SYSTEM OPERATION REPORT

FOR THE MONTH OF

MARCH-2021

SSLLDDCC

STATE LOAD DESPATCH CENTRE: RAIPUR

CHHATTISGARH STATE POWER TRANSMISSION COMPANY LIMITED

(C.G. Govt. Undertaking) PHONE: 0771 – 2574172 FAX NO. 0771- 2574174

Website: www.sldccg.com Email - [email protected]

Table of Contents

1. Installed Generation Capacity of CSPGCL and Central sector shares

as on 31.03.2021.

2. CSPGCL generation (Ex-Bus) in Mus.

3. Water Level of Major Reservoirs for last day of the month in Mtrs.

4. Demand Pattern.

5. Frequency Profile.

6. Voltage Profile.

7. Addition of new grid elements.

8. Units Decommissioned.

9. Planned Outages of Generating Stations.

10. Forced Outages Of State Generating Stations.

11. Shutdown of Transmission Elements.

12. Trippings in Transmission Elements.

13. Grid Disturbance.

14. Load Shedding.

15. Overloading of ICTs under N-1 Contingency.

List of Figures

Figure-1: Thermal generation [Ex-Bus] of CSPGCL in Mar-2021.

Figure-2: Hydel generation [Ex-Bus] of CSPGCL in Mar-2021.

Figure-3: Water level of reservoirs of CSPGCL in Mar-2021.

Figure-4: Load Curve on Peak Demand day.

Figure-5: Load Curve on Minimum Demand day.

Figure-6: Daily Maximum Demand Met in Feb-2020, Mar-2021&

Mar-2020.

Figure-7: Day wise Maximum & Minimum Demand Met in

Mar-2021.

Figure-8: Day wise Maximum Restricted Vs Unrestricted Demand

Met in Mar-2021.

Figure-9: Load Duration Curve for the month of Mar-2021.

Figure-10: Frequency Profile for the month of Mar-2021.

Figure-11: Frequency Duration Curve for the month of Mar-2021.

Figure-12-14: Voltage Profile of 400 KV Substations for the month of

Mar-2021.

Figure-15 to 19: Voltage Profile of 220 KV Substations for the month of

Mar-2021.

Ownership Thermal Hydel SolarBiomass /Others

Total

State 2840.00 138.70 --- 6.00 2984.70

Central Allocation (WR+ER+NR)

2484.10 113.00 --- --- 2597.10

Total 5324.10 251.70 --- 6.00 5581.80

STATION NAME UNIT NO.Unit

CapacityInstalled Capacity

Year of Commissioning

Remarks

THERMAL MW MW YEAR

1 210 21/06/1983 --

2 210 31/03/1984 --

3 210 26/03/1985 --

4 210 13/03/1986 --

KORBA WEST EXTN

5 500 500 05/09/2013 --

1 250 250 27/01/2008 --

2 250 250 30/11/2008 --

1 500 500 31/03/2016 --

2 500 500 31/07/2016 --

2840

STATION NAME UNIT NO.Unit

CapacityInstalled Capacity

Year of Commissioning

HYDEL MW MW YEAR1 40 21/03/19942 40 21/11/19943 40 11/01/19951 2.5 22/04/20042 2.5 29/06/20043 2.5 17/10/20044 2.5 05/11/20041 3.5 03/09/20062 3.5 03/09/2006

CSPGCL HYDEL 137 137

MINI/MICRO

1 0.85 12/01/20032 0.85 29/05/2007

TOTAL HYDEL including

Mini/Micro

138.7

CO-GEN PLANT, KAWARDHA

1 6.00 6.00 04/09/2006

2984.70TOTAL CSPGCL THERMAL + HYDEL + CO-GEN

GANGREL 10

SIKASAR 7

KORBA WEST 1.7

DSPM.

ABVTPS

CSEB THERMAL.

INSTALLED CAPACITY : HYDEL : CSPGCL

BANGO 120

INSTALLED CAPACITY : THERMAL : CSPGCL

Installed Generation Capacity of Chhattisgarh including Central sector shares as on 31.03.2021.1

KORBA WEST 420

KORBA WEST 420

S.NO. POWER STATIONUnit

Capacity

Total Capacity

[MW]

Total Allocated Share [MW]

1 KSTPS3x200 + 3x500

2100 210.00

2 KSTPS-7 1X500 500 75.006x210

- 0.00

2x500 - 0.002X500 1000 105.002X500 1000 62.55

4 1X500 500 40.205 TAPP - 3 & 4 2x540 1080 48.006 SIPAT-I 3x660 1980 3137 SIPAT-II 2X500 1000 158.008 NSPCL 2x250 500 50.009 MSTPS-I 2x500 1000 62.55

10 MSTPS-II 2x500 1000 87.7011 SSTPS 2x660 1320 158.8912 GSTPP 2x800 1600 155.6513 LSTPP 2x800 1600 800.0014 KHTPP 2x660 1320 125.74

17500 2452.28

1 Kameng HEP 4X150 60013.00

13.00

1 KhSTPP 3X500 1500 31.82

1500 31.82

1 Kishanganga HEP 330 100.00

100.00

1 2452.28

2 31.82

3 100.00

4 13.00

2597.10

WR

ER

NR

TOTAL

NER

IV. Total Share Of C.G. State

I. Share Of Chhattisgarh State From Central Sector Generating Stations In Western Region In Mw. (As On31.03.2021)

3VSTPS

TOTAL

TOTAL

III. Share Of Chhattisgarh State From Central Sector Generating Stations In Eastern Region In Mw. (As On 31.03.2021)

TOTAL

IVI. Share Of Chhattisgarh State From Central Sector Generating Stations In Northern Region In Mw. (As On 31.03.2021)

TOTAL

II. Share Of Chhattisgarh State From Central Sector Generating Stations InNorth Eastern Region In Mw. (As On 31.03.2021)

2 CSPGCL generation (Ex-Bus) in Mus.

3 Water Level of Major Reservoirs for last day of the month in Mtrs.

Feb-21Mar-21Mar-20

Figure-3: Water level of reserviors of CSPGCL in MARCH-2021.

Figure-1: Thermal generation [Ex-Bus] of CSPGCL in MARCH-2021.

Figure-2: Hydel generation [Ex-Bus] of CSPGCL in MARCH-2021.

KTPS HTPS DSPMTPS KWB Extn. ABVTPS Total Thermal

Feb-21 0.00 332.44 215.86 320.59 309.35 1178.24

Mar-21 0.00 319.47 288.84 316.91 469.79 1395.01

Mar-20 75.53 394.61 298.03 261.43 283.71 1313.30

332.44

215.86

320.59

309.35

1178.24

319.47 288.84

316.91

469.79

1395.01

75.53

394.61

298.03 261.43 283.71

1313.30

25.00

125.00

225.00

325.00

425.00

525.00

625.00

725.00

825.00

925.00

1025.00

1125.00

1225.00

1325.00

1425.00

1525.00

Mu

s

Thermal Generation in MARCH 2021 .

Hasdeo Bango Gangrel Sikaser

Feb-21 355.29 346 404.14

Mar-21 354.04 344.910 402.700

Mar-20 356.57 346.000 405.300

355.29

346

404.14

354.04

344.910

402.700

357.14

347.490

405.740

310

330

350

370

390

410

MU

s

BANGO GANGREL SIKASER Total Hydel

Feb-21 22.73 3.28 0.69 24.23

Mar-21 26.68 5.24 0.36 32.28

Mar-20 10.60 2.51 0.00 13.11

22.73

3.28 0.69

24.23 26.68

5.24

0.36

32.28

10.60

2.51

13.11

0.00

5.00

10.00

15.00

20.00

25.00

30.00

35.00

Mu

s

Hydel Generation in MARCH 2021

4 Demand Pattern.

4.1 MonthMaximum

Demand Met

(MW)

Date Time Frequency

March-21 4697 25.03.2021 18:45 50.02

March-20 4022 17.03.2020 18:45 49.98

% Change 17% -- -- --

4.2 Month

Maximum

Unrestricted

Demand Met

(MW)

Date Time Frequency

March-21 4739 25.03.2021 18:45 50.02

March-20 4025 17.03.2020 18:45 49.98

% Change 18% -- -- --

4.3 MonthMinimum

Demand Met

(MW)

Date Time Frequency

March-21 2560 13.03.2021 5:00 50.08

March-20 2365 10.03.2020 15:15 50.01

% Change 8% -- -- --

4.4 Availability during monthly peak demand met.

MW %

1891.00 40%

88.00 1.87%

87.00 2%

2481.42 53%

90.10 2%

59.00 1.26%

4697

Net Import(+) / Export (-)

OD(+) / UD(-)

Demand Met (MW)

Particulars

CSPGCL Thermal (Ex-bus)

CSPGCL Hydel

Injection

(Solar,Biomass,unscheduled

power,open access,small hydro)

CS Share including BSP share in

NSPCL

Figure-4: Load Curve on Peak Demand day.

4697 MW

3800

4000

4200

4400

4600

4800

MW

Time (hh:mm)

LOAD CURVE ON PEAK DEMAND DAY : 25.3.2021

Figure-5: Load Curve on Minimum Demand day.

2560 MW

2400

2600

2800

3000

3200

3400

3600

3800

4000

4200

4400

MW

Time (hh:mm)

LOAD CURVE ON MINIMUM DEMAND DAY : 13.3.2021

Figure-6: Daily Maximum Demand Met in FEB-21, MARCH-21 & MARCH-20.

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

4800

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MW

Date

Daily Max Demand met in the month of FEB-21,MARCH-21 & MARCH-20 MAX 4697 MW on 25.3.2021 at 18:45 hrs.

Average Increase of 17% compared to last year. MAR

2021

FEB

2021

4697on

25-3-21

Figure-7: Daywise Maximum & Minimum Demand Met in MARCH-2021.

2500

2700

2900

3100

3300

3500

3700

3900

4100

4300

4500

4700 M

W

Date

Daywise Min and Max Demand met in the month of MARCH-21

[ Difference : Max 1755 MW on 13.03.21& Min 360 MW on 27. 3. .21

1755 MW on 13.3.21

Figure-8: Daywise Maximum Restricted Vs Unrestricted Demand Met in MARCH-2021.

