file document.doc as of 06-03-2022 04:06:35 AM Syllabus -- Fall 2004 Subject to revision to correct errors and omissions and/or in the interest of fairness. GMU policies and procedures take precedence should there be a discrepancy between any of them and this syllabus. Students should read the syllabus and confirm the dates shown. Deliverables and processes will be discussed in class. Please notify the instructor of any errors, omissions, or contradictions. Syst 798 -- Research Project Sections 002 & 632 CRN 74515 & 76152 GMU -- Fairfax & Dahlgren Instructor William Adams, PE, PhD [email protected] Please do not send attachments. Please virus check your PC before sending emails or creating softcopy of files. Thanks. Other contact information will be given in class. Office: TBD - best to see me before or after class 1 of 36

Upload: phungcong

Post on 03-May-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

file document.doc as of 08-05-2023 12:57:18 AM

Syllabus -- Fall 2004Subject to revision to correct errors and omissions and/or in the interest of fairness. GMU policies and procedures take precedence should there be a discrepancy between any of them and this syllabus.

Students should read the syllabus and confirm the dates shown. Deliverables and processes will be discussed in class. Please notify the instructor of any errors, omissions, or contradictions.

Syst 798 -- Research Project Sections 002 & 632CRN 74515 & 76152

GMU -- Fairfax & Dahlgren

InstructorWilliam Adams, PE, [email protected] – Please do not send attachments.Please virus check your PC before sending emails or creating softcopy of files. Thanks.

Other contact information will be given in class.Office: TBD - best to see me before or after class

Schedule of class meetings Tuesdays (but see the GMU schedule of classes for recess, holiday closings, one time exceptions, etc. ) Check the GMU phone number for late breaking snow cancellation information.

Time: 16h30 – 19h10 J **Bldg.- Room -- IN 131 & NSWC Bldg 216 Room 116 [JD's Training and Conference Center 17320 Dahlgren RD]

1 of 26

(Also see the Detailed schedule with planned lectures and assignments below). Some generic assignment dates will be instantiated in class eg which specific date(s) you/your team is assigned.

Schedule StrategyWe must get a running start or risk not being able to complete the project on time without a lot of effort concentrated near the end of the semester.

Students should come to the first class with a possible topic, a general outline of a technical report, and a moderately detailed list of steps that need to be performed.

We will discuss these and tailor them as appropriate.

No Tuesday class is held at GMU on 12 October 2004 TBV due to Columbus Day; because those Monday GMU classes meet on Tuesday that week.NB: The fall schedule of classes has Columbus day as the 13th (sic) (Wednesday), my calendar says it is the 11th (Monday).Students should continue to be working diligently this week; and be prepared to present/submit deliverables due the next class as shown on the schedule below.

Many classes will start with group discussions and or presentations, followed by team working sessions/faculty consultation, and followed by optionally individual consultation as desired. Lectures will be minimal and primarily address administrative items, unless specific topics are requested by the students.

If we do not need all the class time then the groups should use the rest of session to coordinate their work and continue working on their TR (Technical Report). I will stay to answer questions and consult as needed.

We will not meet every week. Students are expected to continue to work diligently and use the class time for their project. Status reports are due every week whether we meet or not. They can be emailed as text in the email on those days.

If a team needs additional consultation about their project they may schedule it for an off week but the rest of the class will not be required to attend that session.

2 of 26

CommunicationsMost communications will be by email or in class.

Students must provide contact information that is functional. Students are responsible for all group/team broadcasts sent to the email(s) provided.

Please provide work, home, and any alternate emails and phone numbers that may be necessary to ensure that you get course information without delay. Phone calls will be limited to emergency situation such as snow preventing class from being held.

Teams may choose to communicate amongst themselves by any method they prefer. Many teams make heavy use of email, and/or web based bulletin boards, wikis, etc.

Course DescriptionResearch Project. Prerequisite 21 Graduate Credits.This course is the capstone course for the MS program in SE and/or OR, for those who choose the project option instead of the thesis option.

Either Syst798 (fall) or OR680 (spring) may be taken as the required project course.

