Challenges for the Implementation of Renewable Energies: Experiences from China and Germany Dr. Sven-Uwe Müller Programme Director Sino-German Ren ewable Energy Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH Asian Development Bank (ADB) 7 th Asia Clean Energy Forum 2012 Manila, June 6 th 2012

Upload: asia-clean-energy-forum

Post on 05-Apr-2018

221 views

Category:

Documents


0 download

TRANSCRIPT

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 1/22

Challenges for the Implementation of Renewable Energies:

Experiences from China and Germany

Dr. Sven-Uwe Müller

Programme Director Sino-German Renewable Energy

Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH

Asian Development Bank (ADB)7th Asia Clean Energy Forum 2012

Manila, June 6th 2012

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 2/22

2Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

To successfully establish renewable energyinfrastructures you have to address four issues… 

System Integration

Administrative / Regulatory

Skills & Qualification

Technical

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 3/22

3Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Creating an efficient mechanism is the mainadministrative challenge

Administrative / Regulatory

Goal:

•Efficient mechanism topromote generation fromrenewable energy sources

It is about KWh generated andnot KW installed

Easy to implement and

monitor

Give the right incentives for asustainable development of thesector (no boom & bust cycle) 

System Integration

Administrative / Regulatory

Skills & Qualification

Technical

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 4/22

4Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Policy priorities are changing over time

Inception

• Clear renewableenergy strategyand targets

• Attractive support

• Set up regulatorysupport

time

    d   e   p    l   o   y   m   e   n   t Early takeoff

• Predictableincentives

• Focus on non-economic barriers,e.g. transactioncosts, permits,

• Manage total

support costs

Advanced takeoff

• Predictable andrapidly adaptableincentives

• Manage totalsupport costs

• Focus on systemintegration

Consolidation

• Focus ontransformation ofthe energy

system

• Create a marketto expose RE tocompetition

• Secure publicacceptance

Based on IEA Study: “Deploying Renewable Energy” 

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 5/22

5Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Source: Bundesnetzagentur, German Federal Network Agency

Decrease the Feed In Tariff / Output Incentive over time

Incentive Based Regulation

: Principle: Decoupling ofrevenue from costs

Incentive: Grid operators maygenerate higher profits if theyrelease efficiency reserves andreduce costs.

Efficiency gains are initiallydelayed, but passed on to thecustomer permanently.

For extensions and restructuringmeasures it is possible to file forinvestment budgets

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 6/22

6Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Main technical issues are availability and cost of energy

Technical

Goal:

•Have the appropriatetechnology, which has

the best levelizedcost

of energy in place

• Ensure Availability

System Integration

Administrative

Skills & Qualification

Technical

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 7/227Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

It is not about transfer of technology but about transfer of“know how to do”  

Operation & Maint. Wind Power Services Applied Research

Establish WindPower TechnicianTraining School atSuzhou

Improve Operation

of Windfarms Introduce advancedwind power supporttechnologies

Wind Power GridIntegration Plan

Wind ResourceAssessment

Power Quality of

Turbines & Windfarms Power Performance

Assessment

Noise Measurement

Wind Farm Micrositing& Resource calculations

Grid planning/simulationsoftware (e.g. DigsilentPowerfactory)

Wind-power predictionfor dispatch

Working areas of the Sino-German wind energy programme

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 8/228Sino-German Renewable Energy Programme

Data source: ISET, IWET 10/2010

Germany used a public database to increase the knowledgeabout failures in wind turbines

www.windmonitor.iwes.fraunhofer.de

Broad data baseimproves

conditions for windfarm operators

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 9/229Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Develop a system to maximize feed in and grid stability

System Integration

Goal:

•Ensure grid stability

•Maximising feed-in of partlyvolatile renewable energysources

•Ensuring quick grid access

System Integration

Administrative

Skills & Qualification

Technical

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 10/2210Sino-German Renewable Energy Programme

In Germany grid expansion remains a major challenge

Situation in Germany

Successful integration of renewable energyrequires new transmission lines

Federal Network Agency (BNetzA) manages

the process 480 applications for investment budgets

have been made, with a total volume ofEUR 15 billion

A big part has already been approved

24 priority projects have been identifiedand attributes priority in a special law(“EnLAG”) – but: delays expected

