C . O . P .
Montana State UniversityP.O. Box 172760Bozeman, MT 59717-2760Contact: Loras O'ToolePhone: (406) 994-7092
PROJECT TEAMOWNER
ARCHITECT
MECHANICAL
ELECTRICALArchitecture118115 East Oak StreetBozeman, MT 59715Contact: Scott StrohPhone: (406) 404-1777
Consulting Design Solutions, Inc.7540 Churchill RoadManhattan, MT 59741Contact: Curtis SmithPhone: (406) 282-7082
Consulting Design Solutions, Inc.7540 Churchill RoadManhattan, MT 59741Contact: Scott EldersPhone: (406) 282-7082
VICINITY MAP - MSU CAMPUS
PROJECTSITE
S11T
HA
VE
W.COLLEGE
PPA NO. 19-0077 ISSUED FOR BID - 15 MAY 2020
A0 COVER / GENERAL INFORMATION
DRAWING INDEX
GENERAL
ARCHITECTURALA1 PLANS, DETAILSA2 PLANS, DETAILSA3 SCHEDULES, DETAILS
ELECTRICALED1.1 BASEMENT PLAN - POWER DEMOLITIONE1.1 BASEMENT PLAN - POWER REMODELE2.1 BASEMENT PLAN - LIGHTING DEMOLITION AND REMODELE3.1 PANEL SCHEDULESE4.1 LEGENDS, SCHEDULES, DETAILS
MECHANICALMD1.1 BASEMENT PLAN - PLUMBING DEMOLITIONMD2.1 BASEMENT PLAN - HVAC DEMOLITIONM1.1 BASEMENT PLAN - PLUMBINGM2.1 BASEMENT PLAN - HVACM3.1 LEGENDS, SCHEDULES, DETAILS
GENERAL PROJECT NOTESA. ALL CONSTRUCTION AND CONSTRUCTION METHODS TO BE IN ACCORDANCE WITH APPLICABLE CODES, GOVERNMENTAL AGENCIES, AND LOCAL DESIGN
CRITERIA, INCLUDING BUT NOT LIMITED TO THE FOLLOWING:1. INTERNATIONAL BUILDING CODE, 2012 EDITION2. UNIFORM PLUMBING CODE, 2012 EDITION3. INTERNATIONAL MECHANICAL CODE, 2012 EDITION4. INTERNATIONAL FUEL GAS CODE, 2012 EDITION5. NATIONAL ELECTRICAL CODE, 2014 EDITION
B. ANY AMBIGUITIES OR DISCREPANCIES DISCOVERED BY THE USE OF THESE DRAWINGS SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY.C. CHANGES OR DEVIATIONS FROM THE CONTRACT DOCUMENTS MADE WITHOUT THE WRITTEN CONSENT OF THE ARCHITECT ARE UNAUTHORIZED. COORDINATENECESSARY MODIFICATIONS WITH THE ARCHITECT PRIOR TO CONSTRUCTION.D. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR SAFETY AND SHALL TAKE WHATEVER MEASURES ARE NECESSARY TO ENSURE THE HEALTH ANDSAFETY OF THEIR EMPLOYEES, SUBCONTRACTORS, BUILDING OCCUPANTS, PEDESTRIANS NEAR THE CONSTRUCTION SITE AND ACCESS ROUTES, AND ALL OTHERPERSONS IN AREAS AFFECTED BY THE CONTRACTOR’S CONSTRUCTION ACTIVITIES. REFER TO THE SPECIFICATIONS FOR ADDITIONAL INFORMATION.E. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION AND SCHEDULING OF ALL REQUIRED INSPECTIONS DURING THE COURSE OF THE CONSTRUCTIONPROJECT. PARTIES REQUIRED TO ATTEND SHOULD BE GIVEN A MINIMUM OF TWO WORKING DAYS NOTICE.F. THE DIMENSIONS GIVEN ON THESE PLANS FOR NEW CONSTRUCTION ARE TO THE FACE OF CONCRETE, FACE OF MASONRY, FACE OF STUD FRAMING, ANDCOLUMN CENTERS, UNLESS NOTED OTHERWISE. THE DIMENSIONS GIVEN ON THESE PLANS FOR NEW DOOR AND WINDOW UNITS ARE TO THE EDGE OF ROUGHOPENING, UNLESS NOTED OTHERWISE. DIMENSIONS TAKEN FROM EXISTING CONSTRUCTION ARE FROM THE FACE OF THE EXISTING CONSTRUCTION, UNLESSNOTED OTHERWISE. THE CONTRACTOR SHALL VERIFY THE EXISTING CONDITIONS AND PLAN DIMENSIONS PRIOR TO CONSTRUCTION AND SHALL NOTIFYARCHITECT OF ANY DISCREPANCIES.G. SHOULD THE CONTRACTOR ENCOUNTER ANY EXISTING BUILDING MATERIALS SUSPECTED OF BEING HAZARDOUS, HE SHALL CEASE WORK IN THE AREA ANDNOTIFY THE OWNER AND ARCHITECT IMMEDIATELY.
MSU CHEMISTRYBUILDING
BUILDING ENTRANCE
A. THE CONTRACTOR SHALL MINIMIZE INTERFERENCE WITH ADJOINING STREETS, SIDEWALKS, PARKING AREAS, AND OTHER ADJACENT OCCUPIED ORUSED FACILITIES DURING CONSTRUCTION OPERATIONS. THE CONTRACTOR SHALL NOT BLOCK STREETS, SIDEWALKS, OR ACCESS TO DUMPSTERLOCATIONS AT ANY TIME.
B. THE CONTRACTOR SHALL PROTECT EXISTING SITE IMPROVEMENTS AND LANDSCAPING FROM DAMAGE CAUSED BY CONSTRUCTION OPERATIONS. THECONTRACTOR SHALL RESTORE EXISTING SITE IMPROVEMENTS AND LANDSCAPING DAMAGED BY CONSTRUCTION OPERATIONS AS DIRECTED BY THEARCHITECT PRIOR TO SUBSTANTIAL COMPLETION.
