system hardware *draft* 08/09/2000

7
System Hardware *Draft* 08/09/2000 • What hardware will we need for: – Development of DSpace – Initial rollout of DSpace to customers – DSpace usage through ~06/2002.

Upload: cedric-grimes

Post on 01-Jan-2016

22 views

Category:

Documents


2 download

DESCRIPTION

System Hardware *Draft* 08/09/2000. What hardware will we need for: Development of DSpace Initial rollout of DSpace to customers DSpace usage through ~06/2002. Proposed Hardware FY’2000. Web Requests. switch. App Server. App Server. App Server. Production Environment. Little Brother - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: System Hardware *Draft* 08/09/2000

System Hardware*Draft* 08/09/2000

• What hardware will we need for:– Development of DSpace– Initial rollout of DSpace to customers– DSpace usage through ~06/2002.

Page 2: System Hardware *Draft* 08/09/2000

Proposed HardwareFY’2000

De

velo

pmen

tE

nvi

ronm

ent

Pro

duct

ion

En

viro

nmen

t

Big BrotherN-Class

Production Server

- Mirrored Metadata- Unmirrored Data Siloon each of two partitions:- staging & regression- production

Little BrotherN-Class

Staging Server

RAID

AppServer

switch

Web Requests

AppServer

Little Brother upgradableto carry production loadif necessary, whileupgrades and/ormaintenance occurson Big Brother

AppServer

WS / App Server

WS / App Server

WS

WS

WS

TrailBlazerN-Class

Dev Server

Backup Server

Tape BackupSystem

WSNew FY2000 Existing

Legend:

Page 3: System Hardware *Draft* 08/09/2000

Prod Capacity

Proposed HardwareFY’2001

De

velo

pmen

tE

nvi

ronm

ent

Pro

duct

ion

En

viro

nmen

t

Big BrotherN-Class

Production Server

Little BrotherN-Class

Staging Server

RAID

AppServer

switch

Web Requests

AppServer

Little Brother upgradableto carry production loadif necessary, whileupgrades and/ormaintenance occurson Big Brother

AppServer

WS / App Server

WS / App Server

WS

WS

WS Tra

ilBla

zer

N-C

lass

Dev

Ser

ver

Backup Server

Tape BackupSystem

WS

AppServer

switch VideoServer

Prod Capacity

xtra CPU / DRAMxtra CPU / DRAM

Tape BackupSystem

Prod Capacity

New FY2001 Existing

Legend:

Page 4: System Hardware *Draft* 08/09/2000

Rationalization (1)

• Need distinct development and production environments– Must develop & improve DSpace while customers are using it.

– Set up this infrastructure sooner rather than later

• Need staging server distinct from production server– primary problem solved: regression before production installation

– secondary problem solved: prod/staging servers are switchable (no installation/upgrade induced

downtime)

• Need app server web front ends– for scaling traffic. Start with two to prove it works.

Page 5: System Hardware *Draft* 08/09/2000

Rationalization (2)

• Need mirrored metadata (to avoid reconstructing a DB)

• Do NOT need mirrored data silo(tape backup, <24 hour latency will suffice)

• Buy only enough CPUs, Disk, Tape to get by in FY 2000.– Get entire server infrastructure in place, but…

– Price of CPUs, Disks will fall with time, so wait until FY 2001 to buy and install production capacity.

Page 6: System Hardware *Draft* 08/09/2000

What to BuyFY2000

FY 2000• (1) Local Director IP Switch prod load balance• (1) N-Class, 2way, 4GB RAM, 200GB RAID Big Brother• (1) N-Class, 2way, 4GB RAM Little Brother• (3) LpR, 2way, 1GB RAM App Servers• (1) N-Class, 2way, 4GB RAM Dev Server• (1) A-Class, ?? 1way, 1GB RAM ?? Backup Server• (1) Tape System Backup Storage

Page 7: System Hardware *Draft* 08/09/2000

What to BuyFY2001

FY 2001• +1 Local Director IP Switch Staging Load Balance• CPU/DRAM upgrades Big/Little Brother• +1 LpR App Server• Disk upgrades Prod Server• Prod Backup Latency Backup Server/Storage• (1) Streaming Video Server• Software Licenses