4200

4300

4400

4500

4600

4700

4800

MW

Date

UNRESTRICTED DEMAND

Figure-9: Load Duration Curve for the month of April-19.

4697MW

2560 MW 2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

4800

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

% OF TIME

DEM

AN

D (

MW

) [For 50% of time, Demand 4287MW ]

LOAD DURATION CURVE : MARCH-2021

% OF TIME

DEM

AN

D (

MW

)

[i] [ii] [iii]

Date <49.9

Hz

49.9 to

50.05 Hz

>50.05

Hz

Frequency

Variation Index [FVI]

% of time

Frequency

remained out of IEGC band.

No of hours during which frequency

was out of range during the day.

{([i]/100)x24 Hrs}

Daily

FDI=[ii]/24

Max Min Average

% % % % Hours Hz Hz Hz

1-Mar-21 3.13 84.38 12.50 0.02 15.63 3.75 0.16 50.11 49.82 50.02

2-Mar-21 0.00 84.38 15.63 0.02 15.63 3.75 0.16 50.11 49.91 50.02

3-Mar-21 0.00 86.46 13.54 0.02 13.54 3.25 0.14 50.08 49.92 50.02

4-Mar-21 1.04 90.63 8.33 0.02 9.38 2.25 0.09 50.09 49.88 50.00

5-Mar-21 3.13 90.63 6.25 0.03 9.38 2.25 0.09 50.07 49.87 49.99

6-Mar-21 7.29 83.33 9.38 0.02 16.67 4.00 0.17 50.11 49.86 49.99

7-Mar-21 0.00 80.21 19.79 0.02 19.79 4.75 0.20 50.13 49.94 50.03

8-Mar-21 6.25 90.63 1.04 0.03 7.29 1.75 0.07 50.08 49.83 49.99

9-Mar-21 5.21 93.75 5.21 0.02 10.42 2.50 0.10 50.08 49.83 49.99

10-Mar-21 6.25 88.54 5.21 0.01 11.46 2.75 0.11 50.08 49.85 49.99

11-Mar-21 0.00 82.29 17.71 0.02 17.71 4.25 0.18 50.12 49.90 50.02

12-Mar-21 1.04 79.17 19.79 0.02 20.83 5.00 0.21 50.12 49.89 50.03

13-Mar-21 6.25 80.21 13.54 0.02 19.79 4.75 0.20 50.10 49.78 50.00

14-Mar-21 2.08 84.38 13.54 0.02 15.63 3.75 0.16 50.10 49.87 50.00

15-Mar-21 4.17 83.33 12.50 0.02 16.67 4.00 0.17 50.10 49.79 50.01

16-Mar-21 5.21 91.67 3.13 0.01 8.33 2.00 0.08 50.07 49.85 49.99

17-Mar-21 21.88 76.04 2.08 0.02 23.96 5.75 0.24 50.07 49.79 49.95

18-Mar-21 5.21 91.67 3.13 0.02 8.33 2.00 0.08 50.07 49.83 49.99

19-Mar-21 3.13 80.21 16.67 0.02 19.79 4.75 0.20 50.08 49.85 50.01

20-Mar-21 2.08 76.04 21.88 260.43 23.96 5.75 0.24 50.13 49.86 50.02

21-Mar-21 2.08 81.25 16.67 0.02 18.75 4.50 0.19 50.13 49.87 50.01

22-Mar-21 9.38 84.38 6.25 0.02 15.63 3.75 0.16 50.11 49.84 49.98

23-Mar-21 0.00 81.25 18.75 0.02 18.75 4.50 0.19 50.10 49.90 50.03

24-Mar-21 4.17 85.42 10.42 0.02 14.58 3.50 0.15 50.09 49.85 50.01

25-Mar-21 1.04 84.38 14.58 0.02 15.63 3.75 0.16 50.10 49.82 50.02

26-Mar-21 9.38 87.50 3.13 0.02 12.50 3.00 0.13 50.08 49.83 49.98

27-Mar-21 1.04 82.29 16.67 0.02 17.71 4.25 0.18 50.10 49.84 50.02

28-Mar-21 0.00 84.38 15.63 0.02 15.63 3.75 0.16 50.12 49.94 50.03

29-Mar-21 1.04 82.29 16.67 0.01 17.71 4.25 0.18 50.14 49.89 50.01

30-Mar-21 3.13 73.96 22.92 0.02 26.04 6.25 0.26 50.13 49.82 50.03

31-Mar-21 0.00 75.00 25.00 0.02 25.00 6.00 0.25 50.17 49.90 50.03

FREQUENCY (in % time) FREQUENCY (Hz)

5. Frequency Profile.

(As per block wise frequency recorded in SLDC Raipur)

FREQUENCY PROFILE FOR MARCH-2021.

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

Figure-10: Frequency Profile for the month of MARCH-2021.

0%

5%

10%

15%

20%

25%

30%

35%

40%

45%

50%

55%

60%

65%

70%

75%

80%

85%

90%

95%

100%

Marc

h 1

, 2021

Marc

h 2

, 2021

Marc

h 3

, 2021

Marc

h 4

, 2021

Marc

h 5

, 2021

Marc

h 6

, 2021

Marc

h 7

, 2021

Marc

h 8

, 2021

Marc

h 9

, 2021

Ma

rch

10

, 2

02

1

Marc

h 1

1,

2021

Marc

h 1

2,

2021

Ma

rch

13

, 2

02

1

Marc

h 1

4,

2021

Marc

h 1

5,

2021

Ma

rch

16

, 2

02

1

Ma

rch

17

, 2

02

1

Marc

h 1

8,

2021

Ma

rch

19

, 2

02

1

Ma

rch

20

, 2

02

1

Marc

h 2

1,

2021

Marc

h 2

2,

2021

Ma

rch

23

, 2

02

1

Ma

rch

24

, 2

02

1

Marc

h 2

5,

2021

Ma

rch

26

, 2

02

1

Ma

rch

27

, 2

02

1

Marc

h 2

8,

2021

Ma

rch

29

, 2

02

1

Ma

rch

30

, 2

02

1

Marc

h 3

1,

2021

<49.9 Hz % 49.9 to 50.05 Hz % >50.05 Hz %

6. Voltage Profile.

6.1 Voltage Deviation Index [VDI] - 400 KV Substations for the month MARCH-2021.

Maximum Minimum < 380 KV 380-420 KV > 420 KVNo. of hours

below IEGC < 380 KV [i]

No. of hours above IEGC > 420 KV [ii]

KV KV % % % Hours Hours Hours

1 Khedamara 416 402 0.00 100.00 0.00 0.00 0.00 0.00 0.00

2 Jagdalpur 435 406 0.00 55.44 44.56 0.00 331.50 331.50 0.45

3 Korba West 424 415 0.00 76.61 23.39 0.00 174.00 174.00 0.23

4 KURUD 426 393 0.00 97.58 2.42 0.00 18.00 18.00 0.02

5 Marwa 427 410 0.00 29.23 70.77 0.00 526.53 526.53 0.71

6 Raita 425 403 0.00 94.62 5.38 0.00 40.00 40.00 0.05

6.2 Voltage Deviation Index [VDI] - 220 KV Substations for the month MARCH-2021.

Maximum Minimum < 198 KV 198-245 KV > 245 KVNo. of hours

below IEGC < 198 KV [i]

No. of hours above IEGC > 245 KV [ii]

KV KV % % % Hours Hours Hours

1 Banari 235 223 0.00 100.00 0.00 0.00 0.00 0 0.00

2 Barsoor 234 214 0.00 100.00 0.00 0.00 0.00 0 0.00

3 Bhilai 232 215 0.00 100.00 0.00 0.00 0.00 0 0.00

4 Bhatapara 230 213 0.00 100.00 0.00 0.00 0.00 0 0.00

5 BEMETARA 232 198 0.00 100.00 0.00 0.00 0.00 0 0.00

6 Churi 237 225 0.00 100.00 0.00 0.00 0.00 0 0.00

7 Doma 233 219 0.00 100.00 0.00 0.00 0.00 0 0.00

8 DSPM 237 227 0.00 100.00 0.00 0.00 0.00 0 0.00

9 Gurur 227 204 0.00 100.00 0.00 0.00 0.00 0 0.00

10 Jagdalpur 235 217 0.00 100.00 0.00 0.00 0.00 0 0.00

11 Korba East 236 228 0.00 100.00 0.00 0.00 0.00 0 0.00

12 Korba West 238 224 0.00 100.00 0.00 0.00 0.00 0 0.00

13 KURUD 229 202 0.00 100.00 0.00 0.00 0.00 0 0.00

14 MARWA 233 220 0.00 100.00 0.00 0.00 0.00 0 0.00

15 Mopka 241 222 0.00 100.00 0.00 0.00 0.00 0 0.00

16 Paraswani 230 201 0.00 100.00 0.00 0.00 0.00 0 0.00

17 Raita 233 220 0.00 100.00 0.00 0.00 0.00 0 0.00

18 Siltara 230 218 0.00 100.00 0.00 0.00 0.00 0 0.00

19 SARAIPALI 238 198 0.00 100.00 0.00 0.00 0.00 0 0.00

Total No. of hours out of IEGC range (HH:MM) [iii = I + ii]

VDI = [iii] / Total No. of hours in a

week.

S.No.Sub station

name

Voltage (in Volts) Voltage (in % time) Voltage (in time)

Total No. of

hours out of IEGC range (HH:MM) [iii = I + ii]

VDI = [iii] / Total No. of hours in a

month.

Sub station name

S.No.

Voltage (in Volts) Voltage (in % time) Voltage (in time)

NOTE :- 1 . (a)

(b)

(c)

2% of Time of Occurance of 400 KV & 220 KV Bus is calculated only for the duration when the supply was there and healthy

data of voltage was available

Voltage of 220 KV Bus at 220 KVS/S Churi was not proper during the period from 01.3.21 to 04.3.2021 upto 14:45 hrs & also intermittently during other dates.