C. THE CONTRACTOR SHALL PROTECT EXISTING BUILDINGS FROM DAMAGE, CONTAMINATION, AND SOILING CAUSED BY CONSTRUCTION OPERATIONS.THE CONTRACTOR SHALL KEEP BUILDING ENTRANCES, CORRIDORS, AND STAIRWELLS CLEAR OF CONSTRUCTION MATERIALS, TOOLS, AND EQUIPMENTAT ALL TIMES. THE CONTRACTOR SHALL RESTORE EXISTING BUILDINGS DAMAGED BY CONSTRUCTION OPERATIONS AS DIRECTED BY THE ARCHITECTPRIOR TO SUBSTANTIAL COMPLETION.
D. ALL CONTRACTOR VEHICLES PARKED ON CAMPUS, INCLUDING VEHICLES OWNED BY EMPLOYEES OF THE CONTRACTOR, SHALL BE PARKED IN ADESIGNATED PARKING AREA ONLY. DELIVERY VEHICLES SERVING THE PROJECT MUST BE MOVED TO A DESIGNATED PARKING AREA OR REMOVEDFROM CAMPUS IMMEDIATELY AFTER LOADING / UNLOADING. ALL VEHICLES PARKED IN DESIGNATED PARKING AREAS MUST HAVE A VALID MSU PARKINGPERMIT. (PERMITS CAN BE PURCHASED FROM THE UNIVERSITY POLICE (994-2121). VIOLATORS OF MSU VEHICLE REGULATIONS MAY BE TICKETED /TOWED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
E. CONSTRUCTION STAGING AREA: ON-SITE CONSTRUCTION STAGING FOR THIS PROJECT WILL BE EXTREMELY LIMITED. SHOULD THE CONTRACTORREQUIRE ON-SITE CONSTRUCTION STAGING, AN AREA FOR THIS PURPOSE MAY BE PROVIDED. THE STAGING AREA IS INTENDED FOR THE STORAGE OFMATERIALS AND EQUIPMENT ONLY. UNLESS DIRECTED OTHERWISE, THE CONTRACTOR WILL BE REQUIRED TO FENCE THE STAGING AREA TO PREVENTACCESS FROM UNAUTHORIZED PERSONNEL. THE CONTRACTOR SHALL RESTORE AREAS USED FOR CONSTRUCTION STAGING THAT ARE DAMAGEDDURING THE COURSE OF CONSTRUCTION OPERATIONS AS DIRECTED BY THE ARCHITECT PRIOR TO SUBSTANTIAL COMPLETION.
F. THE CONTRACTOR SHALL ACCESS THE SITE FROM SOUTH ELEVENTH AVENUE.
SITE ACCESS / STAGING
ROUTE
LIMITS OF WORK
BASEMENT FLOOR KEY PLANREV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AS
TA
TE
UN
IVE
RS
ITY
A118#19-039
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANAPHONE: 406.994.5413
FAX: 406.994.5665
EL
EC
TR
ON
MIC
RO
SC
OP
EIN
ST
AL
LA
TIO
N
MSSSBS
COVER
A0
(B) 15 MAY 20
CH
EM
IST
RY
BU
ILD
ING
RO
OM
24
PPA#19-0077
19' - 4"
21' - 4"
9 1/2"9 1/2"
31
'-7
1/8
"
29
'-5
"1
'-4
1/2
"
9 1/2"
1'-
41/2
"
95
/8"
14' - 6 1/2" 4' - 9" 10"
8'-
11
1/2
"
3'-
0"
2' - 0"
LAB
024
Room
025
NOTE: REMOVE EXISTING LOOSESTEEL COVERS, TYPICAL ATTHREE FLOOR TRENCHES.
NOTE: EXISTING ALUMINUMPARTITION / GLAZING SYSTEMWILL BE REMOVED COMPLETELYBY OWNER PRIOR TO THE STARTOF CONSTRUCTION
EXISTING CONSTRUCTIONTO REMAIN, TYPICALWHERE SHOWN THUS
SAW-CUT EXISTINGCONCRETE SLAB ASREQUIRED FOR NEW EMICABLING. CONFIRM THECUT LOCATIONS WITH THEOWNER / SUPPLIER PRIORTO COMMENCING THEWORK.
4
A1
4' - 10"
11'-3" +/-
10
'-3
1/8
"+
/-2
1'-
4"
21' - 4"
S.2
S.2
NOTE: INFILL EXISTING FLOOR TRENCHES WITHCONCRETE / GROUT - TYPICAL, THREE LOCATIONS.MAKE FLUSH WITH EXISTING CONCRETE FLOOR SLAB.
14' - 3 1/2"
MICROSCOPE
024B
EQUIPMENT
024A
LAB
024
D024-2
D024-1
NOTE: CENTER NEWPARTITION UNDER CONCRETEJOIST ABOVE - REFER TOREFLECTED CEILING PLAN
S.2
5'-
0"
.5'-0
".
NOTE: CENTER NEWPARTITION UNDER CONCRETEJOIST ABOVE - REFER TOREFLECTED CEILING PLAN
PROVIDE AND INSTALL NEWGYPSUM BOARD WALLSURFACE OVER EXISTINGWALL - FROM FLOOR TOOVERHEAD STRUCTURE
ACTIVE
PASSIVE
ACTIVE
PASSIVE
CONDUIT SLEEVE@ 120" AFF
CONDUIT SLEEVE@ 24" AFF
C LC L
A16
A16 SIM
GROUND0' - 0"
FIRST14' - 0"
A15
EXISTING CONCRETE FLOORSTRUCTURE TO REMAIN
EXISTING FRAMEDPARTITIONS TO REMAIN
EXISTING CONCRETEFLOOR SLAB TO REMAIN
NEW FRAMED PARTITION
MICROSCOPE
024B LAB
024
NOTE: SCRIBE NEW EAST-WEST PARTITIONASSEMBLY TO CONCRETE STRUCTURE ABOVEAND SEAL (MATCH EXISTING CONSTRUCTION)
FUR OUT EXISTING WALLAND PROVIDE NEW FINISH
A17
ONE LAYER "QUIETROCK EZ-SNAP"(5/8", TYPE X) EACH SIDE OF WALL
3-5/8" X 1-5/8" (20 GAUGE STRUCTURAL)STEEL STUD FRAMING @ 24" OC MAX
INTERIOR PARTITION - S.2NOTE: OFFSET OUTLETS / THROUGHPENETRATIONS IN STUD CAVITIVES.
