PEOPLE DEVELOPMENT
WTAP _ 2015 SVR FINAL REPORT OUT
![Page 2: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/2.jpg)
2
Introductio
n
s
Michael Lentz
Fun/Interesting Fact About You:
Current Assignment:• TCF Maintenance
1st Shift• Supervisor: Christopher Atkins
Education:• Lawrence Technological University
Electrical Engineering (May 2017)
ACTIVITY RESULTS
# CLOSED KAIZENS(SK, MK) 2
AMOUNT OF SAVINGS #1 Safety: JSRA reduction of 98#2 B/C ratio: 94.47
# OF SA POCKET CARDS 7
TOTAL RESULTS
I am a drone/quadcopter enthusiast
![Page 3: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/3.jpg)
3
The Kaizen
![Page 4: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/4.jpg)
4
The Tank Farm Storage Project
• Cleaned up the old abandoned pump room outside D-70.
• Applied paint to give it a fresh new look.
• Adding new shelving and cabinets to make the space usable as a storage
room for tank farm pumps, and a workshop to fix the pumps.
![Page 5: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/5.jpg)
5
The Mess of an Abandoned Pump Room
![Page 6: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/6.jpg)
6
The Tank Leaking Everywhere
![Page 7: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/7.jpg)
7
The Hard Part is Over…
![Page 8: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/8.jpg)
8
Final Look When Racking Arrives
![Page 9: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/9.jpg)
9
Other Projects
• MAHLE Leak Tester – QM Project
• Turnover NEW Lock Out Tag Out – To meet OSHA requirements
• Wrote a Kaizen for this Project
• F-22 Lubrication Mapping – Mapped for AM and PM specialists
• Seat Conveyor Roller Chain Analysis
• TCF Breakdown Map
![Page 10: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/10.jpg)
10
MAHLE Leak Tester – QM Project
• Since starting the project we have seen a major decrease in overall failures.
![Page 11: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/11.jpg)
11
Turnover LOTO To Meet OSHA Standards
![Page 12: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/12.jpg)
12
F-22 Lubrication Mapping
• Created a lubrication map for F-22 conveyor to better accommodate AM and PM maintenance.
![Page 13: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/13.jpg)
13
Seat Conveyor Roller Chain Analysis
• Created a PowerPoint to explain the benefits of O-ring roller chain over standard roller chain.
![Page 14: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/14.jpg)
14
TCF Breakdown Mapping
• Mapped breakdowns in TCF for a clearer analysis of issues throughout TCF.
![Page 15: SVR Presentation](https://reader036.vdocuments.mx/reader036/viewer/2022081420/58eda1f11a28ab1a658b46a5/html5/thumbnails/15.jpg)
15
Other Responsibilities
• Filled in for supervisors when they needed time off.
• Inventory the TCF Maintenance storage area.