Voltage of 220 KV Bus at 220 KVS/S Bemetara was not proper during the days 27.03.21,28.03.21 & 30.03.21.

Voltage of 220 KV Bus at 220 KVS/S Saraipali was not proper during the period from 19.3.21 to 31.3.2021 .

Figure-12: Voltage Profile of 400 KV Substations for the month of MAR-21.

Figure-13: Voltage Profile of 400 KV Substations for the month of MAR-21.

370

380

390

400

410

420

430

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Khedamara

Raita

VOLTAGE PROFILE OF 400 KV S/S : MAR'2021

370

380

390

400

410

420

430

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Korba West Marwa

VOLTAGE PROFILE OF 400 KV S/S : MAR'2021

Figure-14: Voltage Profile of 400 KV Substations for the month of MAR-21.

Figure-15: Voltage Profile of 220 KV Substations for the month of MAR-21.

370

380

390

400

410

420

430

440

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Jagdalpur

Kurud

VOLTAGE PROFILE OF 400 KV S/S : MAR'2021

195

200

205

210

215

220

225

230

235

240

245

250

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Banari

Khedamara

Barsoor

VOLTAGE PROFILE OF 220 KV S/S :MAR' 2021

Figure-16: Voltage Profile of 220 KV Substations for the month of MAR-21.

Figure-17: Voltage Profile of 220 KV Substations for the month of MAR-21.

190

195

200

205

210

215

220

225

230

235

240

245

250

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Bhatapara

Bemeatara

Chhuri

Doma

VOLTAGE PROFILE OF 220 KV S/S : MAR'2021

190

195

200

205

210

215

220

225

230

235

240

245

250

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

DSPM

Gurur

Jagdalpur

Korba East

VOLTAGE PROFILE OF 220 KV S/S : MAR'2021

Figure-18: Voltage Profile of 220 KV Substations for the month of MAR-21

Figure-19: Voltage Profile of 220 KV Substations for the month of MAR-21.

190

195

200

205

210

215

220

225

230

235

240

245

250

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

06

-03

-20

21

06

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

11

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Korba West

Kurud

Marwa

Mopka

VOLTAGE PROFILE OF 220 KV S/S : MAR'2021

190

195

200

205

210

215

220

225

230

235

240

245

250

01

-03

-20

21

01

-03

-20

21

02

-03

-20

21

03

-03

-20

21

04

-03

-20

21

05

-03

-20

21

06

-03

-20

21

07

-03

-20

21

07

-03

-20

21

08

-03

-20

21

09

-03

-20

21

10

-03

-20

21

11

-03

-20

21

12

-03

-20

21

13

-03

-20

21

13

-03

-20

21

14

-03

-20

21

15

-03

-20

21

16

-03

-20

21

17

-03

-20

21

18

-03

-20

21

19

-03

-20

21

20

-03

-20

21

20

-03

-20

21

21

-03

-20

21

22

-03

-20

21

23

-03

-20

21

24

-03

-20

21

25

-03

-20

21

26

-03

-20

21

26

-03

-20

21

27

-03

-20

21

28

-03

-20

21

29

-03

-20

21

30

-03

-20

21

31

-03

-20

21

Parasawani

Raita

Siltara

Saraipali

VOLTAGE PROFILE OF 220 KV S/S : MAR'2021

7 Addition of new grid elements during MARCH-2021.

DATE TIME [Hrs:Min] NAME OF SUB STATION NAME OF CHARGED EQUIPMENTS & LINES REMARKS

23-Mar-21 17:15 132 KV GENDPUR S/S 40 MVA X-MER II FIRST TIME CHARGED

23-Mar-21 19:19 132 KV DOMA S/S 132 KV DOMA-PATAN CKT-II FIRST TIME CHARGED

26-Mar-21 18:58 132 KV DHAMDHA S/S 132 KV DHAMDHA-SAJA CKT-II FIRST TIME CHARGED

27-Mar-21 14:58 132 KV SHEORINARAYAN S/S 40 MVA X-MER II FIRST TIME CHARGED

8. Units Decommissioned.

Capacity [MW] Withdrawn fromUnit

NIL

Station Unit #Installed

Capacity (In MW)

No. of Outages Outage Date & Time Syn. Date & TimeOutage

(HH:MM)Generation Loss

(In Mu)Reason

1 210 1 19/12/20 23:55 16/03/21 19:10 2083:15:00 437.482 AOH

2 210 0 NIL NIL - -

3 210 0 NIL NIL - -

4 210 0 NIL NIL - -

5 500 0 NIL NIL - -

1 250 1 21/02/21 23:51 04/03/21 23:48 263:57:00 65.9875 OVERHAULING

2 250 0 NIL NIL - -

1 500 0 NIL NIL - -

2 500 0 NIL NIL - -

Total 2840 2 503.47

Station Unit #Installed

Capacity (In

MW)

No. of Outages Outage Date & Time Syn. Date & TimeOutage

(hh::mm:ss)Generation Loss

(In Mu)Reason

17/03/21 16:24 17/03/21 19:30 3:06:00 0.651 DUE TO FLAM FAILURE

19/03/21 20:55 27/03/21 01:20 172:25:00 36.207 BTL

28/03/21 03:55 28/03/21 11:30 7:35:00 1.592AIR FLOW LESS THEN 50

%

01/03/21 05:03 03/03/21 21:42 64:39:00 13.5765 BTL

14/03/21 21:18 16/03/21 15:29 42:11:00 8.859 PROBLEM IN ID FAN

23/03/21 18:31 23/03/21 22:43 4:12:00 0.882BTL

24/03/21 22:46 24/03/21 23:38 0:52:00 0.182 FLAME FAILURE

24/03/21 23:48 25/03/21 01:03 1:15:00 0.262 FLAME FAILURE

25/03/21 01:05 25/03/21 02:49 1:44:00 0.364FLAME FAILURE

30/03/21 07:05 31/03/21 00:59 17:54:00 3.759 BTL

2

HTPS

210 7

9. Planned Outages Of Generating Stations For The Month Of MARCH-2021.

HTPS

DSPM TPS

ABVTPS

10. Forced Outages Of State Generating Stations For The Month Of MARCH-2021.

210 31

Station Unit #Installed

Capacity (In MW)

No. of Outages Outage Date & Time Syn. Date & TimeOutage

(hh::mm:ss)Generation Loss

(In Mu)Reason

3 210 1 17/03/21 19:51 26/03/21 01:07 197:16:00 41.426 BTL

03/03/21 08:36 04/03/21 01:39 17:03:00 3.5805 BTL

26/03/21 01:37 27/03/21 09:37 32:00:00 6.72BTL

19/03/21 11:29 21/03/21 02:51 39:22:00 19.683PROBLEM IN WATER FEED

PUMP

30/03/21 16:39 30/03/21 18:24 1:45:00 0.875 LOSS OF FUEL

1 250 - - - - -

2 250 1 27/03/21 12:26 28/03/21 00:24 11:58:00 2.992AIR HEATER 2B MOTOR

ALIGNMENT WORK

1 500 1 10/03/21 16:57 11/03/21 13:02 0.837 10.042DUE TO ELECTRICAL

PROTECTION OPERATED

2 500 1 10/03/21 16:57 12/03/21 19:32 2.108 25.292DUE TO ELECTRICAL

PROTECTION OPERATED

Total 2840 18 685:57 176.945

4 2

5

HTPS

500 2

210

ABVTPS

DSPM TPS

S. No.

DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

1 04-Mar-21 400 315 MVA ICT No.I AT 400 KV S/S JAGDALPUR 09:31 17:01 7:30:00

2 05-Mar-21 400 400KV BHILAI - RAITA CKT. NO. I 9:05 19:19 10:14:00

3 05-Mar-21 400 315MVA ICT. NO. I AT 400KV S/S JAGDALPUR 9:31 17:09 7:38:00

4 09-Mar-21 400 400 KV BHILAI - KORADI CKT 09/03/21 10:30 10/03/21 00:30 14:00:00

5 18-Mar-21 400 400 KV KWB - RAITA CKT NO. II 11:40 18:11 6:31:00

6 19-Mar-21 400 400 KV BHILAI - KORADI CKT 19/03/21 02:43 19/03/21 15:43 13:00:00

7 19-Mar-21 400 400 KV TRANSFER BUS AT 400 KV S/S KWB 19/03/21 16:02 20/03/21 12:22 20:20:00

8 20-Mar-21 400 400 KV BHILAI - BHADRAWATI CKT 20/03/21 09:02 22/03/21 20:16 59:14:00

9 23-Mar-21 400 400 KV KW - BHILAI CKT 12:52 20:32 7:40:00

10 25-Mar-21 400 400 KV JAGDALPUR ICT NO. II 11:06 17:01 5:55:00

11 26-Mar-21 400 400 KV JAGDALPUR ICT NO. II 12:47 16:15 3:28:00

12 30-Mar-21 400 315MVA ICT NO. II AT 400KV S/S KHEDAMARA 13:18 18:07 4:49:00

13 02-Mar-21 220 220 KV THELKADIH - BHILAI CKT NO. II 02/03/21 10:05 03/03/21 12:59 26:54:00

14 02-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. II 12:51 15:20 2:29:00