As is common with the capstone course at many universities, this course uses a team oriented approach

This course will use many of the systems engineering and related skills normally developed through previous classes and as would be used in a business teamwork environment. Soft skills as well as technical ones will be exercised.

Students will select a research project, which will be completed under the guidance of the graduate faculty member assigned to the class. A condensed version of the report will be presented orally to the SEOR faculty which must approve the work done. A hard copy of the complete report will also be turned in and graded separately.

See details below of all deliverables that are required.

3 of 26

Project DescriptionThe project must reflect a real life problem or application and ideally will have a sponsor. Note: GMU policy does not allow for anyone to have a project that they are also being paid for doing.

Projects must also involve analytical components such as a decision and or risk analysis, cost benefit and tradeoff analysis, mathematical modeling, simulation, etc. Projects should also include a data gathering element.

The project will be done by teams of 3-5 persons. Teams will be self selected and formed by the students at the first class.

Each person must have explicit responsibilities that they do on their own.

Each team member must provide part of the final briefing at 1300J in the Johnson Center at GMU on 10 December 2004.

Participation is important. All teams should review and comment on other teams work during in-class reviews.

Objective/OutcomesCreate a technical report (TR) using the KSAs gained through previous coursework or experience. The report must be acceptable to the SEOR faculty.

Students will demonstrate what they have learned by gathering data and analysing it by applying an appropriate SE process.

The report should be comparable to one given at a conference or printed in professional publications.

Ideally the TR will be accepted by a conference, or journal, or published internally by the student's employer.

“Best Practices” of SE Processes are to be used. The processes should be tailored to facilitate the technical report project.

4 of 26

ExpectationsEach student will succeed in helping their team achieve an acceptable TR by working diligently and cooperatively by using the SE skills and techniques from their previous courses.

5 of 26

Textbook and Reference Materials Text: None.

Some useful references: Technical Report Writing NASA Technical Memorandum 105419Was recently available at http://grcpublishing.grc.nasa.gov/editing/vidcover.cfmhttp://grcpublishing.grc.nasa.gov/editing/vidoli.CFMHighly Recommended !!

How To Write And Publish Engineering Papers And Reports 3EMichaelson, Herbert B.Phoenix AZOryx Press 1990T11.M418 1990

How To Write And Present Technical Informaton 3ESides, Charles H.Phoenix AZOryx Press 1999T11.M418 1990

Writing And Speaking In The Technology Professions: A Practical GuideBeer, David F.New YorkIEEE Press c1992T11.W75 1992

The Craft Of ResearchBooth Colomb and WilliamsQ180.55.M4 B66 1995University of Chicago Press

Practical Research Planning and Design 6ELeedy, Paul D.Q180.55.M4 L43 1997Prentice Hall (Simon & Schuster) 1997

IEEEhttp://standards.ieee.org/guides/style/

Textbooks from previous courses.

6 of 26

Other AssistanceResearchFor help with research, Kelly Jordan, Information Technology and Engineering Librarian, is a useful resource. Stop by the Fenwick library or email her at [email protected].

WritingFor help with writing, the GMU writing center may be useful. There are many web sites that provide writing and grammar assistance. Many universities have on line writing centers (OWL = online writing lab) for assistance. The GMU center is athttp://writingcenter.gmu.edu/owl/

Some OWLS are listed at http://owl.english.purdue.edu/internet/owls/writing-labs.html

NOTEWhilst grammar and style are important, quality content is the first priority. Do not get sidetracked with mechanics before the content has been instantiated. But allow time to create a quality document.

Course RequirementsSee details below under deliverables and schedule.

Students will tailor and use a process to be followed. Metrics will be captured and progress tracked versus the schedule based on the planned tasks.

Interim status presentations will be made periodically as if to a corporate director.

A final presentation will be presented as well as a final hard and soft copy of the report being turned in. This would be comparable to one given to a corporate VP or at a technical conference. Faculty and advisors will be invited to the final presentations.

A project plan with sufficiently detailed list of tasks, schedules, persons assigned, milestones, etc., to execute and control the project, will be turned in.

