5a/D Escape staircase S4

LEVE

L 8

FACI

LITY

11 3a/C Gym

Male & female changing room, toilet

TYPI

CAL

COM

MO

N A

REA

- B

ASE

MEN

T TO

LEV

EL

36

LIFT

CO

RE &

ESC

APE

ST

AIR

CASE

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)

Page 52: Table Monitoring Progress Finsihing & MEP

MONITORING PROGRESS FINISHING - PODIUM

PODIUMLE

VEL

AREA

NO

.

GRI

D L

INE

LOCATION

LEVE

L 8

FACI

LITY

12 3/B Male, female changing room

13 3/F Swimming pool

14 3/J Pantry

15 4d/J Spiral stair

16 2a-4/B-H Deck

17 2a-7/A-D

18 2b-7/B-J Steps

19 2b-7/B-J Ramp

Roof top garden for apartment tower

PODIUM

SANITARY WARE RAILING

Actual Actual Actual ActualSTART START START START

BACK PAINTED GLASS ON LIFT LOBBY APARTMENT

BALUSTRADE / BOLLARD

Progress (%)

Progress (%)

Progress (%)

Progress (%)