ACOUSTICAL FIRE BATT INSULATION(ROCKWOOL AFB, 3")
SLIP-TYPE TOP TRACK - CONTINUOUS,SECURE TO CONCRETE STRUCTURE
EXISTING CONCRETE FLOORSTRUCTURE TO REMAIN
ACOUSTICAL SEALANT - CONTINUOUS,BOTH SIDES OF WALL
SILL SEALER (CLOSED-CELL FOAMTYPE)
PROVIDE "L-BEAD" TRIM - BOTH SIDESOF WALL
ACOUSTICAL SEALANT - CONTINUOUS,BOTH SIDES OF WALL
SILL SEALER (CLOSED-CELL FOAMTYPE)
EXISTING CONCRETE FLOORSTRUCTURE TO REMAIN
BOTTOM TRACK - CONTINUOUS,SECURE TO CONCRETE STRUCTURE
PROVIDE "L-BEAD" TRIM - BOTH SIDESOF WALL
EXISTING WALL
NOTE: REFER TO 5/A1 FORDESCRIPTION OF PARTITIONASSEMBLY
INTERIOR PARTITION - S.2NOTE: OFFSET OUTLETS / THROUGHPENETRATIONS IN STUD CAVITIVES.
ACOUSTICAL SEALANT - CONTINUOUS,BOTH SIDES OF WALL
SILL SEALER (CLOSED-CELL FOAMTYPE)
PROVIDE "L-BEAD" TRIM - BOTH SIDESOF WALL
NOTE: ALIGN NEW PARTITION WITHEXISTING STUD FRAMING (IF CLOSE) -COORDINATE WITH ARCHITECT
4' - 10"
11' - 2 13/16"
10
'-3
1/8
"+
/-2
1'-
4"
21' - 4"
14' - 3 1/2"
MICROSCOPE
024B
EQUIPMENT
024A
LAB
024
CHILLER(BO)
UPS (BO)
WORK STATION(BO)
ELECTRON MICROSCOPE ANDRELATED EQUIPMENT(EQUIPMENT ANDINSTALLATION BY OWNER).CONFIRM LAYOUT OFEQUIPMENT WITH OWNERAND SUPPLIER PRIOR TO ANDDURING CONSTRUCTION.
ELECTRO-MAGNETICINTERFERENCE (EMI)CANCELLATION SYSTEM(SEE NOTE ABOVE).
ELECTRO-MAGNETIC INTERFERENCE (EMI) CANCELLATION SYSTEM NOTE:SYSTEM CABLING, EQUIPMENT, AND INSTALLATION BY OWNER. CONFIRMLAYOUT OF EQUIPMENT AND CABLING WITH OWNER AND SUPPLIER DURINGTHE COURSE OF CONSTRUCTION.
8
A1
CONDUIT SLEEVE@ 120" AFF
CONDUIT SLEEVE@ 24" AFF
ONE LAYER "QUIETROCK EZ-SNAP"(5/8", TYPE X)
RESILIENT FURRING CHANNELS @ 24"OC - SECURE TO EXISTING WALL
EXISTING WALL TO REMAIN
ACOUSTICAL SEALANT - CONTINUOUS
EXISTING CONCRETE FLOORSTRUCTURE TO REMAIN
EXISTING CONCRETE FLOORSTRUCTURE TO REMAIN
ACOUSTICAL SEALANT - CONTINUOUS
PROVIDE "L-BEAD" TRIM - CONTINUOUS
PROVIDE "L-BEAD" TRIM - CONTINUOUS
EXISTING CONCRETE FLOOR SLAB
NOTE: SAW-CUT EXISTING SLAB FOR EMICABLING (3/8"x1" NOTCH MINIMUM)
FLOOR PATCH / SEALANT
NEW FLOORING - REFER TO FINISHSCHEDULE
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AS
TA
TE
UN
IVE
RS
ITY
A118#19-039
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANAPHONE: 406.994.5413
FAX: 406.994.5665
EL
EC
TR
ON
MIC
RO
SC
OP
EIN
ST
AL
LA
TIO
N
SSSS
PLANS, DETAILS
A1
(B) 15 MAY 20
CH
EM
IST
RY
BU
ILD
ING
RO
OM
24
PPA#19-0077
1/4" = 1'-0"1
FLOOR PLAN - DEMOLITION1/4" = 1'-0"
2FLOOR PLAN - NEW CONSTRUCTION
1/4" = 1'-0"4
PARTIAL BUILDING SECTION1 1/2" = 1'-0"
5WALL DETAILS (SECTION)
1 1/2" = 1'-0"6
NEW WALL @ EXISTING WALL (PLAN)
1/4" = 1'-0"3
FLOOR PLAN - EQUIPMENT
GENERAL CONSTRUCTION NOTES:
A. CONTRACTOR TO CONDUCT CONSTRUCTIONOPERATIONS IN ACCORDANCE WITH ALL LOCALAND STATE LAWS AND REGULATIONS.
B. CONTRACTOR TO CLEAN, PATCH, AND REPAIRALL EXISTING SURFACES AND FINISHES TOREMAIN THAT ARE AFFECTED BY CONSTRUCTIONOPERATIONS.
GENERAL DEMOLITION NOTES:
A. CONTRACTOR TO VERIFY FIELD CONDITIONSPRIOR TO THE START OF CONSTRUCTION.CONTRACTOR TO NOTIFY ARCHITECT OFDISCREPANCIES DISCOVERED BETWEEN FIELDCONDITIONS AND THE CONSTRUCTIONDOCUMENTS. REFER TO SPECIFICATIONS FORADDITIONAL INFORMATION AND DEFINITIONSREGARDING DEMOLITION OPERATIONS.
B. CONTRACTOR TO CONDUCT DEMOLITIONOPERATIONS AND DISPOSE OF ALL REMOVEDMATERIALS IN ACCORDANCE WITH ALL LOCAL ANDSTATE LAWS AND REGULATIONS.
C. CONTRACTOR TO CLEAN, PATCH, AND REPAIRALL EXISTING SURFACES AND FINISHES TOREMAIN THAT ARE AFFECTED BY DEMOLITIONOPERATIONS.
D. REFER TO ENGINEERING DRAWINGS FORDEMOLITION REQUIREMENTS PERTAINING TOMECHANICAL, PLUMBING, ELECTRICAL, ANDLIGHTING SYSTEMS.