7 of 26

At the end of the semester, the plan with any modifications made, and indicating actual results will be turned in including metrics captured that can help future planning .

An earned value report for the team will be due weekly.

Team and individual status reports will be due weekly.

Each person must turn in an AALL (After Action /Lessons Learned) report with suggested process improvements for the course, team, and individuals. This AALL should cover everything that can be improved, including the strategy, processes, instructor, syllabus, room, A/V equipment, project plan, teamwork, research, analysis, writing, etc..

Each person will turn in an evaluation of themselves as well as all teammates contributions. This will be used as a guide to adjust the team scores for each individual.

Each team should turn in all artifacts they used or located that they used and/or could help future teams. This should include a list of bookmarks for web resources.

The key deliverable is the technical report and a formal presentation to the faculty.Interim presentations and status reports will be given in class.

There are no formal exams.

8 of 26

Grading CriteriaGrades will be per GMU policy. This course uses required grading scheme GT for graduate courses.

Students will be required to turn in a self assessment as well as one for their team. Students will assess the other presentations.

Faculty will be invited to the final presentation and to review the final TR. Their feedback will be given considerable weight.

The final grade will be determined by myself with consideration given to inputs from student and faculty evaluations.

Grades will be based on the following items - with the noted relative weighting factors.

30% - Final written Technical Report - teams self allocate distribution of total awarded points. Emphasis is on content, but presentation and mechanics will count NOTE: allocation is based on a par of 100% of the team grade.

Awards may be smaller for those who do not contribute and may be larger for someone who carried the team by doing more than their share.

40% - Final oral Presentation - teams self allocate distribution of total awarded by the faculty Emphasis is on content, but presentation and mechanics will count NOTE: allocation is based on a par of 100% of the team grade.

Awards may be smaller for those who do not contribute and may be larger for someone who carried the team by doing more than their share.

20% - AALL and other required team/individual submissions. 10% - Status reports – Team and individual Additional bonus points may be awarded for

Draft presentions or other work of exceptional qualityClass participation - PAL contributions Miscellaneous - TBD

Late workLate work is accepted but the grade is reduced by 10% a week unless an acceptable reason is provided.

If you anticipate any religious holidays, employer mandated travel, health appointments, or critical personal issues (tax audits, court appearances, funerals, weddings, etc.), that will require you to miss class or be late

9 of 26

with work please notify the instructor as early as possible. And coordinate with your team so they are not impacted too. Confirming documentation is required.

Even if you have an excused absence, you must still meet all of your team commitments! If your team does not consider your excuse acceptable they may lower their assessment of your contributions which will lower your final grade.

Conversely, any superstars that do more than expected may have their grade increased based on the team’s assessment of that effort.

Scale A+ 98-100+A 93-97A- 90-92B+ 87-89B 83-86B- 76-82

C 63-75

F 62

Other grades are theoretically possible in accordance with GMU policy:IN incomplete - missing work - shows as F AB - absent last day with acceptable excuse - ten day limit to finishS - no grade required NC - no grade required IP in process - will require department approval

Success CriteriaA Sample TR will be provided as a guide.

Details of specific presentation and TR grading criteria will be provided in class.

10 of 26

Honor CodeAttention should be paid to the honor code provisions.

All work is open book, open notes, and done collaboratively, as would occur in an industrial team oriented project environment.

For academic purposes though, acknowledgement must be made of all sources used. This includes all team and classmates, colleagues at work, text books, web references, etc.

Work is intended to be done collaboratively with their team, and/or the class. Teams may help each other but acknowledgement is to be given to such help.

Proper credit is to be given to any other information sources used by citing them in the TR.

Style and usageUse the GPO or Chicago style manuals for citation format.Use the Columbia guide for web based content citations. Harbrace College Handbook or Hacker are good guides for grammar usage. References:The Chicago Manual of Style 13E (or later)ChicagoU of Chicago 1982

Style Manual rev.US GPO WashingtonGPO 1973 (or later)http://www.gpoaccess.gov/stylemanual/browse.html

Rules for Writer 3E (or later)Diana HackerBostonSt Martin's Press 1991

The Columbia Guide to Online Style by Janice R. Walker and Todd Taylor (Columbia UP, 1998) http://www.columbia.edu/cu/cup/cgos/idx_basic.html

11 of 26

Class Policies and ApproachAll applicable laws and GMU policies are hereby included by reference.Students are responsible for knowing the school policies as documented in the Catalog including the honor code provisions.