15 02-Mar-21 220 160 MVA X-MER NO. I AT 220 KV S/S GURUR 15:52 18:55 3:03:00

16 03-Mar-21 220 160 MVA XMER No.II AT 220 KV S/S SILTARA 11:19 16:14 4:55:00

17 04-Mar-21 220 220 KV MARWA - BANARI CKT No.I 09:39 18:15 8:36:00

18 04-Mar-21 220 220 KV DSPM - BANARI CKT 18:35 20:42 2:07:00

19 05-Mar-21 220 160MVA AUTO Xmer NO. II AT KEB 14:57 20:38 5:41:00

20 08-Mar-21 220 220 KV KE - RAIGARH CKT 08/03/21 10:10 09/03/21 18:44 32:34:00

21 08-Mar-21 220 220 KV DHARDEHI - BHATAPARA CKT 10:00 17:48 7:48:00

22 08-Mar-21 220 160 MVA X-MER AT 220 KV S/S GERWANI 12:52 14:40 1:48:00

23 08-Mar-21 220 160 MVA X-MER NO. II AT 220 KV S/S DOMA 13:14 18:31 5:17:00

24 08-Mar-21 220 160 MVA X-MER NO. II AT 220 KV S/S MOPKA 14:14 15:04 0:50:00

25 09-Mar-21 220 220 KV PGCIL RAIPUR - BHATAPARA 10:21 21:27 11:06:00

26 09-Mar-21 220 220 KV RAIGARH - GERWANI CKT NO. II 10:53 18:00 7:07:00

27 09-Mar-21 220 220 KV RAIGARH - GERWANI CKT NO. I 10:55 17:56 7:01:00

28 09-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. II 13:20 15:51 2:31:00

29 10-Mar-21 220 220 KV BHATAPARA - SUHELA CKT 10:06 13:40 3:34:00

11. Shutdown of Transmission Elements in MARCH-2021.

400 KV

220 KV

S. No.

DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

11. Shutdown of Transmission Elements in MARCH-2021.

30 10-Mar-21 220 220 KV RAIGARH - GERWANI CKT NO. I 11:05 18:45 7:40:00

31 10-Mar-21 220 220 KV RAIGARH - GERWANI CKT NO. I I 11:05 18:50 7:45:00

32 11-Mar-21 220 220 KV PGCIL BHATAPARA - BHATAPARA CKT 10:47 17:51 7:04:00

33 15-Mar-21 220 3X40 MVA X-MER AT 220 KV S/S BARSOOR 12:10 19:46 7:36:00

34 16-Mar-21 220 160 MVA X-MER NO. II AT 220 KV S/S BANARI 11:59 17:23 5:24:00

35 17-Mar-21 220 220 KV MAIN BAY OF KE - DSPM CKT 10:48 16:25 5:37:00

36 18-Mar-21 220 220 KV BHILAI - PG RAIPUR CKT 12:35 15:55 3:20:00

37 18-Mar-21 220 220 KV KE - DHARDEHI CKT 13:54 19:10 5:16:00

38 20-Mar-21 220 125 MVA XMER No.III AT 220 KV S/S BHILAI 08:38 15:43 7:05:00

39 20-Mar-21 220 160 MVA XMER No.I AT 220 KV S/S RAIGARH 11:05 17:25 6:20:00

40 20-Mar-21 220 220 KV PGCIL - DOMA CKT No.I 11:29 18:37 7:08:00

41 24-Mar-21 220 160 MVA X-MER NO. II AT 220 KV S/S KUTHREL 10:35 12:34 1:59:00

42 25-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. I 12:24 14:59 2:35:00

43 26-Mar-21 220 220 KV CHHURI - KOTMIKALA CKT NO. II 11:05 16:27 5:22:00

44 27-Mar-21 220 160 MVA XMER No.I AT 220 KV S/S BORJHARA 10:23 18:03 7:40:00

45 31-Mar-21 220 220 KV MOPKA - CHHURI CKT NO. II 09:00 12:07 3:07:00

46 01-Mar-21 132 63 MVA X-MER NO. II AT 132 KV S/S KUHERA 12:37 14:22 1:45:00

47 01-Mar-21 132 132 KV DALLIRAJHARA - GURUR CKT 12:25 13:42 1:17:00

48 02-Mar-21 132 132 KV CHHURI - GEVRA CKT NO. I 12:33 15:45 3:12:00

49 02-Mar-21 132 132 KV GHARGHODA - PATHALGAON CKT 12:56 15:16 2:20:00

50 02-Mar-21 132 40 MVA X-MER NO. I AT 132 KV S/S MUNGELI 15:42 16:26 0:44:00

51 03-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S DHAMDHA 10:21 15:31 5:10:00

52 03-Mar-21 132 40 MVA XMER No.I AT 220 KV S/S URLA 03/03/21 10:40 05/03/21 18:20 55:40:00

53 03-Mar-21 132 40 MVA XMER No.II AT 132 KV S/S BILASPUR 12:08 13:09 1:01:00

54 03-Mar-21 132 40 MVA XMER No.II AT 132 KV S/S MAHASAMUND 11:15 13:10 1:55:00

55 04-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S SIMGA 10:02 16:50 6:48:00

56 04-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S JAGDALPUR 24/02/21 11:37 04/03/21 18:42 199:05:00

57 05-Mar-21 132 132KV GERWANI - GHARGHODA CKT. NO. I 10:00 18:10 8:10:00

58 05-Mar-21 132 40MVA Xmer NO. II AT 132KV S/S DHAMDHA 10:08 15:49 5:41:00

59 05-Mar-21 132 40MVA Xmer NO. III AT 132KV S/S BILASPUR 10:55 13:00 2:05:00

132 KV

S. No.

DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

11. Shutdown of Transmission Elements in MARCH-2021.

60 06-Mar-21 132 132KV SIMGA - CHAKARBHATA CKT. 9:40 14:08 4:28:00

61 06-Mar-21 132 132KV TULSI - SIMGA CKT. 10:04 15:05 5:01:00

62 06-Mar-21 132 132KV SIMGA - PATHARIYA CKT. 10:10 14:04 3:54:00

63 06-Mar-21 132 132KV BHILAI - BORJHARA - GUDIYARI CKT. 12:01 17:36 5:35:00

64 06-Mar-21 132 132KV MAIN BUS NO. II AT 220KV S/S BHILAI 13:00 16:47 3:47:00

65 07-Mar-21 132 40 MVA X-MER NO. I AT 132 KV S/S BHILAI 10:12 15:58 5:46:00

66 07-Mar-21 132132 KV MAIN BUS AT 132 KV S/S

MANENDRAGARH10:40 13:09 2:29:00

67 08-Mar-21 132 132 KV URLA - SECTOR 'C' CKT 22:56 23:00 0:04:00

68 08-Mar-21 132 132 KV URLA - SECTOR 'A' CKT 08/03/21 13:24 10/03/21 18:08 52:44:00

69 09-Mar-21 132 40 MVA X-MER AT 220 KV S/S BARSOOR 10:11 12:07 1:56:00

70 09-Mar-21 132 132 KV RAJIM - KURUD CKT 12:17 15:54 3:37:00

71 09-Mar-21 132 132 KV RAJIM - MAGARLOAD CKT 12:37 15:53 3:16:00

72 09-Mar-21 132 132 KV MAHASAMUND - KUHERA CKT 12:37 16:01 3:24:00

73 09-Mar-21 132 132 KV SARAIPALI - SARANGARH CKT NO. I 13:01 16:09 3:08:00

74 09-Mar-21 132 132 KV SARAIPALI - SARANGARH CKT NO. I I 13:02 16:08 3:06:00

75 09-Mar-21 132 132 KV JHALAP - PARASWANI CKT 13:12 15:58 2:46:00

76 09-Mar-21 132 132 KV JHALAP - BAGBAHARA CKT 13:20 15:59 2:39:00

77 10-Mar-21 132 132 KV SILTARA - SEML CKT 10:40 19:16 8:36:00

78 10-Mar-21 132 132 KV AKALTARA - KVK CKT 11:00 13:40 2:40:00

79 11-Mar-21 132 63 MVA XMER AT 132 KV S/S RUABANDHA 10:46 12:45 1:59:00

80 12-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S MUNGELI 10:03 19:17 9:14:00

81 12-Mar-21 132 132 KV URLA - Bajrang Power CKT 12/03/21 10:46 13/03/21 19:32 32:46:00

82 13-Mar-21 132 132KV MAIN BUS AT 220KV S/S GENDPUR 9:58 12:22 2:24:00

83 13-Mar-21 132 33KV MAIN BUS AT 220KV S/S GENDPUR 9:52 12:25 2:33:00

84 13-Mar-21 132 132KV RAIGARH - ADBHAR CKT. 13:21 15:18 1:57:00

85 13-Mar-21 132 132KV CHAMPA - CHAPLE CKT. 13:25 15:17 1:52:00

86 15-Mar-21 132 132 KV MAIN BUS AT 132 KV S/S PATAN 10:30 13:15 2:45:00

87 15-Mar-21 132 132 KV DOMA - PATAN CKT 11:18 13:14 1:56:00

88 15-Mar-21 132 132 KV BALODA BAZAR - NUVOCO CKT 10:31 13:19 2:48:00

89 15-Mar-21 132 20 MVA X-MER AT 220 KV S/S KOTMIKALA 12:11 CONTD. -

90 16-Mar-21 132 132 KV ADBHAR RLY TRACTION NO. I 12:56 14:31 1:35:00

S. No.

DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

11. Shutdown of Transmission Elements in MARCH-2021.

91 16-Mar-21 132 132 KV CHAPLE RLY TRACTION NO. II 13:12 14:30 1:18:00

92 16-Mar-21 132 132 KV RAIGARH - CHAPLE CKT 14:55 17:12 2:17:00

93 17-Mar-21 132 132 KV BHILAI - RASMADA CKT 17/03/21 10:06 18/03/21 15:13 29:07:00

94 17-Mar-21 132 40 MVA X-MER NO. I AT 220 KV S/S SILTARA 11:23 17:24 6:01:00

95 17-Mar-21 132 132 KV RAIGARH - KODATARAI CKT 12:51 15:33 2:42:00

96 19-Mar-21 132 132 KV JHALAP - SANKARA CKT 10:04 14:10 4:06:00

97 19-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S BALODA BAZAR 11:07 12:37 1:30:00