E. IT IS NOT ANTICIPATED THAT ASBESTOSCONTAINING MATERIALS WILL BE ENCOUNTEREDDURING THE COURSE OF THIS PROJECT. SHOULDTHE CONTRACTOR ENCOUNTER A MATERIALSUSPECTED OF CONTAINING ASBESTOS, CEASEDEMOLITION OPERATIONS AND NOTIFY THEOWNER AND ARCHITECT IMMEDIATELY.
F. PRIOR TO THE START OF CONSTRUCTION,THE OWNER WILL REMOVED ALL LOOSEFURNITURE, CASEWORK, AND EQUIPMENT FROMTHE WORK AREA.
1 1/2" = 1'-0"7
WALL FURRING6" = 1'-0"
8SLAB SAW-CUT
AL
TE
RN
AT
E1
AL
TE
RN
AT
E1
LAB
024
EQUIPMENT
024A
MICROSCOPE
024B
NOTE: CENTER NEWPARTITION UNDER CONCRETEJOIST ABOVE
NOTE: CENTER NEWPARTITION UNDER CONCRETEJOIST ABOVE
NOTE: EXISTING CONCRETESTRUCTURE ABOVE ROOM 024B TO BECLEANED, PRIMED, AND PAINTED.
NOTE: PROVIDE AND INSTALL ANARRANGEMENT OF UNISTRUT FRAMINGMEMBERS - ALIGN MEMBERS WITH LOCATIONOF MICROSCOPE CABINET BELOW
NOTE: PROVIDE CORRUGATED FIBERGLASS PANELLOCATED DIRECTLY ABOVE MICROSCOPE CABINETTO GUARD EQUIPMENT FROM OVERHEAD LEAKS(AS DRAWN, AREA IS APPROXIMATELY 4'-6" X 9'-0")
5' - 5" +/-
4'-
0"
OC
TY
P.
MICROSCOPE
024B
EQUIPMENT
024A
LAB
024
A2 3
6
5
4
PROVIDE AND INSTALL NEW FLOORING,TYPICAL WHERE SHOWN THUS - REFERTO ROOM FINISH SCHEDULE.
GROUNDING STRIPCONNECTION
GROUNDING STRIPCONNECTION
GROUND0' - 0"
FIRST14' - 0"
UNISTRUT FRAMEWORK -REFER TO REFLECTED CEILINGPLAN
EXISTING CONCRETE FLOORSTRUCTURE
RESILIENT BASE
GYPSUM BOARD WALLSURFACE - PAINT
7'-
2"
10
'-0"
MIN
.
ELECTRO-MAGNETICINTERFERENCE (EMI)CANCELLATION SYSTEM
FIBERGLASS PANEL
IP-1
IP-3
GROUND0' - 0"
FIRST14' - 0"
10
'-0"
MIN
.
UNISTRUT FRAMEWORK -REFER TO REFLECTED CEILINGPLAN
EXISTING CONCRETE FLOORSTRUCTURE
RESILIENT BASE
GYPSUM BOARD WALLSURFACE - PAINT
ELECTRO-MAGNETICINTERFERENCE (EMI)CANCELLATION SYSTEM
FIBERGLASS PANEL
IP-1
IP-3
GROUND0' - 0"
FIRST14' - 0"
UNISTRUT FRAMEWORK -REFER TO REFLECTED CEILINGPLAN
EXISTING CONCRETE FLOORSTRUCTURE
RESILIENT BASE
GYPSUM BOARD WALLSURFACE - PAINT
10
'-0"
MIN
.
ELECTRO-MAGNETICINTERFERENCE (EMI)CANCELLATION SYSTEM
FIBERGLASS PANEL
IP-1
IP-3
GROUND0' - 0"
FIRST14' - 0"
UNISTRUT FRAMEWORK -REFER TO REFLECTED CEILINGPLAN
EXISTING CONCRETE FLOORSTRUCTURE
RESILIENT BASE
GYPSUM BOARD WALLSURFACE - PAINT
10
'-0"
MIN
.
ELECTRO-MAGNETICINTERFERENCE (EMI)CANCELLATION SYSTEM
FIBERGLASS PANEL
IP-1
IP-3
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AS
TA
TE
UN
IVE
RS
ITY
A118#19-039
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANAPHONE: 406.994.5413
FAX: 406.994.5665
EL
EC
TR
ON
MIC
RO
SC
OP
EIN
ST
AL
LA
TIO
N
SSSS
PLANS, DETAILS
A2
(B) 15 MAY 20
CH
EM
IST
RY
BU
ILD
ING
RO
OM
24
PPA#19-0077
1/4" = 1'-0"1
REFLECTED CEILING PLAN - NEWCONSTRUCTION
GENERAL NOTES, REFLECTED CEILING PLAN:
A. REFER TO ENGINEERING DRAWINGS FORINFORMATION PERTAINING TO MECHANICAL,PLUMBING, ELECTRICAL, AND LIGHTING SYSTEMS.
B. IN ROOM 024B, ALL OVERHEAD MECHANICALDUCTWORK, PIPING, AND ELECTRICAL CONDUITSTO BE CLEANED.
1/4" = 1'-0"2
FLOOR PLAN - ROOM FINISH
1/4" = 1'-0"3
INTERIOR ELEVATION1/4" = 1'-0"
4INTERIOR ELEVATION
1/4" = 1'-0"5
INTERIOR ELEVATION1/4" = 1'-0"
6INTERIOR ELEVATION
GENERAL NOTES, ROOM FINISH PLAN:
A. REFER TO REFLECTED CEILING PLAN FORREQUIREMENTS PERTAINING TO OVERHEAD PAINTWORK.
B. NEW FLOORING IN ROOM 024B IS STATICDISSIPATIVE TYPE FLOORING. COORDINATE THEINSTALLATION AND CONNECTION OF GROUNDINGSTRIPS WITH ELECTRICAL.
