sustainable government symposium december 11, 2007
TRANSCRIPT
Sustainable Government Sustainable Government SymposiumSymposium
December 11, 2007December 11, 2007
Green Building Guidelines Green Building Guidelines for State Constructionfor State Construction
All new state-funded building All new state-funded building construction and major renovations of construction and major renovations of existing state-owned facilities are existing state-owned facilities are required to meet the current LEED NC required to meet the current LEED NC standard will achieve the highest level standard will achieve the highest level of certification practicable within the of certification practicable within the project budget.project budget.
A major renovation is defined as 40% or A major renovation is defined as 40% or greater of the building’s current greater of the building’s current replacement cost.replacement cost.
Green Building Guidelines Green Building Guidelines for State Constructionfor State Construction
New buildings and major renovations < 10,000 New buildings and major renovations < 10,000 square feet will meet the highest LEED square feet will meet the highest LEED standard practicable including those credits standard practicable including those credits CDB requires as mandatory. Certification is not CDB requires as mandatory. Certification is not required.required.
New buildings and major renovations ≥ 10,000 New buildings and major renovations ≥ 10,000 square feet will achieve LEED “Silver” square feet will achieve LEED “Silver” Certification at a minimum including those Certification at a minimum including those credits CDB requires as mandatory. USGBC credits CDB requires as mandatory. USGBC Certification is required.Certification is required.
Green Building Guidelines Green Building Guidelines for State Constructionfor State Construction
Exemptions to these guidelines are buildings Exemptions to these guidelines are buildings that are not “comfort” conditioned as that are not “comfort” conditioned as determined by CDB. However, the project determined by CDB. However, the project design team will document and incorporate all design team will document and incorporate all appropriate sustainable building methods, appropriate sustainable building methods, strategies and technologies in the final strategies and technologies in the final design. design.
State agencies and the project design team State agencies and the project design team may apply to CDB for a waiver from the may apply to CDB for a waiver from the guidelines.guidelines.
Green Building Guidelines Green Building Guidelines for State Constructionfor State Construction
Waivers will be granted by CDB or the Waivers will be granted by CDB or the appropriate agency when the applicant can appropriate agency when the applicant can demonstrate and document:demonstrate and document: An unreasonable financial burden taking into An unreasonable financial burden taking into
account the operating and construction costs over account the operating and construction costs over the life of the building and total cost of ownership the life of the building and total cost of ownership of the buildingof the building
An unreasonable impediment to constructionAn unreasonable impediment to construction The guidelines would impair the principal function The guidelines would impair the principal function
of the buildingof the building The guidelines would compromise the historic The guidelines would compromise the historic
nature of the structurenature of the structure
Green Building Guidelines Green Building Guidelines for State Constructionfor State Construction
Documentation on the submittal must include at Documentation on the submittal must include at a minimum:a minimum: Life cycle cost analysisLife cycle cost analysis Energy modelingEnergy modeling Other – Create form or checklistOther – Create form or checklist
The design team must provide the documentation The design team must provide the documentation for the new project to confirm that LEED for the new project to confirm that LEED standards in the design have been followed.standards in the design have been followed.
The green building guidelines contained The green building guidelines contained here will be analyzed and evaluated by CDB here will be analyzed and evaluated by CDB after 5 years or the completion of ten (10) after 5 years or the completion of ten (10) CDB green projects which ever comes first.CDB green projects which ever comes first.
Performance Performance MeasurementsMeasurements
Building and Site CharacteristicsBuilding and Site Characteristics Building InformationBuilding Information Occupancy InformationOccupancy Information First CostsFirst Costs
Building Cost and Performance MetricsBuilding Cost and Performance Metrics Water UseWater Use Energy UseEnergy Use Maintenance CostsMaintenance Costs Occupancy DataOccupancy Data
CDB Green Pilot ProjectsCDB Green Pilot Projects
Stratton Replacement – Springfield
University of Illinois – Urbana Integrated Bio-Processing
Laboratory Southern Illinois University
Carbondale Transportation Education Center
Other CDB Green ProjectsOther CDB Green Projects
Western Illinois University Performing Arts Center – Macomb Quad Cities River Front Campus
University of Illinois – Champaign Renovation of Lincoln Hall – LEED
Gold Truman College - Chicago
Student Services Center
WORKFORCE DEVELOPMENT WORKFORCE DEVELOPMENT CENTERCENTERHEARTLAND COMMUNITY COLLEGE -HEARTLAND COMMUNITY COLLEGE - NORMALNORMAL
$19.1 million, 101,000 square feet construction project$19.1 million, 101,000 square feet construction project
Designed to LEED Basic certificationDesigned to LEED Basic certification
Dedicated in August 2007Dedicated in August 2007
WORKFORCE DEVELOPMENT WORKFORCE DEVELOPMENT CENTERCENTER HEARTLAND COMMUNITY HEARTLAND COMMUNITY
COLLEGE - NORMALCOLLEGE - NORMAL
Sustainability PlansSustainability Plans
FY 08 Capital Projects Existing Buildings – Get Credit for
what you are already doing Roofs Lights and Ballasts HVAC systems
Sustainability PlansSustainability Plans
Future Capital Projects Facility Condition Assessment
Web-based data base Basis for a multi-year capital plan Backlog of deficiencies and deferred
maintenance Energy Component – Payback of 7 years
or less Identify unoccupied space