98 19-Mar-21 132 132 KV SARANGARH - SARAIPALI CKT No.I 12:00 19:37 7:37:00

99 19-Mar-21 132 40 MVA XMER No.III AT 132 KV S/S JAGDALPUR 14:28 17:14 2:46:00

100 20-Mar-21 132 132 KV BHILAI - PULGAON CKT 13:21 18:24 5:03:00

101 21-Mar-21 132 132KV MAIN BUS AT S/S AMBIKAPUR 9:02 12:50 3:48:00

102 21-Mar-21 132 40MVA Xmer NO. III AT 132KV S/S BHILAI 10:17 12:52 2:35:00

103 21-Mar-21 132 40MVA Xmer NO. II AT 132KV S/S BHILAI 12:54 16:25 3:31:00

104 22-Mar-21 132 132KV MAIN BUS NO. I AT 220KV S/S BHILAI 22/03/21 12:54 26/03/21 17:43 100:49:00

105 22-Mar-21 132 132KV SUHELA - ULTRA TECH CKT. 13:57 16:20 2:23:00

106 23-Mar-21 132 132 KV BHILAI - SARONA CKT 09:45 18:17 8:32:00

107 23-Mar-21 132 132 KV MAIN BUS AT 132 KV S/S PATAN 10:00 17:04 7:04:00

108 23-Mar-21 132 132 KV DOMA - PATAN CKT 10:04 16:55 6:51:00

109 23-Mar-21 132 40 MVA X-MER NO. II AT 220 KV S/S GENDPUR 13:57 15:05 1:08:00

110 23-Mar-21 132 20 MVA X-MER AT 220 KV S/S KOTMIKALA 15/03/21 12:11 23/03/21 14:58 194:47:00

111 23-Mar-21 132 132 KV URLA - BORJHARA CKT 16:04 17:39 1:35:00

112 24-Mar-21 132 132 KV GHARGHODA - MAHAVEER CKT 10:02 15:05 5:03:00

113 24-Mar-21 132 33 KV MAIN BUS SECTION NO. I AT BISHRAMPUR 10:10 12:00 1:50:00

114 24-Mar-21 132 132 KV SARANGARH - BARAMKELA CKT 11:26 17:39 6:13:00

115 24-Mar-21 132 132 KV BHATAPARA - SIMGA CKT CKT NO. II 17:54 19:26 1:32:00

116 25-Mar-21 132132 KV MAIN BUS - I & 132 KV PULGAON CKT AT

220 KV S/S BHILAI10:54 18:35 7:41:00

117 25-Mar-21 132 132 KV BHATAPARA - SIMGA CKT NO. I 17:01 17:58 0:57:00

118 26-Mar-21 132 132 KV BHILAI - PULGAON CKT 09:34 18:05 8:31:00

119 26-Mar-21 132 132 KV MAIN BUS AT 132 KV S/S SEORINARAYAN 11:00 13:12 2:12:00

120 26-Mar-21 132 33 KV MAIN BUS AT 132 KV S/S PANDARIYA 12:01 14:10 2:09:00

121 27-Mar-21 132 40 MVA XMER AT 220 KV S/S BANARI 09:22 11:49 2:27:00

S. No.

DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

11. Shutdown of Transmission Elements in MARCH-2021.

122 27-Mar-21 132 RLY TRACTION No.I AT 132 KV S/S RAIGARH 10:56 13:13 2:17:00

123 27-Mar-21 132 132 KV KONI - MOPKA CKT 11:45 12:53 1:08:00

124 28-Mar-21 132132 KV URLA ( SECTOR - A) - HERE FERRO

ALLOYS CKT08:50 14:26 5:36:00

125 28-Mar-21 132 40 MVA XMER No.I AT 132 KV S/S BAGBEHERA 20:00 21:37 1:37:00

126 31-Mar-21 13240MVA Xmer NO. II AT 132KV S/S

BHANUPRATAPPUR10:15 18:30 8:15:00

S. No. DateVoltage

Level [KV]Name of the Transmission Elements

From [

(mm/dd/yy) hh:mm ]

To

[ (mm/dd/yy) hh:mm

]

Outage

Hours

(hh:mm)

1 06-Mar-21 400 400KV BHILAI - KORADI CKT. 13:11 13:35 0:24:00

2 10-Mar-21 400 400 KV MARWA - KW EXT. CKT 16:57 17:45 0:48:00

3 10-Mar-21 400 400 KV MARWA - BHILAI CKT 16:57 18:04 1:07:00

4 10-Mar-21 400 400 KV MARWA - RAITA CKT NO. I 16:57 18:14 1:17:00

5 10-Mar-21 400 400 KV MARWA - RAITA CKT NO. II 10/03/21 16:57 12/03/21 21:57 53:00:00

6 10-Mar-21 400 315 MVA ICT AT MARWA 16:57 17:27 0:30:00

7 12-Mar-21 400 400 KV KW - RAITA CKT 22:21 23:19 0:58:00

8 18-Mar-21 400 400 KV KW - RAITA CKT 18:19 18:57 0:38:00

9 18-Mar-21 400 400 KV BHILAI - KORADI CKT 18/03/21 15:43 19/03/21 02:43 11:00:00

10 24-Mar-21 400 500 MVA ICT AT 400 KV S/S KWB 24/03/21 17:52 27/03/21 17:09 71:17:00

11 29-Mar-21 400 400KV KHEDAMARA - KORBA ( W ) EXT. CKT. 15:14 16:15 1:01:00

12 01-Mar-21 220 220 KV GURUR - BHILAI CKT 13:27 13:38 0:11:00

13 02-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. II 03:28 03:41 0:13:00

14 02-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. II 05:19 05:30 0:11:00

15 04-Mar-21 220 220 KV CHHURI - BISHRAMPUR CKT No.I 06:20 06:43 0:23:00

16 04-Mar-21 220 220 KV RAIGARH - CHAPLE CKT 21:23 21:44 0:21:00

17 05-Mar-21 220 220KV SUHELA - PARASWANI CKT. NO. II 21:08 21:16 0:08:00

18 06-Mar-21 220 220KV JAGDALPUR - NAGARNAR CKT.NO. I 10:41 10:50 0:09:00

19 06-Mar-21 220 220KV JAGDALPUR - NAGARNAR CKT.NO. II 10:41 10:51 0:10:00

20 09-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. II 22:33 22:47 0:14:00

21 10-Mar-21 220 220 KV KORBA WEST - MOPKA CKT 13:15 14:21 1:06:00

22 10-Mar-21 220 200 KV MARWA - BANARI CKT NO. I 16:57 17:16 0:19:00

23 10-Mar-21 220 220 KV MARWA - BANARI CKT NO. II 16:57 17:20 0:23:00

24 10-Mar-21 220 160 MVA X-MER NO. I AT S/S PARASWANI 23:31 23:44 0:13:00

25 10-Mar-21 220 160 MVA X-MER NO. I I AT S/S PARASWANI 10/03/21 23:31 11/03/21 00:04 0:33:00

26 11-Mar-21 220 220 KV GURUR - BARSOOR CKT 11/03/21 17:56 12/03/21 09:58 16:02:00

27 12-Mar-21 220 160 MVA XMER No.I AT 220 KV S/S PARASWANI 06:40 06:50 0:10:00

28 12-Mar-21 220 160 MVA XMER No.II AT 220 KV S/S PARASWANI 06:40 07:08 0:28:00

29 12-Mar-21 220 3X40 MVA XMER AT 220 KV S/S BARSOOR 12:00 23:44 11:44:00

30 12-Mar-21 220 220 KV KE - MOPKA CKT 14:09 14:42 0:33:00

31 12-Mar-21 220 220 KV GURUR - NARAYANPUR CKT 18:41 19:26 0:45:00

32 13-Mar-21 220 220KV MUNGELI - BEMETARA CKT. NO. I 1:41 2:35 0:54:00

33 13-Mar-21 220 220KV MUNGELI - BEMETARA CKT. NO. II 1:42 3:12 1:30:00

34 13-Mar-21 220 220KV GERWANI - JPL CKT. 1:52 2:40 0:48:00

35 14-Mar-21 220 220KV KWB - MOPKA CKT. 11:38 12:06 0:28:00

36 16-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. I 00:55 01:04 0:09:00

37 16-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. I 03:21 03:34 0:13:00

