sustainable procurement for residential client francoise murat
DESCRIPTION
TRANSCRIPT
SUSTAINABLE PROCUREMENT FOR RESIDENTIAL CLIENTWhen sourcing sustainably is a necessity and not a “nice to have”
NECESSITY V CHOICE Interested in green issues/products only because of children’s
health Not interested in where it comes from : sourcing sustainably –
but WE felt it was important As local as possible Does what it says on the tin
We were told Autistic child could die if she is not protected from dust, solvents, etc...
If we can do this within 2 months we have job-we declined not realistic, job took 7 months!
Our purchasing decisions were made on: Speed of delivery/procurement Price Green credentials Localised sourcing Fulfils brief Aesthetics preserved, function, form
BACKGROUND INFORMATION ON CLIENT
Family of 3 children: 1 with Asperger’s Syndrome – repetitive
patterns, no social skills 1 Autistic child with respiratory problems,
Asthma, extra-sensory touch, hearing and smell, heavy metal poisoning (existent)
Dust major consideration Noise and existing toxicity in the house Autistic child is home schooled and has special
therapy programme with gymnastics etc... Family cannot move out and has already started
to unpack Can go away for 5 weeks for major works
+additional 1 week
BRIEF FOR LATE 19TH CENTURY HOUSE REFURBISHMENT
Extension for therapy area – ground floor
New kitchen + new flooring + small extension
Servants stairs discard New bathrooms Re-plaster as required New flooring 1st floor (hall
+bedrooms) Refurbish staircase (pine) Paint and decorate Retain as many period
features as possible No sacrifice to form,
function, aesthetics because of green requirements
CLIENT’S IMPERATIVES
No MDF VOC free paint Organic paint Dust free No solvents VOC free varnishes and wood stains No mobile phones, no radios, no excessivenoise No smoking on site Delivery of finished project
by Early December
PROCESS OF SOURCING MATERIALS - PAINT
Paint: we took 5 weeks to test ‘Green', ‘eco’, ‘natural’, ‘organic’ paints Researched for veracity of ingredients or claims
to green credentials Tested: application, coverage, opacity, texture Cost versus coverage Delivery charges, time Client did not allow for extra cost on any
additional time/materials sourcing/procuring Builder also did not make for added costs, although we
asked for him to provide 4x costs on materials and ensure he was paid for paint on extra = he did not
PAINT SOURCING We ordered over 300
litres of paint: colour match cost £30.00 (to Dulux colour) per colour, shipping next day for paint or same day once set up, set up was labour intensive
These companies are set up for small orders: private clients, one room, more a wish to go green and then a must or real willingness
WOOD PRODUCTS Eco floor varnish:
procurement and application (Auro) Testing on sample floor in
studio = no problem Application on flooring – 5
weeks
Staircase: sanded whilst family away 1 week, eco wood stain applied, 3 days to dry, matt finish (Auro) Preparation is everything Need contractor who will go
the extra mile Different woods = different
end results
FLOORING Lyno Bamboo Tiles Wood Cork Samples ordered,
colours, form and function, reliability of delivery, maintenance, application for the trades
Cork was only one contractors had never installed – bought engineered boards
KITCHEN MDF kitchens –
researched bamboo, solid wood, reconstituted, etc... Reality of time and
costs and reliability Fitted John Lewis
kitchen look alike when family away for 5 weeks
Wants over-ride requirements, usual but shocking for us
Cork flooring We found mould under
old floor, black mould Toxicity Pressure to clear asap
CONCLUSION
Extremely difficult project for dust, VOC free house, old house, clients living there – found lots of problems Gas boiler not switched off – old boiler removal Water contaminated – we put a whole house
water purifier, water decontaminant (heavy metal)
Eco/green suppliers : fantastic customer service, detailed knowledge of their products, performance, available at any time, good data sheets on most foreign products (Auro)
Delivery of materials via Fedex, courier = v expensive
Green – health and safety – spontaneous combustion of eco wood stain/varnish
MORE CONCLUSION
The Green Shop (Stroud) was speedy in sending samples, data sheets, and had stock (wood stain, varnish, paint Auro)
Individual paint companies who manufactured their own had good turn around1-2 days upon receipt of order for delivery
Cork company, distributors NOT manufacturers = be careful as they had to go to Portugal manufacturer who imports through one distributor who then distributes further= at least 5 days (no stock)
Individual small companies not geared up towards large bulk orders
Also trade price max we found 10% off retail
AND FINALLY....
Did not always succeed Many untested/unknown variables/science is not
exact Clients specifics did not always match real life What clients and says and finally does = pushing
the envelope? Be prepared to change schedule on daily
basis Think on your feet as most trades have no
experience of eco products/materials Solution finding exercise Don’t give up! Great experience in eco materials/ application/
allergy/ health problems –find solution