system online august 20, 2002 15:54:07 cet 8 th annual ceenet network technology workshop

4
System Online August 20, 2002 15:54:07 CET 8 th Annual CEENet Network Technology Workshop

Upload: samuel-joseph

Post on 19-Jan-2016

217 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: System Online August 20, 2002 15:54:07 CET 8 th Annual CEENet Network Technology Workshop

System Online August 20, 2002 15:54:07 CET

8th Annual CEENetNetwork Technology Workshop

Page 2: System Online August 20, 2002 15:54:07 CET 8 th Annual CEENet Network Technology Workshop

Silk Installation Learnings• All cables should be included and shown on

the wiring diagram. Cables and connection points should be clearly labeled .

• Reorganize the SatComm equipment in the rack to leave pre-arranged space for the DataComm equipment and add sufficient power strips.

• All assembly hardware (nuts, bolts, cable ties, gaskets, silicon grease, etc.) should be provided, checked and marked.

Page 3: System Online August 20, 2002 15:54:07 CET 8 th Annual CEENet Network Technology Workshop

Silk Installation Learnings• Assembly diagrams, with pictures should be

provided showing step by step instructions for mounting the hardware and routing the cables.

• A document with basic info about IP configuration (networks, addresses, NetMasks) should be provided.

• Include instructions for setting up a local Linux system console.

• Include contact info (phone, e-mail) list of persons (or group) who have the knowledge or troubleshooting.

Page 4: System Online August 20, 2002 15:54:07 CET 8 th Annual CEENet Network Technology Workshop

Silk Installation Learnings

• Better yet, send an expert with the equipment.