system hardware *draft* 08/09/2000
DESCRIPTION
System Hardware *Draft* 08/09/2000. What hardware will we need for: Development of DSpace Initial rollout of DSpace to customers DSpace usage through ~06/2002. Proposed Hardware FY’2000. Web Requests. switch. App Server. App Server. App Server. Production Environment. Little Brother - PowerPoint PPT PresentationTRANSCRIPT
System Hardware*Draft* 08/09/2000
• What hardware will we need for:– Development of DSpace– Initial rollout of DSpace to customers– DSpace usage through ~06/2002.
Proposed HardwareFY’2000
De
velo
pmen
tE
nvi
ronm
ent
Pro
duct
ion
En
viro
nmen
t
Big BrotherN-Class
Production Server
- Mirrored Metadata- Unmirrored Data Siloon each of two partitions:- staging & regression- production
Little BrotherN-Class
Staging Server
RAID
AppServer
switch
Web Requests
AppServer
Little Brother upgradableto carry production loadif necessary, whileupgrades and/ormaintenance occurson Big Brother
AppServer
WS / App Server
WS / App Server
WS
WS
WS
TrailBlazerN-Class
Dev Server
Backup Server
Tape BackupSystem
WSNew FY2000 Existing
Legend:
Prod Capacity
Proposed HardwareFY’2001
De
velo
pmen
tE
nvi
ronm
ent
Pro
duct
ion
En
viro
nmen
t
Big BrotherN-Class
Production Server
Little BrotherN-Class
Staging Server
RAID
AppServer
switch
Web Requests
AppServer
Little Brother upgradableto carry production loadif necessary, whileupgrades and/ormaintenance occurson Big Brother
AppServer
WS / App Server
WS / App Server
WS
WS
WS Tra
ilBla
zer
N-C
lass
Dev
Ser
ver
Backup Server
Tape BackupSystem
WS
AppServer
switch VideoServer
Prod Capacity
xtra CPU / DRAMxtra CPU / DRAM
Tape BackupSystem
Prod Capacity
New FY2001 Existing
Legend:
Rationalization (1)
• Need distinct development and production environments– Must develop & improve DSpace while customers are using it.
– Set up this infrastructure sooner rather than later
• Need staging server distinct from production server– primary problem solved: regression before production installation
– secondary problem solved: prod/staging servers are switchable (no installation/upgrade induced
downtime)
• Need app server web front ends– for scaling traffic. Start with two to prove it works.
Rationalization (2)
• Need mirrored metadata (to avoid reconstructing a DB)
• Do NOT need mirrored data silo(tape backup, <24 hour latency will suffice)
• Buy only enough CPUs, Disk, Tape to get by in FY 2000.– Get entire server infrastructure in place, but…
– Price of CPUs, Disks will fall with time, so wait until FY 2001 to buy and install production capacity.
What to BuyFY2000
FY 2000• (1) Local Director IP Switch prod load balance• (1) N-Class, 2way, 4GB RAM, 200GB RAID Big Brother• (1) N-Class, 2way, 4GB RAM Little Brother• (3) LpR, 2way, 1GB RAM App Servers• (1) N-Class, 2way, 4GB RAM Dev Server• (1) A-Class, ?? 1way, 1GB RAM ?? Backup Server• (1) Tape System Backup Storage
What to BuyFY2001
FY 2001• +1 Local Director IP Switch Staging Load Balance• CPU/DRAM upgrades Big/Little Brother• +1 LpR App Server• Disk upgrades Prod Server• Prod Backup Latency Backup Server/Storage• (1) Streaming Video Server• Software Licenses