38 17-Mar-21 220 220 KV SUHELA - PARASWANI CKT NO. I 22:42 22:51 0:09:00

39 18-Mar-21 220 220 KV KORBA - BUDHIPADAR CKT NO. II 13:26 16:22 2:56:00

40 22-Mar-21 220 220KV SUHELA - PARASWANI CKT. NO. I 4:39 4:48 0:09:00

41 22-Mar-21 220 220KV KHEDAMARA - THELKADIH CKT NO. I 18:54 19:08 0:14:00

42 22-Mar-21 220 220KV KHEDAMARA - THELKADIH CKT NO. II 22/03/21 18:54 23/03/21 07:50 12:56:00

43 25-Mar-21 220 KW - BUS NO. II 25/03/21 09:45 27/03/21 16:20 6:35:00

12. Trippings in Transmission Elements in MARCH-2021.

400 KV

220 KV

12. Trippings in Transmission Elements in MARCH-2021.

44 27-Mar-21 220 220 KV SUHELA - PARASWANI CKT No.I 00:45 00:53 0:08:00

45 27-Mar-21 220 220 KV SUHELA - PARASWANI CKT No.I 02:57 03:05 0:08:00

46 28-Mar-21 220 220 KV SUHELA - PARASWANI CKT No.I 03:46 03:58 0:12:00

47 28-Mar-21 220 220 KV KE - BUDHIPADHAR CKT No.III 05:45 08:43 2:58:00

48 28-Mar-21 220 220 KV KW - MOPKA CKT 12:48 16:58 4:10:00

49 29-Mar-21 220 220KV CHHURI - MOPKA CKT.NO. II 12:34 19:43 7:09:00

50 30-Mar-21 220 220KV CHHURI - MOPKA CKT. NO. II 11:50 17:38 5:48:00

51 30-Mar-21 220 220KV CHHURI - KOTMIKALA CKT. NO. I 14:59 15:07 0:08:00

52 30-Mar-21 220 220KV CHHURI - KOTMIKALA CKT. NO. II 14:59 15:19 0:20:00

53 01-Mar-21 132 132 KV SIMGA - CHAKARBHATA CKT 19:02 19:16 0:14:00

54 01-Mar-21 132 132 KV BEMETARA - SIMGA CKT 19:01 19:18 0:17:00

55 02-Mar-21 132 132 KV DHAMDHA - PARAMPUJYA CKT NO. II 14:23 14:31 0:08:00

56 02-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 15:02 15:08 0:06:00

57 03-Mar-21 132 132 KV DHAMDHA - PARAMPUJYA CKT No.I 13:27 13:35 0:08:00

58 03-Mar-21 132 132 KV DHAMDHA - PARAMPUJYA CKT No.II 13:27 13:37 0:10:00

59 03-Mar-21 132 132 KV BALODA BAZAR - KASDOL CKT No.I 20:07 20:30 0:23:00

60 04-Mar-21 132 132 KV BASNA - JHALAP CKT 04:48 05:08 0:20:00

61 05-Mar-21 132 132KV DHAMDHA - PARAMPUJYA CKT. NO. II 12:02 12:08 0:06:00

62 05-Mar-21 132 63MVA Xmer & 132MVA Xmer AT S/S BIRGAON 15:10 15:24 0:14:00

63 05-Mar-21 132 63MVA Xmer AT 132KV S/S BIRGAON 16:31 16:40 0:09:00

64 06-Mar-21 132 132KV BHILAI - RASMADA CKT. 13:03 13:34 0:31:00

65 06-Mar-21 132 132KV BHILAI - PULGAON CKT. 13:03 13:38 0:35:00

66 07-Mar-21 132 132 KV RAIGARH - GERWANI CKT 07/03/21 16:50 08/03/21 08:52 16:02:00

67 07-Mar-21 132 132 KV GERWANI - GHARGHODA CKT NO. II 16:50 17:51 1:01:00

68 07-Mar-21 132 132 KV GERWANI - GHARGHODA CKT NO. I 16:50 17:41 0:51:00

69 08-Mar-21 132 132 KV PARASWANI RLY TRACTION NO. I 12:00 12:06 0:06:00

70 08-Mar-21 132 132 KV SIMGA - BEMETARA CKT 17:02 17:15 0:13:00

71 08-Mar-21 132 132 KV PARCHANPAL - KONDAGAON CKT 22:36 22:58 0:22:00

72 09-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 22:37 22:53 0:16:00

73 10-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 23:32 23:51 0:19:00

74 10-Mar-21 132 132 KV GURUR - KURUD CKT 23:31 23:40 0:09:00

75 10-Mar-21 132 132 KV SARAIPALI - BASNA CKT 23:32 23:46 0:14:00

76 10-Mar-21 132 132 KV JHALAP - BASNA CKT 23:32 23:46 0:14:00

77 10-Mar-21 132 132 KV S/S PARASWANI - MAHASAMUND CKT NO. I 23:31 23:53 0:22:00

78 10-Mar-21 132 132 KV S/S PARASWANI - MAHASAMUND CKT NO. I I 23:31 23:54 0:23:00

79 10-Mar-21 132 132 KV PARASWANI - RAJIM CKT NO. I 10/03/21 23:31 11/03/21 00:02 0:31:00

80 10-Mar-21 132 132 KV PARASWANI - RAJIM CKT NO. I I 10/03/21 23:31 11/03/21 00:03 0:32:00

81 10-Mar-21 132 132 KV PARASWANI - JHALAP CKT 10/03/21 23:31 11/03/21 00:07 0:36:00

82 10-Mar-21 132 132 KV PARASWANI - BAGBAHRA CKT 10/03/21 23:31 11/03/21 00:09 0:38:00

83 10-Mar-21 132 132 KV KURUD - DHAMTARI CKT 23:31 23:42 0:11:00

84 10-Mar-21 132 132 KV KURUD - RAJIM CKT 23:31 23:41 0:10:00

85 10-Mar-21 132 132 KV KURUD - MAGARLOAD CKT 23:31 23:42 0:11:00

86 10-Mar-21 132 132 KV KURUD - BHAKHARA CKT 23:31 23:43 0:12:00

87 10-Mar-21 132 132 KV MAGARLOAD - GARIYABAND CKT NO. I 23:31 23:44 0:13:00

88 10-Mar-21 132 132 KV MAGARLOAD - GARIYABAND CKT NO. II 23:31 23:44 0:13:00

89 10-Mar-21 132 132 KV SANKRA - JHALAP CKT 23:31 23:54 0:23:00

132 KV

12. Trippings in Transmission Elements in MARCH-2021.

90 10-Mar-21 132 132 KV JHALAP - BAGBEHRA CKT 23:31 23:50 0:19:00

91 12-Mar-21 132 132 KV KURUD - RAJIM CKT 06:40 06:45 0:05:00

92 12-Mar-21 132 132 KV JHALAP - SANKARA CKT 06:40 06:50 0:10:00

93 12-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 06:42 06:55 0:13:00

94 12-Mar-21 132 132 KV BASNA - JHALAP CKT 06:41 06:50 0:09:00

95 12-Mar-21 132 132 KV PARASWANI - MAHASAMUND CKT No.I 06:40 07:06 0:26:00

96 12-Mar-21 132 132 KV PARASWANI - MAHASAMUND CKT No.II 06:40 07:07 0:27:00

97 12-Mar-21 132 132 KV PARASWANI - JHALAP CKT 06:40 07:11 0:31:00

98 12-Mar-21 132 132 KV PARASWANI - BAGBEHRA CKT 06:40 07:07 0:27:00

99 12-Mar-21 132 132 KV PARASWANI - RAJIM CKT No.I 06:40 07:12 0:32:00

100 12-Mar-21 132 132 KV PARASWANI - RAJIM CKT No.II 06:40 07:28 0:48:00

101 12-Mar-21 132 RLY TRACTION No.I & II AT 132 KV S/S PARASWANI 06:40 06:53 0:13:00

102 12-Mar-21 132 40 MVA XMER No.I & II AT 132 KV S/S PARASWANI 06:52 07:01 0:09:00

103 12-Mar-21 132 132 KV JAGDALPUR - BARSOOR CKT No.II 19:47 20:07 0:20:00

104 13-Mar-21 132 40MVAXmer NO. I AT 132KV S/S BATOLI 6:02 9:17 3:15:00

105 13-Mar-21 132 40MVA Xmer NO. II AT 132KV S/S BARAMKELA 5:06 9:00 3:54:00

106 13-Mar-21 132 132KV BUS AT 220KV S/S URLA 17:18 17:37 0:19:00

107 14-Mar-21 132 132KV SILTARA - URLA - KACHNA CKT. NO. I 10:53 11:08 0:15:00

108 14-Mar-21 132 132KV SILTARA - KACHNA CKT. NO. II 10:53 11:34 0:41:00

109 14-Mar-21 132 132KV SIMGA - CENTURI CEMENT CKT. 11:06 11:24 0:18:00

110 15-Mar-21 132 132 KV KONDATARAI - DABHARA CKT NO. II 03:10 03:47 0:37:00

111 15-Mar-21 132 132 KV SIMGA - BERLA CKT 06:03 06:18 0:15:00

112 16-Mar-21 132 132 KV KUHERA - PARASWANI CKT 00:55 01:21 0:26:00

113 16-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 03:23 03:40 0:17:00

114 17-Mar-21 132 132 KV MUNGELI - NAWAGARH CKT 07:43 08:02 0:19:00

115 17-Mar-21 132 132 KV BARSOOR - JAGDALPUR CKT NO. II 21:04 21:20 0:16:00

116 17-Mar-21 132 132 KV KUHERA - MAHASAMUND CKT 22:44 22:58 0:14:00

117 18-Mar-21 132 132 KV BHILAI - SARONA CKT 13:02 13:16 0:14:00

118 19-Mar-21 132 132 KV JAGDALPUR - BARSOOR CKT No.II 03:18 03:33 0:15:00

119 19-Mar-21 132 132 KV JAGDALPUR - BARSOOR CKT No.II 08:26 08:49 0:23:00

120 20-Mar-21 132 132 KV SIMGA - BHILAI CKT 04:31 12:42 8:11:00

121 20-Mar-21 132 132 KV BHILAI - SARONA CKT 05:10 05:32 0:22:00

122 20-Mar-21 132 132 KV THELKADIH - DONGARGARH CKT No.II 09:15 09:26 0:11:00

123 21-Mar-21 132 132KV PATHALGAON - BATOLI CKT. 9:02 9:17 0:15:00

124 21-Mar-21 132 63MVA Xmer AT 132KV S/S SANKRA 12:27 16:57 4:30:00

125 21-Mar-21 132 40MVA Xmer AT 132KV S/S SANKRA 12:27 13:05 0:38:00

126 22-Mar-21 132 132KV JAGDALPUR - BARSOOR CKT. NO. II 3:25 3:38 0:13:00

127 22-Mar-21 132 132KV KUHERA - MAHASAMUND CKT. 4:33 5:01 0:28:00

128 22-Mar-21 132 132KV DONGARGARH -KIRNAPUR CKT. 18:54 19:42 0:48:00

129 24-Mar-21 132 132 KV MAHASAMUND - KUHERA CKT 06:33 06:45 0:12:00

130 24-Mar-21 132 132 KV BHATAPARA - SIMGA CKT NO. I 17:54 19:26 1:32:00

131 24-Mar-21 132 132 KV MAHASAMUND - KUHERA CKT 21:10 21:22 0:12:00

132 24-Mar-21 132 132 KV MAHASAMUND - KUHERA CKT 21:30 21:51 0:21:00

133 24-Mar-21 132 132 KV MAHASAMUND - KUHERA CKT 22:04 22:22 0:18:00

134 25-Mar-21 132 132 KV GHARGHODA - PATHALGAON CKT 13:05 13:14 0:09:00

135 26-Mar-21 132 40 MVA X-MER NO. II AT 132 KV S/S KURUD (Bhilai) 0:06 0:15 0:09:00