Smoking is not allowed in the classroom.

All notes as well as class submissions should be annotated with a timestamp and the source.

Acknowledgement of all sources is expected if material from a textbook, website, intra/inter-team collaboration, or class discussions is used.

Students are expected to attend all sessions on time.

You may synchronise your watches by telephone at 202 762 1401. be prepared participate actively be alert, having had adequate sleep and rest manage their time effectively

plan their work and budget their time keep a log of all resources expended do not get behind

coordinate and work with their team effectively and collegially first attempt to do all the work by themselves

ask for help when necessary

Teamwork is an integral factor of this course. All students are expected to work in a collaborative and cooperative manner both on their project team and in the class as a whole. Planning and coordination are expected to minimise duplication of efforts.

Communication is vital to success and will be emphasised through in-class briefings concerning the team projects and written status reports.

AccommodationsAny student needing accommodation for a handicap will be given whatever course modifications they need as determined appropriate by the DRC staff. The DRC form is required.

12 of 26

Project/AssignmentsThe main product is a technical report. A final oral presentation will also be given. Interim status reports and drafts will be due.

Each student is to log all resources used by category for the entire course. This will be used to create the metrics turned in as part of the other course deliverables.

Frequently, status reports will be presented by teams as well as being turned in for evaluation.

Additional items will be assigned in class.

For matsPlease provide hardcopy of all assignments. Softcopy is also required for the final report and presentation as well as the AALL and PAL contributions.

E-mail formatWhen sending emails, please put 798 as the first item in the subject line, followed by your name, team number, and a sequence number, then a few keywords of the subject.

Please include the actual time and date at the top of the message.

Please do not send attachments.

FontsTo prevent my having eyestrain or other visual problems:Please use a font that is 12-14 points, with 2-3 points of leading for text. Do not justify, ie use ragged right margins.

Use 1.5" left margin and all other margins set at 1".If headers/footers are used and/or page numbers, then they should be spaced 1/2" from the text body.

Preferred fonts are American Typewriter aka Editor, or Dark Courier. Other large x-height fonts with uniform stroke weight may be used; but, please confirm readability with the professor first. Thanks!

Trebuchet and Antiqua are other MS fonts that may be used.

13 of 26

Do not use Garamond or (new) times roman or similar fonts with small x-height or tight tracking. If you prefer that style of font then please use Georgia instead, which is a free MS font that is equivalent in style, but was designed to be easy to read.

Fonts can be provided to those who do not have them and are unable to download them from Microsoft, HP, or public domain sites.

Spreadsheets and similar items should use Arial Narrow 8-10 point.

TIPS: Do not procrastinate Communicate Log all references used in real time

o Easier than trying to go back to find themo Web sites disappear

Capture any web pages that are used in the reporto Fully format each reference as it is captured

Timestamp all artifacts to ease CM/DM version control Work Smart not Hard Do the requirements right before starting Allow buffer time for contingency

o Consider using Goldratt Critical Chain Do the outline early on

o Fill in as you go – helps easy CM and version control One master copy on the web helps versioning

o Coordinate so only one person changes things at a time

14 of 26

Deliverables – see schedule below for due dates Note: Most of these are small routine items that you need to do your work anyway.