Most projects got green-light by BNetzA

Delays mostly due to planning law

DelayedOn schedule Source : Bundesnetzagentur , German Federal Network Agency

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 11/2211Sino-German Renewable Energy Programme

China is working intensively on how to better integrate windpower to the grid and addresses the challenges

Status by the end of June 2010

Regional TSO

火电 Thermal

MW

水电 HydroMW

风电 WindMW

火电占比 Thermal/

total%

水电占比 Hydro/ total

%

风电占比 Wind/ total

%

Northeast 58272 6614.7 6495 81.6 9.3 9.1

North China 167115 3851 6798 94.0 2.2 3.8

Northwest 43382 17377 2145 69.0 27.6 3.4

Fossil power dominates generation in three-North regions Almost no oil or gas based generation This leads to a insufficient power balancing capability

Power system balancing challenges increase

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 12/2212Sino-German Renewable Energy Programme

China is updating its development plan for a provincial,regional and national power system including wind power

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 13/2213Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Qualification matters, especially for renewable energies

Skills & Qualification

Goal:

•Have enough qualifiedpersonnel to support thegrowth of RE installationsSystem Integration

Administrative

Skills & Qualification

Technical

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 14/2214Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

The wind power boom in China is a challenge for skills andqualifications

Demand projection for O&M staff for China in 2020

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 15/2215Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Tools and curricula for qualifying employees for tasks in thewind sector are available

BZEE “Windskill” by European Wind Energy Skills Network 

EU project from 2006 to 2009 See: www.windskill.eu  

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 16/2216Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Target Groups & Fields of Activity

• Train-the-Trainer (TTT)•

Didactical skills• Technical skills

• Curriculum implementation

Trainers &Teachers

• Management of training• Competence-oriented

evaluation

• Voc. College  – CompanyCooperation

HR Managers& Voc. CollegeManagement

• Competence-orientedcertification

CertificationBodies

Training of multipliers 

Enhance management 

competence 

Increase certification trasparency 

Instrument Target Group Fields ofActivity

Platform for professional education of wind power operationand maintenance staff in China 

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 17/2217Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Summary

Large scale deployment of Renewable Energy installations isnothing less than thebeginning of the transformation of the energy system

To get large scale deployment in RE started...

» Financial incentives and investors confidence in stableframework conditions are key prerequisites

To develop large scale deployment in RE sustainably...

» Implementation is key»Sustainable implementation needs a whole „ecosystem“

including skills, technical know how and practical know

how to do

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 18/2218Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

Thank you for your attention!

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 19/2219Sino-German Renewable Energy Programme

You can only improve, when you know the failures:windmonitor bundled operational data of the wind farms

www.windmonitor.iwes.fraunhofer.de

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 20/2220Sino-German Renewable Energy Programme

Accommodating an increasing share of renewables needs aSmart Market Design

Smart Metering

Smart ConsumptionSmart Storage

Smart Generation

Smart Market

Design

Volatile feed-in results in pricefluctuations on the wholesalemarkets

Smart meters enableconsumers to respond theprice fluctuations, e.g.

recharge the batteries oftheir electric cars

run appliances at acheaper rate

Use of these methods must befinancially attractive

Source : Bundesnetzagentur , German Federal Network Agency

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 21/2221Sino-German Renewable Energy Programme Dr. Sven-Uwe Müller

There are tools to reduce transactions costs for the developers

RETScreen

Established and proven cleanenergy decision-making software

35 languages covering morethan 2/3rds of the world’s

population

More than 33,9073 users in 222countries 

Provided free-of-charge by theGovernment of Canada

7/31/2019 Sven Mueller - Challenges for the Implementation of Renewable Energies Experiences From China and Germany

http://slidepdf.com/reader/full/sven-mueller-challenges-for-the-implementation-of-renewable-energies-experiences 22/22

22

China adresses the issue of improvement of the grid structure

0

500

1000

1500

2000

2500

3000

1月份 2月份 3月份 4月份 5月份 6月份 7月份 8月份 9月份

    (    万     千    瓦     时    )

调峰电量

Curtailment due to peak load regulation and grid structurein Jilin Province from Jan. to Sep.,2010

Curtailment due topower balancing

Curtailment dueto grid structure

Jan Feb Mar Apr May Jun Jul Aug Sep

1  0 . 0  0  0 k wh