sutin sarah portfolio
TRANSCRIPT
Sarah SutinPortfolio of Creative Works
Breaking the Boundsof Gasworks
Habitation
plans 1/32" = 1'
Sections 1/32" = 1'
B
B
A
A
Visitors: can continue their walk or play through structure.
Native Fish: seek shallow, protected areas for their habitat.
Gasworks Environmental OutlookARCH 211, Proksch/Celinska, Spring 2011
Views Circulation
Perspective montages
Design for public structure that connects the lake and park enviroments both physicaly and visually, while raising wildlife awareness.
ECO-OCUPANCYWater Life of Gasworks and Lake Union
Sockeye Salmon
Chinook Salmon
Large Mouth Bass
Pumpkin Seed
Stickleback
Yellow Perch
Sailboat
Yacht
Duck Boat
Kayaks
Seaplane
Chinook Salmon
June
March
Sept
Human Occupancy
Salmon Occupancy
1903 Olmsted Brothers suggest land be used for a city park rather than industrial site
1906 City Gas Light plant opens.
1911–1917 construction of Lake Washington Ship Canal including Montlake Cut and Fremont Cut
1936 concrete “prow” built on site for unloading coal.
1956 Plant closed when Seattle converted to natural gas fuel.
1962 City of Seattle began purchasing the abandoned gas works.
1970 Richard Haag Associates designed a restoration plan for a park space on the plant site.
1975 Gasworks park opened to the public.
Gasworks and Lake Union Site ExplorationWith Wei Cheng, ARCH 211, Proksch/Celinska, Spring 2011Enviromental analysis of relationships
between aquatic traffic, historical occupancy of Gasworks and weather of Lake Union.
Rain in inches throughout the year.
Exploded Axonometric
Schmitz Hall Passage AnalysisARCH 210, Proksch/Celinska, Winter 2011
Plan
Section
Sections
A
A
B
B
C
C
Recording of compression versus volume and the elements that enhance the varying verticality. Hand drawn in pencil with Photoshop.
model
Site Plan of Ravenna Park
Ravenna Park: Analysis and DesignLARCH 300, Arab, Autumn 2010
Site Section
Vinettes
Selected Site Plan
Study of texture, light and emotional experience through Ravenna Park, ending in design for structure that reflects the duality of the ravine.
Sketchup rendering
Plan 1/16” = 1‘
Lighting for majority of play
Magnificent Waste Set DesignDRAMA 210, Morgan, Spring 2011Design created for modern episodic
play about art and addiction, awarded best in class by the playwright.
Lighting for morning bedroom Scene
lighting for evening terrance scene
lighting for oxygen bar scene
SarahSutin.comWith Ansel Santosa, Autumn 2010
Home page
Inspiration Page
Contact page
Photoview feature
Design of personal website, developed by Ansel Santosa.
SwatchesandSwitches.comWith Ansel Santosa, Winter 2011
Blog Entry View
Home Page
Contact Page
Design of co-written blog, developed by Ansel Santosa.
Formating Close up
Photography2009-2011Photographs taken in
Washington State, Minnesota and Ireland, using a Canon S95 and a Canon 7D.
Perspective series of vertical passage in Freeway Park. Hand drawn in ink.
Perspective DrawingARCH 211, Proksch/Celinska, Spring 2011
Ascending descending
IllustrationWinter 2010Illustrations for authored short story about
a woman’s wander in winter. Hand drawn in charcoal and pen, colorized in Photoshop.