1. Final oral presentation given to faculty. – Team – a. 30 copies of the slides used – 2/page & double sided okayb. Softcopy of the powerpoint files used - to load on PC

2. Final written technical report – Team – a. Three copies hardcopyb. One Softcopy CDrom or Floppy

3. Class participation – Individual – weekly 4. Team artifacts - others supporting the plan – typically 1 page

eacha. Team Charter b. Ground rulesc. Roles and task assignments

1) Due date2) Criteria for acceptability

d. Communications processe. Meeting processf. Decision processg. Conflict resolution process h. Writing process i. Risk planj. Peer Reviewk. CM/DM or version control process l. Others if appropriate

5. Status reports – Team tasks only, time spent by task- weekly - extract from individual status reports - OPTIONAL with a resulting Earned Value estimate

6. Status reports – Individual – with team tasks allocated to team WBS – weekly

7. Project Plan – MS Project – Initial Planned – Team a. WBS sufficiently detailed to monitor and control the projectb. Tasks allocated to a team memberc. Gantt Version to show dependencies and time estimate

8. Earned value report – team – weekly – with team status report 9. Project Plan – Final Actual – Team

a. Show actual effort used b. Reflects all changes to original plan

10. Project Proposal – Team 11. Report Outline – Template or DID – Team12. Interim status briefings – Team – oral status report

15 of 26

a. Each team member must be prepared to give the report1) Presenter will be selected at random

13. Interim artifacts – team – a. Report outline - with some detailb. Datac. Bibliographyd. Analysise. Rough draft – paperf. Presentation outlineg. Rough draft – presentation h. Dry Run presentationi. Near Final Draft – paper j. Rough outlinek. Draft presentationl. Final draft paper

14 AALL – Individuals -- hard and softcopy 15 PAL (Process Asset Library) Artifacts - TEAM – hard and softcopy

a) Reference documentsb) Sample of all team generated artifacts for reuse c) Web Favorites/Bookmark list (softcopy)

16 Team and self evaluations and grade allocation recommendations.

-------------------------------------------------Notes:

** J = local time. We change from DST to EST in October.

-------------------------------------------------

The Schedule is Below in Landscape Orientation

-------------------------------------------------

16 of 26

Schedule -- Refers to Deliverables as numbered above Line Week

nr. Class nr.

Date Student activity Class agenda Team Items Due

Individual Items Due

Notes

12 Identify

possible topic

Think about what tasks are necessary

Think about the contents of a TR eg high level outline

Read Syllabus

34 1 1 31-Aug-04 Teams meet –

exchange contact info, determine communications methods, next meeting, initial steps necessary for next class.

Administrative items Kickoff/Introduction Go over Syllabus Review Schedule Review Requirements Teams Process to be tailored Resources Grading Deliverables DIDs/Templates Q&A - Discussion

o Break Teams Assigned Identify Possible Topics Brainstorm alternatives Discussion

- possible topic

- high level tasks to be done- high level outline of a TR

17 of 26

Tentative topic selection - primary and one alternate

Teams meet briefly Identify supporting topics

eg time management etc. Wrap up – Final questions

5 Teams – Storm & Norm

Document Team processes; set up meetings, communications, initial task assignments, etc.

WBS Draft Plan

Investigate topicsFocus topicsSelect

Prepare proposal

6 2 2 7-Sep-04 Team ProposalsDiscussion

optional team working session

Will meet with teams or individuals if requested at the end of any class

41013J

58

36

3&6;5&8 due every scheduled class whether we meet or not – fax or email as text

7 Teams Form (Gel)

Finalise Plan and Sked

Continue working tasks

18 of 26

8 3 3 14-Sep-04 Present status – plans emphasis but also sked problems etc briefly

optional team work sessions

I will be available for consultation during the rest of the class while any students remain

712

58

36

I will give you comments on any item turned in if you request.

I may comment on them anyway.

9 Teams Perform

Work Your Plan!!

10 4 4 21-Sep-04 Project status - progress including outlines but briefly problems etc

working sessions consultation as requested

111213A

58

36

11optional appointment for consultation

Keep Working!

12 5 5 28-Sep-04

Keep Working your plan!

Formal Class Not Planned

Will meet with any team that requests it by previous Friday

12

58

36

13Keep Working your plan!

14 6 6 5-Oct-04Keep Working your plan!

Present status – data emphasis but also progress and problems briefly

13B

5

36

19 of 26

working sessions consultation as requested

8

15Keep Working your plan!

16 7 12-Oct-04 Keep Working your plan!NO CLASS – GMU Holiday

-- -- No Class

17

Keep Working your plan!