PPA # : 19-0077
REV. DESCRIPTION DATE
REVIEWED BY: SS
DRAWN BY: SS
SHEET
CH
EMIS
TRY
BU
ILD
ING
RO
OM
24
- ELE
CTR
ON
MIC
RO
SCO
PE IN
STA
LLAT
ION
MO
NTA
NA
STAT
E U
NIV
ER
SIT
Y
DATE(IFB)15 MAY 20
SHEET TITLE
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANAPHONE: 406.994.5413
FAX: 406.994.5665
A118 # : 19-039
N
N
E
AN AM
MAZOB
O T
MONTANA
E OT
TAF
S
LI CENS
E
HE ARCI T
C
D
T
SCOTT B. STROH# 1988
JUNE 30, 2020
architecture one eighteen115 east oak street bozeman mt 59715
HINGES, PIVOTS1 = STANDARD-WEIGHT, BALL BEARING (BOD PRODUCT: HAGER COMPANIES; BB 1191)
MECH. LOCKS, LATCHES1 = GRADE 1 CYLINDRICAL LEVERS (BOD PRODUCT: BEST 9K SERIES WITH 15D TRIM)
AUXILIARY LOCKSNONE
ELECTRONIC HARDWARENONE
BOLTS1 = FLUSH-MOUNT, TOP ONLY (BOD PRODUCT: IVES 262)
EXIT DEVICESNONE
OPERATING TRIMNONE
ACCESSORIES FOR PAIRS1 = ASTRAGAL, PASSIVE LEAF (BOD PRODUCT: NGP 139A; ALUMINUM, ANODIZED)2 = ASTRAGAL, PASSIVE LEAF (BOD PRODUCT: NGP 109A; ALUMINUM, ANODIZED)
CLOSERSNONE
STOPS, HOLDERSNONE
GASKETING, SEALS1 = BOD PRODUCT: NGP 5025CL (HEAD AND JAMBS, CLEAR);
BOD PRODUCT: NGP 5070CL (MEETING STILES, CLEAR)
BOTTOMS, SWEEPS1 = BOD PRODUCT: NGP 420NA (ALUMINUM, ANODIZED)
THRESHOLDS1 = BOD PRODUCT: NGP 512 (ALUMINUM, MILL FINISH)
PROTECTIVE TRIMNONE
AUXILIARY HARDWARENONE
HARDWARE DESCRIPTIONS
2" D. WIDTH 2"
DOOR
HEI
GHT
2"
DOOR
HEI
GHT
2"
2" DOOR WIDTH 2"
A1 B1
HOLLOW METAL FRAMES, TYPICAL -REFER TO SCHEDULE / SPECIFICATIONS
ROOM SIGNAGE (WHERE SCHEDULED)
MULLION (WHERE SCHEDULED)
DOOR
HEI
GHT
D. WIDTH DOOR WIDTH
DOOR
HEI
GHT
A1 B1
FLUSH DOORS, TYPICAL - REFER TOSCHEDULE / SPECIFICATIONS
DETAILS REMARKS
NU
MBE
R
WID
TH
HEI
GH
T
THIC
KNES
S
SWIN
G
MAT
ERIA
L
FIN
ISH
ELEV
ATIO
N D
ETAI
LR
EFER
TO
1/A
3
MAT
ERIA
L
FIN
ISH
WAL
LTH
ICKN
ESS
ELEV
ATIO
N D
ETAI
LR
EFER
TO
2/A
3
SEC
TIO
N D
ETAI
LR
EFER
TO
3A/
A3
HIN
GES
, PIV
OTS
MEC
H. L
OC
KS, L
ATC
HES
AUXI
LIAR
Y LO
CKS
ELEC
TRO
NIC
HAR
DW
ARE
BOLT
S
EXIT
DEV
ICES
OPE
RAT
ING
TR
IM
ACC
ESSO
RIE
S FO
R P
AIR
S
CLO
SER
S
STO
PS, H
OLD
ERS
GAS
KETI
NG
, SEA
LS
BOTT
OM
S, S
WEE
PS
THR
ESH
OLD
S
PRO
TEC
TIVE
TR
IM
AUXI
LIAR
Y H
ARD
WAR
E
HAR
DW
ARE
FIN
ISH
, UN
O
HAR
DW
ARE
FUN
CTI
ON
ACC
ESSI
BLE
DO
OR
RAT
ING
GLA
ZIN
G
SIG
NAG
E
D024-1 6-0 7-0 1-3/4" PR WD FF-S B1 STL IP-2 4-7/8" B1 HM1 1 1 - - 1 - - 1 - - 1 - - - - 3 3 N - - - 4A/A3 DOOR, FRAME, AND HARDWARE IS PART OF ALTERNATE 1D024-2 6-0 7-0 1-3/4" PR WD FF-S B1 STL IP-2 4-7/8" B1 HM1 1 1 - - 1 - - 2 - - 1 1 1 - - 3 3 N - - - 4B/A3 ….
SCHEDULE ABBREVIATIONS HARDWARE FINISH HARDWARE FUNCTION GLAZING
ALUM = ALUMINUM 1 = US10B / 613 OIL RUBBED BRONZE 1 = PASSAGE LATCH, ANSI F75 1 = LOW-E INSULATING, DOOR MFR'S. STD.ANOD = ANODIZED 2 = US15 / 619 SATIN NICKEL 2 = PRIVACY LOCK, ANSI F76 2 = SINGLE GLAZING, DOOR MFR'S. STD.
BOD = BASIS OF DESIGN 3 = US26D / 626 SATIN CHROME 3 = ENTRANCE / OFFICE LOCK, ANSI F82 3 = D-H-60, 100 SQUARE INCHES MAX.EP = EXTERIOR PAINT 4 = US32D / 630 SATIN STAINLESS STEEL 4 = ENTRANCE LOCK, ANSI F109
ETR = EXISTING TO REMAIN 5 = CLASSROOM LOCK, ANSI F84FF-P = FACTORY FINISHED PAINT 6 = STOREROOM LOCK, ANSI F86FF-S = FACTORY FINISHED STAIN 7 = EXIT LOCK, ANSI F89
HM = HOLLOW METAL GENERAL NOTESIP = INTERIOR PAINT
LAM = LAMINATE 1 = REFER TO TECHNICAL SPECIFICATIONS FOR DETAILED INFORMATION REGARDING FRAMES, DOORS, AND HARDWARE.LH = LEFT HAND 2 = ALL DOOR INSTALLATIONS SHALL MEET REQUIREMENTS OF APPLICABLE CODES.