136 26-Mar-21 132 132 KV MANIDRAGARH - TRACTION NO. II 14:37 14:47 0:10:00

137 29-Mar-21 132 40MVA Xmer NO. II AT 220KV S/S PARASWANI 18:54 19:32 0:38:00

12. Trippings in Transmission Elements in MARCH-2021.

138 29-Mar-21 132 132KV SILTARA - GPIL CKT. 29/03/21 21:52 30/03/21 18:58 21:06:00

139 30-Mar-21 132 132KV RLY. TRACTION AT S/S AKALTARA 30/03/21 05:35 31/03/21 06:20 24:45:00

140 31-Mar-21 132 132 KV DHAMDHA - PARAMPUJYA CKT NO. I 12:36 12:43 0:07:00

141 31-Mar-21 132 132 KV BALODA BAZAR - LAFARZ CKT 12:35 12:47 0:12:00

142 31-Mar-21 132 63 MVA X-MER AT 132 KV S/S BORJHARA 13:39 14:08 0:29:00

143 31-Mar-21 132 132 KV BARSOOR - KIRANDUL CKT NO. I 17:35 19:47 2:12:00

144 31-Mar-21 132 132 KV BARSOOR - KIRANDUL CKT NO. II 17:42 20:55 3:13:00

S.N DATETIME OF

OCCURRENCE

CATEGORY

GD-1 TO GD-

5, GI-1 - GI -2

BLACK OUT AT BUSRESTORATION

TIME

MW

AFFECTED

DURATION OF

INTERUPTION

(IN HRS: MIN)

ENERGY NOT

SUPPLIED

(MUs)

REMARKS

1 01-Mar-21 19:02 GD-1 132 KV S/S CHAKARBHATA 19:16 41.31 0:14 0.00040TRIPPING OF 132 KV SIMGA - CHAKARBHATA

CKT

2 03-Mar-21 14:11 GD-1 132 KV S/S PULGAON 14:17 25 0:06 0.00010 TRIPPING OF 132KV BHILAI - PULGAON CKT.

3 06-Mar-21 13:03 GD-1 132KV S/S PULGAON 13:20 25 0:17 0.00030 TRIPPING OF 132KV BHILAI - PULGAON CKT.

4 06-Mar-21 13:03 GD-1 132KV S/S RASMADA 13:34 29.43 0:31 0.00063 TRIPPING OF 132KV BHILAI - RASMADA CKT.

5 10-Mar-21 16:57 GD-1132 KV BANARI AT 220 KV S/S

BANARI17:15 45.67 0:18 0.00057

TRIPPING OF 220 KV MARWA - BANARI CKT NO.

I & II CAUSING INTERRUPTIONS TO FEEDERS

CONNECTED TO BUS-I

6 10-Mar-21 16:57 GD-1 132 KV S/S AKALTARA 17:15 72.34 0:18 0.00090TRIPPING AT 220 KV BANARI & SHUTDOWN AT

132 KV AKALTARA - KVK CKT

7 10-Mar-21 16:57 GD-1 132 KV S/S JAIJAIPUR 17:15 23.81 0:18 0.00030TRIPPING AT 220 KV BANARI& 132 KV JAIJAIPUR

- ADBHAR CKT LINE OPENED.

8 10-Mar-21 16:57 GD-1 132 KV S/S SHEORINARAYAN 17:15 30.86 0:18 0.00039 TRIPPING AT 220 KV BANARI

9 10-Mar-21 16:57 GD-1 132 KV S/S CHAMPA 17:15 47.67 0:18 0.00060

TRIPPING AT 220 KV BANARI& 132 KV CHAMPA -

KE (100) CKT NO. II&132 KV CHAMPA - KE (100)

CKT NO. II LINE OPENED

10 10-Mar-21 23:31 GD-1 220 KV S/S PARASWANI 23:44 161.72 0:13 0.00146

11 10-Mar-21 23:31 GD-1 132 KV S/S MAHASAMUND 23:51 31.62 0:20 0.00044

13. Grid Disturbance in MARCH-2021.

TRIPPING OF 160 MVA X-MER NO. I & II AT S/S

PARASWANI.ALSO TRIPPING OF KUHERA-

MAHASAMUND CKT,132 KV BASNA JHALAP

CKT, 132 KV SARAIPALI - BASNA CKT,132 KV

JHALAP SANKARA CKT &132 KV KURUD RAJIM

CKT,132 KV GURUR - KURUD CKT & 132 KV

KURUD - DHAMTARI CKT

S.N DATETIME OF

OCCURRENCE

CATEGORY

GD-1 TO GD-

5, GI-1 - GI -2

BLACK OUT AT BUSRESTORATION

TIME

MW

AFFECTED

DURATION OF

INTERUPTION

(IN HRS: MIN)

ENERGY NOT

SUPPLIED

(MUs)

REMARKS

13. Grid Disturbance in MARCH-2021.

12 10-Mar-21 23:31 GD-1 132 KV S/S BAGBAHRA 23:50 74.43 0:19 0.00098

13 10-Mar-21 23:31 GD-1 132 KV S/S JHALAP 23:54 70.68 0:23 0.00113

14 10-Mar-21 23:31 GD-1 132 KV S/S BASNA 23:46 29.3 0:15 0.00031

15 10-Mar-21 23:31 GD-1 132 KV S/S RAJIM 23:41 69.29 0:10 0.00048

16 10-Mar-21 23:31 GD-1 132 KV S/S KURUD 23:42 73.35 0:11 0.00056

17 10-Mar-21 23:31 GD-1 132 KV S/S MAGARLOAD 23:42 54.8 0:11 0.00042TRIPPING OF 132 KV KURUD MAGARLOAD &

INTERRUPTION AT 132 KV S/S RAJIM

18 10-Mar-21 23:31 GD-1 132 KV S/S BHAKHARA 23:43 16.2 0:12 0.00014 TRIPPING 132 KV KURUD - BHAKHARA CKT

19 10-Mar-21 23:31 GD-1 132 KV S/S GARIYABAND 23:44 14.74 0:13 0.00013 TRIPPING AT 132 KV S/S MAGARLOAD

20 12-Mar-21 06:40 GD-1 220 KV S/S PARASWANI 06:50 243.25 0:10 0.00169

21 12-Mar-21 06:40 GD-1 132 KV S/S MAHASAMUND 07:06 29.17 0:26 0.00053

TRIPPING OF 160 MVA X-MER NO. I & II AT S/S

PARASWANI.ALSO TRIPPING OF KUHERA-

MAHASAMUND CKT,132 KV BASNA- JHALAP

CKT, 132 KV JHALAP SANKARA CKT &132 KV

KURUD RAJIM CKT.

TRIPPING OF 160 MVA X-MER NO. I & II AT S/S

PARASWANI.ALSO TRIPPING OF KUHERA-

MAHASAMUND CKT,132 KV BASNA JHALAP

CKT, 132 KV SARAIPALI - BASNA CKT,132 KV

JHALAP SANKARA CKT &132 KV KURUD RAJIM

CKT,132 KV GURUR - KURUD CKT & 132 KV

KURUD - DHAMTARI CKT

S.N DATETIME OF

OCCURRENCE

CATEGORY

GD-1 TO GD-

5, GI-1 - GI -2

BLACK OUT AT BUSRESTORATION

TIME

MW

AFFECTED

DURATION OF

INTERUPTION

(IN HRS: MIN)

ENERGY NOT

SUPPLIED

(MUs)

REMARKS

13. Grid Disturbance in MARCH-2021.

22 12-Mar-21 06:40 GD-1 132 KV S/S BEGBEHRA 07:07 74.43 0:27 0.00140

23 12-Mar-21 06:40 GD-1 132 KV S/S JHALAP 06:50 74.43 0:10 0.00052

24 12-Mar-21 06:40 GD-1 132 KV S/S RAJIM 06:45 69.29 0:05 0.00024

25 13-Mar-21 17:18 GD-1132 KV URLA AT 220KV S/S

URLA17:37 60 0:19 0.00079

26 13-Mar-21 17:18 GD-1 132KV S/S GUDIYARI 17:33 38 0:15 0.00040

27 13-Mar-21 17:18 GD-1 132KV S/S BIRGAON 17:40 97 0:22 0.00148

28 13-Mar-21 17:18 GD-1 132KV S/S SECTOR - A 17:39 65 0:21 0.00095

29 13-Mar-21 17:18 GD-1 132KV S/S SECTOR - C 17:38 67 0:20 0.00093

30 13-Mar-21 17:18 GD-1 132KV S/S KACHNA 17:49 56 0:31 0.00121

31 22-Mar-21 18:54 GD-1 220/132 KV S/S THELKADIH 19:08 27 0:14 0.00026TRIPPING OF 220 KV KHEDAMARA-THELKADHI

CKT 1 & 2

32 22-Mar-21 18:54 GD-1 132KV S/S DHAMDHA 19:10 20 0:16 0.00022

TOTAL INTERUPPTION AT 220 KV THELKADIH

S/S , TRIPPING OF 132 KV SAJA-DHAMDHA CKT

& 132 KV DHAMDHA-RASMADA CKT

TRIPPING OF 160 MVA X-MER NO. I & II AT S/S

PARASWANI.ALSO TRIPPING OF KUHERA-

MAHASAMUND CKT,132 KV BASNA- JHALAP

CKT, 132 KV JHALAP SANKARA CKT &132 KV

KURUD RAJIM CKT.