18 8 7 19-Oct-04 Present Status – emphasis analysis but briefly progress and problems

working sessions consultation as requested

1213D

58

36

19 optional appointment for consultation

Keep Working your plan!

20 9 8 26-Oct-04Keep Working your plan!

Formal Class Not Planned

Will meet with any team that requests it by previous Friday

58

36

21

Keep Working your plan!

22 10 9 2-Nov-04 Status – progress and problems 12 3

20 of 26

working sessions consultation as requested

58

6

23Keep Working your plan!

24 11 10 9-Nov-04 Present status emphasis recent results but briefly progress and problems

working sessions consultation as requested

13C13E13F

58

36

25

Keep Working your plan!

26 12 11 16-Nov-04 Project status - emphasis rough draft paper and briefly describe rough draft of presentation

working sessions consultation as requested

13I13G

58

36

27

Keep Working your plan!

28 13 12 23-Nov-04 Present rough draft version of final presentation

discussion, comments, feedback

13K13L

58

36

29

21 of 26

Keep Working your plan!

30 14 13 30-Nov-04 Final Comments on papers returned

58

36

31 Produce Final TR Produce Final

Presentation PPT Rehearse

presentation for dry run

32 15 14 7-Dec-04 Dry Run Final Presentation

291513H

58

1416

36

33 Rehearse Presentation

Make 30 Hard Copies

Make softcopy for team use

34 16 1510-Dec-04 Presentation to Faculty 1 1

35 16A Rain/Snow/Ice Alternate Date

- TBD 36Line Week

nr. Class nr.

Date Student activity Class agenda Team Items Due

Individual Items Due

Notes

22 of 26

23 of 26

Skills that may be used to some extent: Time Management

o Prioritisation Project planning Presentations Writing Process

o Topic Selectiono Focuso Question – Hypothesis o Researcho Analyseo Assesso Proofo Conclusions o Organiseo Write Drafto Edito Format and Packageo Publisho Present

SE Processeso Problem Definitiono Define Stakeholdero Define criteria for success o Tailor processes for the specific projecto IPT/IPPD teams o Requirementso Peer reviewo Validate o Conops if appropriate o Architecture if appropriateo Alternativeso Analysiso Assessmento Selectiono Design if appropriateo Develop if appropriate o Verify o Recommendationo Documentation o Plan and Organiseo Monitor and Control

Earned value Capture metrics

o Coordinate

24 of 26

o Manage Risko Control Data and configurationso Ensure Quality

Reliability HF- MMI/CHI

o Tailor processeso Capture metricso Recommend Improvements o Coordinate with customero Manage supplierso Training o Problem resolutiono Prevent defectso Use and Manage toolso PAL – use and improve tools, techniques, data, templates, reports, and

other artifacts for reuseo Statistical and Six Sigma techniques

Teamwork Meetings

o Agendao Document decisions and action itemso Assign tasks and deadlineso

MS Office o Word – TR and status reports o Project – plans o Powerpoint – presentationo Excel – status reports - and if needed for data storage and

reports/analysis or graphs o Visio – or similar for diagramso Access – if needed for data storage and reports

SE or Scientific Software o Statistical Analysiso Graphic displays

Risk Mitigation Analysis tools and techniques

o 7 M&T toolso 5 Whyso Affinity Diagramo Brainstormingo Cause and Effect Diagramo Causal Loopo Check Listso Confidence Intervalso DOEo Control Charts

25 of 26

o Flow Chart DFD FFBD

o HIPO diagramso Process Mapso FMEAo Histogramso Pareto Diagramso Matriceso Statistics

Mean, mode, average SD

o Type I – Type II error optimisationo Hypothesis testingo Process modelo QFDo Trizo Visual controlso Allocationso Nominal Group Techniqueo Scatter diagramso Fishbone charto Force Field diagramo Priority settingo Constrained optimisationo Linear programmingo Game theoryo Dynamic programmingo VUCA tolerant

Time management Common Sense Salesmanship Creativity Resourcefulness Listening Negotiation Diplomacy Ethics