LHR = LEFT HAND REVERSE 3 = ALL GLAZING INSTALLED IN OR ADJACENT TO DOORS SHALL MEET REQUIREMENTS OF APPLICABLE CODES.OH = OVERHEAD 4 = AT A MINIMUM, PROVIDE DOOR SILENCERS AT HOLLOW METAL FRAMES. WHERE SCHEDULED OR DETAILED, PROVIDE GASKETING OR SEALS IN LIEU OF SILENCERS.PR = PAIR 5 = COORDINATE ALL CYLINDER, CORE, KEYING, AND AUTOMATED ACCESS REQUIREMENTS WITH OWNER.RH = RIGHT HAND 6 = AT FIRE AND/OR SMOKE RATED DOORS, PROVIDE GASKETING, SEALS, BOTTOMS, SWEEPS, THRESHOLDS, AND ASTRAGALS AS SCHEDULED, AS DETAILED, OR AS REQUIRED BY CODE.
RHR = RIGHT HAND REVERSE 7 = ALL EXTERIOR HOLLOW METAL DOORS TO BE INSULATED. ALL OVERHEAD DOORS TO BE INSULATED.STL = STEEL 8 = MULLION MATERIAL AND FINISH TO MATCH FRAME MATERIAL AND FINISH, UNLESS NOTED OTHERWISE.WD = WOOD - SOLID OR SOLID CORE 9 = CONTRACTOR TO VERIFY ALL WALL THICKNESSES PRIOR TO ORDERING FRAMES.
DOOR, FRAME, AND HARDWARE SCHEDULEDOOR FRAME MISCELLANEOUSHARDWARE ROOM BASE REMARKS
MAT
ERIA
LS
AND
/OR
FIN
ISH
ES
TRAN
SITI
ON
SR
EFER
TO
5/A
3
MAT
ERIA
LS
AND
/OR
FIN
ISH
ESR
EFER
TO
6/A
3
MAT
ERIA
LS
AND
/OR
FIN
ISH
ES(G
ENER
AL)
TEXT
UR
E
SHEE
N
WAI
NSC
OT
REF
ER T
O …
.
MIS
CEL
LAN
EOU
S TR
IM
MAT
ERIA
LS
AND
/OR
FIN
ISH
ES(G
ENER
AL)
TEXT
UR
E
SHEE
N
HEI
GH
T
SHEL
VIN
G
CAB
INET
S
CO
UN
TER
TOPS
ELEC
T. D
EVIC
ES
AND
CO
VER
S
024 ETR - RB-1 GB, IP-1 1 2 - - NONE - - - - - - 1024A ETR - RB-1 GB, IP-1 1 2 - - NONE - - - - - - 1024B SVT-1 - RB-1 GB, IP-1 1 2 - - IP-3 - 1 - - - - 1 OVERHEAD CONCRETE STRUCTURE TO BE PAINTED
SCHEDULE ABBREVIATIONS FIXTURES AND ACCESSORIES
APC = ACOUSTICAL PANEL CEILING 1 = PLUMBING FIXTURES: WHITE PORCELAINC = CONCRETE 2 = FAUCETS AND VALVES: CHROME
CT = CERAMIC TILING 3 = TOILET ROOM ACCESSORIES: SATIN STAINLESS NO. 4EB = EDGEBANDING
ETR = EXISTING TO REMAIN GENERAL FINISH NOTESFRP = FIBERGLASS REINFORCED PLASTIC
GB = GYPSUM BOARD 1 = ALL FINISH ASSEMBLIES SHALL MEET REQUIREMENTS OF APPLICABLE CODES.IP = INTERIOR PAINT 2 = CENTER ALL FLOORING TRANSITIONS BELOW DOORS, UNLESS INDICATED OTHERWISE.PL = PLASTIC LAMINATE 3 = ALL EXPOSED DUCTWORK, PIPING, AND CONDUIT TO BE PAINTED, UNLESS NOTED OTHERWISE.RB = RESILIENT BASE 4 = PROVIDE CEMENTITIOUS OR GYPSUM TILE BACKER PANELS BEHIND TILE WALL FINISHES.
RFT = RUBBER FLOOR TILE 5 =RSF = RUBBER SHEET FLOORINGRMA = RESILIENT MOLDING ACCESSORY 6 =RSA = RESILIENT STAIR ACCESSORY
SC = SHEET CARPETING 7 =SVT = SOLID VINYL FLOOR TILETC = TILE CARPETING
VCT = VINYL COMPOSITION FLOOR TILEVSF = VINYL SHEET FLOORINGWD = WOOD
SCHEDULE LEGEND
TEXTURES1 = SMOOTH, LEVEL 42 = ORANGE PEEL3 = KNOCK DOWN
SHEENS1 = FLAT2 = SATIN3 = SEMIGLOSS
SHELVINGNONE
CABINETSNONE
COUNTERTOPSNONE
DEVICES AND COVERS1 = GRAY DEVICES / STAINLESS COVERS
INTERIOR GYPSUM BOARD PANELS INSTALLED ON CEILING SURFACES SHALL MATCH TYPE INSTALLED ON WALL SURFACES WITHIN THE SAME SPACE, UNLESS NOTED OTHERWISE.
FLOORS WALLS CEILINGSROOM FINISH SCHEDULE
MISC.
FINAL MANUFACTURER, PRODUCT, STYLE, AND COLOR SELECTIONS WILL BE DETERMINED / CONFIRMED DURING THE SUBMITTAL PROCESS.REFER TO INDIVIDUAL DIVISION 9 SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION REGARDING FINISHES.
