A brief look at the progress made on SWING
1. BURGOS, the city
2. BURGOS, hydraulic architecture
3. SWING, demo activities in 3 DMAs of the city
4. PARTNERS, organization and roles
5. SWING, dissemination in progress
6. SMART WATER METERS installation progress
7. SENSORS installation progress
8. NETWORK FOR TELEMETERING. Installation progress
9. SCADA progress
10. SOFTWARE INTEGRATION progress
11. BUSINESS INTELLIGENCE progress
Contents
ACCIONA Agua. Your partner in the water cycle
• Located in the northern half of Spain, in the heart of the Castille and Leon region.• Considered the historic capital of Castille for centuries.• It has many historic landmarks, some of them declared World Heritage Site by UNESCO• Municipality and city area of 107 km² (41 sq mi)• 180,000 inhabitants.
1. BURGOS, the city
© 2015 Acciona Agua S.A.U. Todos los derechos reservados.
3
ACCIONA Agua. Your partner in the water cycle
Arlanzón DWTP
Gamonal Water tanks
Villalonquéjar Water tanks
Cerro San Miguel Water tanks
2. BURGOS, hydraulic architecture
26 District Metered Areas (DMAs)
ACCIONA Agua. Your partner in the water cycle
3. SWING, demo activities in 3 DMAs of the city
© 2015 Acciona Agua S.A.U. Todos los derechos reservados.
5
A wide urban area with452 smart water metersA classic residential area with
912 smart water meters
An industrial area with 177 smart water meters
A. Villalonquéjar Este DMA
B. Barriada Yagüe DMA
C. Virgen del Manzano DMA
ACCIONA Agua. Your partner in the water cycle
Integration of technologies and heterogeneous data
Big data center development. Data visualisationCommunication network infrastructure
Water quality sensors manufacturers
4. PARTNERS, organization and roles
In charge of the water cycle of Burgos
© 2015 Acciona Agua S.A.U. Todos los derechos reservados.
6
ACCIONA Agua. Your partner in the water cycle
5. SWING, dissemination in progress
7
ACCIONA Agua. Your partner in the water cycle 8
5. SWING, dissemination in progress
ACCIONA Agua. Your partner in the water cycle 9
6. SWING, smart water meters installation progress• We have statistical tables to visualize changes, status and location for every meter.• We have an application that registers data from the whole installation• Pictures of every substitution/new installation are stored
substitution
ACCIONA Agua. Your partner in the water cycle 10
• 1500 smart meters are currently being installed in the demo site (approximately 1000 are already installed)
Villalonquéjar Este DMABarriada Yagüe DMA
Virgen del Manzano DMA
WATER METERS STATUS
70 %
6. SWING, smart water meters installation progress
ACCIONA Agua. Your partner in the water cycle
• Optiqua EventLab® equipment has already
been installed in the distribution network
11
7. SWING, sensors installation progress
42° 22’ 19” N3° 40’ 38” W
42° 20’ 45” N3° 39’ 20” W
42° 20’ 10” N3° 42’ 30” W
42° 21’ 51” N3° 45’ 23” W
42° 21’ 07” N3° 44’ 40” W
42° 21’ 00” N3° 41’ 21” W
• S::can Nano::station® equipment is
currently being installed and is
scheduled for start-up the upcoming
week
• Two of these locations have a
coverage problem, so we are
currently considering a change in
either the communication
provider or the communication
technology
ACCIONA Agua. Your partner in the water cycle
• 3 EventLab systems installed and running
• 2 EventLab systems installed and at test stage
• Some communication problems have to be solved
• 1 nano::station currently being set up
12
7. SWING, sensors installation progress
SENSOR STATUS
80 %
ACCIONA Agua. Your partner in the water cycle
8. SWING, network for telemetering. Installation progress
13
• Coverage and water meter types and locations have been analyzed
• The installation is being developed trying to minimize the required number of devices
ACCIONA Agua. Your partner in the water cycle 14
NETWORK STATUS
70 %
• Villalonquéjar Este DMA was completed by 13 May 2015
• Barriada Yagüe DMA will finish this week
• Virgen del Manzano DMA installation starts next week
8. SWING, network for telemetering. Installation progress
ACCIONA Agua. Your partner in the water cycle
9. SWING, SCADA progress
15
• Connection with real water meters is planned for next week.
• Currently, meters are running in test mode
• Sectoral meters are going to be integrated in the upcoming days.
• Currently, only their representation is missing.
• EventLab® equipment are already integrated and running.
ACCIONA Agua. Your partner in the water cycle
10. SWING, software integration progress
16
• Big Data Center mounting is finished.
• Intuitive visualization of network elements
• Readings from GIS, SICAB and BI data base
• Billings visualization and DMA status
ACCIONA Agua. Your partner in the water cycle
11. SWING, Business Intelligence progress
17
SOFTWARE STATUS
70 %
• Network typology visualization.
• User management
• DMAs & sensors configuration. Tag validation.