  • 5/21/2018 T 2171 - Diesel Storage Tank

    1/3

    TORISHIMA-COLENCO/EDF-LILAMA 18 Co.

    CONSORTIUM

    UNIT 605, 6/F., TOWER II, ENTERPRISE SQUARE, Tel : 2795 1838

    9 SHEUNG YUET ROAD, KOWLOON BAY, KOWLOON, HONG KONG Fax: 2754 3293

    Please sign and return Date Signatureone copy of this transmittal to the sender.

    TransmittalTo : LILAMA, Corporation Head Office Ref: THK/CM1/LI/T-2171

    Ca Mau Power Project Page : 1of 2

    Address Block 13-24, A11, Ca Mau New Urban, Zone 6, Ward 1, Date: 20t June 2007

    Ca Mau City, Ca Mau Province, Vietnam Contact: Sumeth Yamclee

    Telephone +84 (780) 591 091 Tel : 0 912 144 063

    Fax +84 (780) 591 092 0 780 217 261 / 262

    Attention Mr. Le Van Tuan, Project Director Fax: 0780 864 577

    Mr. Erhard Kuester, Project Manager [email protected]

    E-mail [email protected]

    [email protected]

    Ca Mau 1 - 750MW Combined Cycle Power Plant

    ENGINEERING DOCUMENT SUBMISSION

    No. Document No. Rev. Purp Document TitleNo.

    Copy

    1 DRCS-Lot 3-C-0864 Reply to Comment Sheet 12 + soft

    2 CM1-L3-C-10UEJ-55-000006-004 B A Diesel Storage TankDetail of Shell Plate Arrangement

    12 + soft

    3 CM1-L3-C-10UEJ-55-000006-005 B ADiesel Storage Tank

    Detail of Bottom Plate Arrangement12 + soft

    4 CM1-L3-C-10UEJ-55-000006-006 B ADiesel Storage Tank

    Detail of Roof Plate Arrangement12 + soft

    5 CM1-L3-C-10UEJ-55-000006-007 B A

    Diesel Storage Tank

    Detail of Internal Rafter and Column

    Details .Sht 1

    12 + soft

    6 CM1-L3-C-10UEJ-55-000006-008 B ADiesel Storage Tank

    Detail of Internal Rafter and Column

    Details .Sht 2

    12 + soft

    7 CM1-L3-C-10UEJ-55-000006-010 0 FCDiesel Storage Tank

    Detail of 30Shell Manhole12 + soft

    8 CM1-L3-C-10UEJ-55-000006-011 0 FCDiesel Storage Tank

    Detail of 30Roof Manhole12 + soft

    9 CM1-L3-C-10UEJ-55-000006-013 0 FCDiesel Storage Tank

    Detail of Nozzles (Sht 1)12 + soft

    mailto:[email protected]:[email protected]:[email protected]
  • 5/21/2018 T 2171 - Diesel Storage Tank

    2/3

    Please sign and return Date Signatureone copy of this transmittal to the sender.

    Ref: THK/CM1/LI/T-2171

    Page : 2 of 2

    10 CM1-L3-C-10UEJ-55-000006-014 0 FCDiesel Storage Tank

    Detail of Nozzles (Sht 2)

    12 + soft

    11 CM1-L3-C-10UEJ-55-000006-015 0 FCDiesel Storage Tank

    Detail of Nozzles (Sht 3)12 + soft

    12 CM1-L3-C-10UEJ-55-000006-017 0 FCDiesel Storage Tank

    Detail of Level Indicator (N-16 A,B,C)12 + soft

    13 CM1-L3-C-10UEJ-55-000006-018 0 FC

    Diesel Storage Tank

    Layout for Spiral Stairway and Roof

    Handrail and Earth Lug Detail

    12 + soft

    14 CM1-L3-C-10UEJ-55-000006-019 0 FCDiesel Storage Tank

    Detail of Spiral Stairway-Sheet 112 + soft

    15 CM1-L3-C-10UEJ-55-000006-020 0 FCDiesel Storage Tank

    Detail of Spiral Stairway-Sheet 2

    12 + soft

    16 CM1-L3-C-10UEJ-55-000006-021 0 FCDiesel Storage Tank

    Detail of Spiral Stairway-Sheet 312 + soft

    17 CM1-L3-C-10UEJ-55-000006-022 0 FCDiesel Storage Tank

    Detail of Vertical Ladder -Sheet 112 + soft

    18 CM1-L3-C-10UEJ-55-000006-023 0 FCDiesel Storage Tank

    Detail of Vertical Ladder -Sheet 212 + soft

    Best regards,

    For and on behalf of Torishima Consortium

    Site ManagerChristian Lemagny

    Copy: Lilama Corporation Site Office (1+1 soft copy)

    Purpose: A: For Approval

    R: For reference

    FC: For Construction

    AB: As Built

  • 5/21/2018 T 2171 - Diesel Storage Tank