HOLLOW METAL FRAME - REFER TOSCHEDULE
HOLLOW METAL OR WOOD DOOR - REFERTO SCHEDULE
HOLLOW METAL FRAME - REFER TOSCHEDULE, PROVIDE APPROPRIATEANCHORS
HOLLOW METAL OR WOOD DOOR - REFERTO SCHEDULE
GASKETING OR SEALS AS SCHEDULED
GASKETING OR SEALS AS SCHEDULED
HEAD SECTION
JAMB SECTION
SILL SECTION
MULLION, ASTRAGAL,MEETING STILES
ACCESSORIES, GASKETING OR SEALS ASSCHEDULED
INTERIOR PARTITION - REFER TO 5/A1
GYPSUM BOARD - REFER TO 5/A1
INSULATION - MATCH PARTITIONINSULATION
SUBFLOOR (EXISTINGCONCRETE SLAB)
INSULATION - MATCH PARTITIONINSULATION
FINISH FLOORING - REFER TOROOM FINISH SCHEDULE BOTTOMS OR SWEEPS AS SCHEDULED
THRESHOLD AS SCHEDULED - SET INSEALANT
INTERIOR PARTITION - REFER TO 5/A1
HOLLOW METAL FRAME - REFER TOSCHEDULE
HOLLOW METAL OR WOOD DOOR - REFERTO SCHEDULE
GYPSUM BOARD - REFER TO 5/A1
HOLLOW METAL FRAME - REFER TOSCHEDULE, PROVIDE APPROPRIATEANCHORS
HOLLOW METAL OR WOOD DOOR - REFERTO SCHEDULE
GASKETING OR SEALS AS SCHEDULED
INSULATION - MATCH PARTITIONINSULATION
GASKETING OR SEALS AS SCHEDULED
HEAD SECTION
JAMB SECTION
SILL SECTION
SUBFLOOR (EXISTINGCONCRETE SLAB)
MULLION, ASTRAGAL,MEETING STILES
ACCESSORIES, GASKETING OR SEALS ASSCHEDULED
INSULATION - MATCH PARTITIONINSULATION
BASIS OF DESIGN MANUFACTURERS / PRODUCTS: RESILIENT BASE:
RB-1 = JOHNSONITE | TARKETT; RUBBER TOED (COVE) BASE; 4 INCH; COLOR – TO BE DETERMINED
STATIC-DISSIPATIVE SOLID VINYL FLOOR TILE: SVT-1 = JOHNSONITE | TARKETT; iQ GRANIT SD; COLOR – TO
BE DETERMINED
PAINT COLORS: IP-1 = SHERWIN-WILLIAMS; SW 6385 DOVER WHITE IP-2 = SHERWIN-WILLIAMS; SW 6082 COBBLE BROWN IP-3 = TO BE DETERMINED
SCALE: 1/4" = 1'-0"2 DOOR FRAME ELEVATIONS
SCALE: 1/4" = 1'-0"1 DOOR ELEVATIONS
SCALE: 3" = 1'-0"4B DOOR DETAILSSCALE: 3" = 1'-0"4A DOOR DETAILS
SCHEDULESDETAILS
A3NOT USED
NOT USED
NOT USED
NOT USED
WALL THICKNESS + 1"
1/2" 1/2"
2" 2"
HOLLOW METAL FRAME (DOUBLERABBET, WELDED) WITH LOCK-IN STEELOR WOOD STUD ANCHORS
HOLLOW METAL OR WOOD DOOR - REFERTO SCHEDULEHM1
JAMB SECTION SHOWN(HEAD SECTION SIM.)
SCALE: 3" = 1'-0"3A DOOR FRAME SECTIONS
WALL THICKNESS + 1"
1/2" 1/2"
2"
HOLLOW METAL FRAME (DOUBLERABBET, WELDED) WITH LOCK-IN STEELOR WOOD STUD ANCHORS
SINGLE GLAZING (1/4" CLEAR) - SET INSEALANT OR PROVIDE GLAZINGGASKETSHM2
JAMB SECTION SHOWN(HEAD AND SILL SECTIONS SIM.)
REMOVABLE GLAZING STOPS
SCALE: 3" = 1'-0"3B WINDOW FRAME SECTIONS
4" 4"
BSUBFLOOR
FACE
OF
WAL
L, CA
BINE
T,ET
C.
RESILIENT BASE(RUBBER, 1/8", COVE)
RESILIENT FLOORING ORCONCRETE
SCALE: 6" = 1'-0"6 RESILIENT BASE
SUBFLOORAJOHNSONITE
RRS-XX-C OR SIM.
FINISHED CONCRETE
RESILIENT TRANSITION STRIPRESILIENT OR OTHER THINNERFLOORING
NOTE: LOCATE FLOORING TRANSITIONS BELOW DOORS, UNLESS INDICATED OTHERWISE ON PLANS.
NOTE: WHERE APPROPRIATE, FLOAT SUBFLOOR AS REQUIRED TO ENSURE TRANSITIONS ARE AS FLUSH AS POSSIBLE.
SCALE: 6" = 1'-0"5 FLOORING TRANSITIONS
Room
024
Room
025
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
CDCLS
##DESCRIPTION DD/MM
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MS
U C
HE
MIS
TR
Y E
LE
CT
RO
NM
ICR
OS
CO
PE
PPA# 19-0077
A118# 19-039
CDS# 1936
(IFB) 15 MAY 20
BASEMENT PLAN - PLUMBING DEMOLITION
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
BASEMEN PLAN-PLUMBING DEMO
MD1.1
Room
024
Room
025
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
CDCLS
##DESCRIPTION DD/MM
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MS
U C
HE
MIS
TR
Y E
LE
CT
RO
NM
ICR
OS
CO
PE
PPA# 19-0077
A118# 19-039
CDS# 1936
(IFB) 15 MAY 20
BASEMENT PLAN - HVAC DEMOLITION
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
BASEMEN PLAN-PLUMBING DEMO
MD2.1
MICROSCOPE
024B
EQUIPMENT
024A
LAB
024
3
M3.1
2
M3.1
4
M3.1
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
CDCLS
##DESCRIPTION DD/MM
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MS
U C
HE
MIS
TR
Y E
LE
CT
RO
NM
ICR
OS
CO
PE
PPA# 19-0077
A118# 19-039
CDS# 1936
(IFB) 15 MAY 20
BASEMENT PLAN - PLUMBING
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