TRIPPING OF 132KV BUS AT 220KV S/S URLA

S.N DATETIME OF

OCCURRENCE

CATEGORY

GD-1 TO GD-

5, GI-1 - GI -2

BLACK OUT AT BUSRESTORATION

TIME

MW

AFFECTED

DURATION OF

INTERUPTION

(IN HRS: MIN)

ENERGY NOT

SUPPLIED

(MUs)

REMARKS

13. Grid Disturbance in MARCH-2021.

33 22-Mar-21 18:54 GD-1 132KV S/S RAJ NANDGAON 19:11 43 0:17 0.00051TOTAL INTERUPPTION AT 132 KV

DONGARGAON S/S & 132 KV THELKADIH S/S

34 22-Mar-21 18:54 GD-1 132KV S/S DONGARGAON 19:14 46 0:20 0.00064TOTAL INTERUPPTION AT 132 KV

RAJNANDGAON S/S & 132 KV MOHLA S/S

35 22-Mar-21 18:54 GD-1 132KV S/S MOHLA 19:15 14 0:21 0.00020TOTAL INTERUPPTION AT 132 KV

DONGARGAON S/S

36 22-Mar-21 18:54 GD-1 132KV S/S DONGARGARH 19:21 29 0:27 0.00054TOTAL INTERUPPTION AT 220 KV THELKADIH

S/S

S.No DATE FROM TO GROUPLOAD

RELIEF

(MW)

DURATION

(hh:mm)

EQUIVALENT

LOAD RELIEF

(MU)

FREQUENCY

(Hz)REMARK

1 10-Mar-21 17:01 18:05 GROUP - E 49.5 1:04 0.05 49.96

2 10-Mar-21 17:01 18:05 GROUP - F 53.4 1:04 0.06 49.96

3 10-Mar-21 17:01 18:05 GROUP - A 54.5 1:04 0.06 49.96

4 10-Mar-21 17:38 18:20 GROUP - B 33.5 0:42 0.02 49.96

5 10-Mar-21 17:38 18:20 GROUP - C 72.5 0:42 0.05 49.96

6 10-Mar-21 17:38 18:20 GROUP - D 79 0:42 0.06 49.96

7 10-Mar-21 18:13 18:31 INDUSTRIAL GROUP - V 90 0:18 0.03 49.92

8 10-Mar-21 18:13 19:25 INDUSTRIAL GROUP - VI 71.5 1:12 0.09 49.92

9 10-Mar-21 18:13 19:36 INDUSTRIAL GROUP - VII 56.4 1:23 0.08 49.92

10 10-Mar-21 18:45 19:45 INDUSTRIAL GROUP - V 66.5 1:00 0.07 49.89

11 10-Mar-21 19:12 19:56 INDUSTRIAL GROUP - I 59 0:44 0.04 49.92

12 10-Mar-21 23:21 23:40 INDUSTRIAL GROUP - II 102 0:19 0.03 50.02

13 15-Mar-21 16:40 17:21 GROUP - E 66.5 0:41 0.05 49.99

14 15-Mar-21 18:12 19:20 INDUSTRIAL GROUP - III 50 1:08 0.06 50.01

15 15-Mar-21 18:15 19:23 INDUSTRIAL GROUP - IV 113 1:08 0.13 50

16 15-Mar-21 18:42 20:04 INDUSTRIAL GROUP - V 82 1:22 0.11 49.86

17 15-Mar-21 19:41 21:30 INDUSTRIAL GROUP - VI 70.5 1:49 0.13 50.07

18 15-Mar-21 20:24 21:30 INDUSTRIAL GROUP - VII 52.6 1:06 0.06 50.07

19 19-Mar-21 11:47 12:41 GROUP - F 65.7 0:54 0.06 49.9

20 19-Mar-21 11:47 12:41 GROUP - A 53.5 0:54 0.05 49.9

21 24-Mar-21 18:00 23:10 INDUSTRIAL GROUP - I 5:10 0.92 50.21

22 24-Mar-21 18:00 23:10 INDUSTRIAL GROUP - II 5:10 0.00 50.21

23 24-Mar-21 18:15 23:10 INDUSTRIAL GROUP - III 46 4:55 0.23 50

24 24-Mar-21 18:36 20:00 GROUP - A 1:24 0.15 49.99

25 24-Mar-21 18:36 20:00 GROUP - B 1:24 0.00 49.99

26 24-Mar-21 19:56 20:42 GROUP - C 0:46 0.14 50

27 24-Mar-21 19:56 20:42 GROUP - D 0:46 0.00 50

28 24-Mar-21 23:05 24/03/2021 04:05 25/03/2021 INDUSTRIAL GROUP - V 51 5:00 0.26 49.87

29 24-Mar-21 23:05 24/03/2021 04:15 25/03/2021 INDUSTRIAL GROUP - VI 100 5:10 0.52 49.87

30 24-Mar-21 23:05 24/03/2021 04:25 25/03/2021 INDUSTRIAL GROUP - VII 48.4 5:20 0.26 49.87

31 24-Mar-21 18:33 24/03/2021 03:52 25/03/2021 INDUSTRIAL GROUP - IV 113.5 9:19 1.06 50.01

32 25-Mar-21 06:40 07:35 GROUP - E 79.5 0:55 0.07 50.05

33 25-Mar-21 06:40 08:10 GROUP - F 62.1 1:30 0.09 50.05

34 25-Mar-21 20:57 21:45 INDUSTRIAL GROUP - I 59 0:48 0.05 50.03

35 25-Mar-21 21:12 22:03 INDUSTRIAL GROUP - II 110 0:51 0.09 50.01

36 25-Mar-21 23:13 25/03/2021 00:17 26/03/2021 INDUSTRIAL GROUP - III 168 1:04 0.18 50.01

37 25-Mar-21 23:13 25/03/2021 01:24 26/03/2021 INDUSTRIAL GROUP - IV 168 2:11 0.37 50.01

LOAD SHEDDING DONE IN MARCH-2021

1. KORBA WEST-UNIT No.1 (210

MW) UNDER AOH SINCE

19.12.2020 AT 23:55 Hrs 2.

ABVTPS UNITS (2X500) TRIPPED

AT 16:57 HRS ON 10.03.2021.

3.TOTAL OUTAGE = 1210 MW

1. KORBA WEST-UNIT No.1 (210

MW) UNDER AOH SINCE

19.12.2020 AT 23:55 Hrs 2.

KORBA WEST-UNIT No.2(210

MW) STOPPED ON 14.03.2021

AT 21:18 Hrs. 3.TOTAL OUTAGE

= 420 MW

1. KW-UNIT No.1 (210 MW) STOPPED ON

19.03.2021 AT 20:55 Hrs. 2.KW-UNIT

No.3 (210 MW) STOPPED ON 17.03.2021

AT 19:51 Hrs. 3. KW-UNIT No.5 (500

MW) STOPPED ON 19.03.2021 AT 11:29

Hrs. 4.TOTAL OUTAGE = 920 MW

178

1. KW-UNIT No.1 (210 MW)

STOPPED ON 19.03.2021 AT

20:55 Hrs. 2. KORBA WEST-

UNIT No.2(210 MW) STOPPED

ON 23.03.2021 AT 18:31 Hrs. 3.

KORBA WEST-UNIT No.3(210

MW) STOPPED ON 17.03.2021

AT 19:51 Hrs. 4.TOTAL OUTAGE

= 630 MW

105

181.5

1. KW-UNIT No.1 (210 MW)

STOPPED ON 19.03.2021 AT

20:55 Hrs. 2. KORBA WEST-UNIT

No.3(210 MW) STOPPED ON

17.03.2021 AT 19:51 Hrs.

3.TOTAL OUTAGE = 420 MW

S.No DATE FROM TO GROUPLOAD

RELIEF

(MW)

DURATION

(hh:mm)

EQUIVALENT

LOAD RELIEF

(MU)

FREQUENCY

(Hz)REMARK

LOAD SHEDDING DONE IN MARCH-2021

38 26-Mar-21 18:28 19:32 INDUSTRIAL GROUP - IV 79.5 1:04 0.08 49.98

39 26-Mar-21 18:36 19:41 INDUSTRIAL GROUP - VI 58 1:05 0.06 50.02

40 26-Mar-21 26/03/2021 23:02 27/03/2021 0:11 INDUSTRIAL GROUP - VII 49.9 1:09 0.06 50.02

41 27-Mar-21 06:53 07:36 GROUP - A 51 0:43 0.04 50.031. DSPM-UNIT No.2 (250 MW)

STOPPED ON 27.03.2021 AT 12:26

Hrs. 2.TOTAL OUTAGE = 250 MW

1. KW-UNIT No.1 (210 MW)

STOPPED ON 19.03.2021 AT

20:55 Hrs. 2.1. KW-UNIT No.4

(210 MW) STOPPED ON

26.03.2021 AT 1:37 Hrs. 3.TOTAL

OUTAGE = 420 MW

Sub Station ICT [MVA]N-1

ContingencyICT

Overloaded

(% of time)

220 KV Banari 2 x 160 167.2 0.00

220 KV Barsoor 1 x 160+1X120 167.2 0.00

220 KV Bhilai 2x160+3x125 595.65 0.00

220 KV Bhatapara 2 x 160+1X125 334.4 0.00

220 KV Borjhara 2 x 160 167.2 34.44

220 KV Bemetara 2 x 160 167.2 0.00

220 KV Doma 2 x 160 167.2 0.00

220 KV Dhardehi 3 x 160 167.2 0.00

220 KV Gurur 3 x 160 334.4 46.44

220 KV Korba [East] 2 x 160 167.2 0.00

220 KV Kuthrel 2 x 160 167.2 0.00

220 KV Mopka 3 x 160 334.4 0.00

220 KV Kotmikala 2 x 160 167.2 0.00

220 KV Paraswani 2 x 160 167.2 98.42

220 KV Raigarh 3 x 160 334.4 5.48

220 KV Siltara 3 x 160 334.4 0.00

220 KV Saraipali 2 x 160 167.2 96.00

220 KV Suhela 2 x 160 167.2 0.00

220 KV Thelkadih 2 x 160 167.2 42.51

220 KV Urla 3 x 160 334.4 0.40

400 KV Khedamara 3x315 329 81.75

400 KV Kurud 2x315 329 45.16

400 KV Raita 2 x 315 329 5.21

400 KV Jagdalpur 2 x 315 329 0.00

2.Data of 220KV S/S Bishrampur not available.

16. Overloading of ICTs under N-1 Contingency for the month of MARCH-

2021.

3. 315 MVA 400/220 KV BHEL Make X-mer No 3 at 400 KV S/S Khedamara out of circuit

since 28.05.20 .Hence Contingency taken accordingly considering two numbers X-mers in

service.

Remarks : 1. (N-1) contigency is calculated taking 0.95 p.f and 10 % overloading of