BASEMEN PLAN-PLUMBING
M1.1
MICROSCOPE
024B
EQUIPMENT
024A
LAB
024
A
M2.1
1
M3.1
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
CDCLS
##DESCRIPTION DD/MM
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MS
U C
HE
MIS
TR
Y E
LE
CT
RO
NM
ICR
OS
CO
PE
PPA# 19-0077
A118# 19-039
CDS# 1936
(IFB) 15 MAY 20
BASEMENT PLAN - HVAC
SCALE: 1/4" = 1'-0" (24X36 SHEETS)
N
BASEMEN PLAN-HVAC
M2.1SECTION A PLAN-HVAC
SCALE: 1/4" = 1'-0"
A
M2.1
A
M3.1
1
M2.1
FLEX LAB EXHAUST DUCT DETAIL
NO SCALE
1
M3.1
THREE WAY COIL DETAIL
NO SCALE
2
M3.1
PIPE HANGER DETAIL
NO SCALE
3
M3.1
HASKRIS WATER COOLED CHILLER DETAIL
NO SCALE
4
M3.1
REV. DESCRIPTION DATE
REVIEWED BY:
DRAWN BY:
SHEET
DATE
SHEET TITLE
MO
NT
AN
AST
AT
E U
NIV
ER
SIT
Y
CDCLS
##DESCRIPTION DD/MM
MSU-CPDCMONTANA STATE UNIVERSITY
BOZEMAN, MONTANA
PHONE: 406.994.5413
FAX: 406.994.5665
MS
U C
HE
MIS
TR
Y E
LE
CT
RO
NM
ICR
OS
CO
PE
PPA# 19-0077
A118# 19-039
CDS# 1936
(IFB) 15 MAY 20
M3.1
MECHANICALLEGEND SCHEDULEAND DETAILS
MECHANICAL DETAILS AND SCHEDULES
NO SCALE
AIR FLOW SCHEMATIC
NO SCALE
225
DESCRIPTION DESCRIPTION
AMPS POLES Category VA # A B C # VA Category AMPS POLES20 1 SPARE 1 0 2 RACEWAY - 22 20 1
20 1 SPARE 3 0 4 RACEWAY - 22 20 1
20 1 SPARE 5 4160 6 4160 (N)ELECTRON MICROSCOPE RM 24 VIA XFMR & UPS 50 3
20 1 (E)RACEWAY 24 7 4160 8 4160 ---- - -
20 1 SPARE 9 0 10 (N)SPARE 20 1
20 1 (E)RACEWAY 24 11 1290 12 1290 (E)CHILLER - 24 30 3
20 1 (E)WALL - 24 13 1290 14 1290 ---- - -
20 1 (E)WALL - 24 15 0 16 ---- - -
20 1 (E)WALL - 24 17 0 18 SPARE 20 1
20 1 (E)WALL - 24 19 0 20 SPARE 20 1
20 1 (E)WALL - 5F 21 0 22 SPARE 20 1
20 1 (E)WALL - 5F 23 0 24 SPARE 20 1
20 1 (E)LIGHTS - 24 25 0 26 SPARE 20 1
20 1 SPARE 27 0 28 SPARE 20 1
20 1 SPARE 29 0 30 SPARE 20 1
20 1 SPARE 31 0 32 SPARE 20 1
20 1 SPARE 33 0 34 SPARE 20 1
20 1 SPARE 35 0 36 PROVISION
20 1 SPARE 37 0 38 PROVISION
20 1 SPARE 39 0 40 PROVISION
20 1 CONV - RCPT 41 0 42 PROVISION
5450 0 5450
TOTAL LOADS: 10900 VA
DEMAND:
30 AMPS
PANEL LPOB - REMODEL AMPS MLO 208Y/120V VOLT 3 PHASE 4 WIRE FLUSH MOUNTING
BREAKER CIRCUIT PHASE LOADS CIRCUIT BREAKER
600
DESCRIPTION DESCRIPTION
AMPS POLES Category VA # A B C # VA Category AMPS POLES50 2 DISC SW 28 1 0 2 DISC SW 28 50 2
- - - 3 0 4 - - -
50 2 DISC SW 28 5 0 6 DISC SW 28 50 2
- - - 7 0 8 - - -
50 2 DISC SW 28 9 0 10 (X)X-RAY DISC - 24 100 3
- - - 11 0 12 - - -
50 2 DISC SW 28 13 0 14 - - -
- - - 15 0 16 (X)X-RAY DISC - 24 100 3
50 2 DISC SW 28 17 0 18 - - -
- - - 19 0 20 - - -
50 2 DISC SW 28 21 0 22 CHILLER (MECH RM) 60 3
- - - 23 0 24 - - -
50 2 DISC SW 28 25 0 26 - - -
- - - 27 0 28 SPARE 20 1
50 2 DISC SW 28 29 0 30 CHILLER 6A (FUTURE) 30 2
- - - 31 0 32 - - -
50 2 DISC SW 28 33 0 34 CHILLER 6A (FUTURE) 30 2
- - - 35 0 36 - - -
50 3 DISC SW 28 37 0 38 HELIUM ? (MECH RM) 60 3
- - - 39 0 40 - - -
- - - 41 0 42 - - -
0 0 0
TOTAL LOADS: 0 VA
DEMAND:
0 AMPS
PANEL LPOM - EXISTING MLO 208Y/120V VOLT 3 PHASE 4 WIRE FLUSH MOUNTING
BREAKER CIRCUIT PHASE LOADS CIRCUIT BREAKER
225A
DESCRIPTION DESCRIPTION
AMPS POLES Category VA # A B C # VA Category AMPS POLES20 1 (X)RACEWAY 24 1 0 2 RACEWAY - 22 20 1
20 1 (X)RACEWAY 24 3 0 4 RACEWAY - 22 20 1
20 1 (X)RACEWAY 24 5 0 6 (X)CHILLER - 24 30 3
20 1 (E)RACEWAY 24 7 0 8 ---- - -
20 1 (X)RACEWAY 24 9 0 10 ---- - -
20 1 (E)RACEWAY 24 11 0 12 CHILLER - 24 30 3
20 1 (E)WALL - 24 13 0 14 ---- - -
20 1 (E)WALL - 24 15 0 16 ---- - -
20 1 WALL - 24 17 0 18 SPARE 20 1
20 1 (E)WALL - 24 19 0 20 SPARE 20 1
20 1 WALL - 5F 21 0 22 SPARE 20 1
20 1 WALL - 5F 23 0 24 SPARE 20 1
20 1 LIGHTS - 24 25 0 26 SPARE 20 1
20 1 SPARE 27 0 28 SPARE 20 1
20 1 SPARE 29 0 30 SPARE 20 1
20 1 SPARE 31 0 32 SPARE 20 1
20 1 SPARE 33 0 34 SPARE 20 1
20 1 SPARE 35 0 36 PROVISION
20 1 SPARE 37 0 38 PROVISION
20 1 SPARE 39 0 40 PROVISION
20 1 CONV - RCPT 41 0 42 PROVISION
0 0 0
TOTAL LOADS: 0 VA
DEMAND:
0 AMPS
PANEL LPOB - EXISTING AMPS MLO 208Y/120V VOLT 3 PHASE 4 WIRE FLUSH MOUNTING
BREAKER CIRCUIT PHASE LOADS CIRCUIT BREAKER