Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery – RMD Carillion Alawi LLC

Upload: duongdung

Post on 08-Mar-2018

231 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Sustainable

Construction -

Oman Botanic

Garden Phase 2

Simon Buttery – RMD

Carillion Alawi LLC

Page 2: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Carillion Alawi LLC• As a business we have been present within the Sultanate of Oman for over 45 years and are a wholly owned subsidiary of our UK parent Carillion PLC a £5BN turnover international construction services business

• Today we specialise in:– Civil Engineering

– Building

– High quality joinery (we have Oman’s 1st FSC accredited joinery workshop)

– MEP

Page 3: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Carillion Alawi Values

Page 4: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Sustainability – Our Approach‘meeting the needs of the present generation without

compromising the ability for future generations to meet

their needs’

Page 5: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Project Details

• Client: Muscat Municipality

• Project Value: circa O.R. 19,500,00

• Start Date: 07/04/09

• Completion Date: 31/12/10

• Project Manager: Bovis Lend Lease

• Main Contractor: Carillion Alawi LLC

• 1st LEED Accredited project within the Sultanate of Oman

Page 6: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Mission

“The Oman Botanic Garden, as a new world class

botanic garden, conserves the unique botanical

and ethnobotanical heritage of Oman and ensures

that the flora, heritage and ecosystems of Oman

are valued by all”

Page 7: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Sustainability: Our Key Themes for the Project

• Collaborative working

• Awareness

• Recycling

• Water usage

• Community engagement

• Monitoring

• Adoption of best practices

Page 8: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Collaborative Working

• Partnership

established with

Project Manager

• Learning from wider

Carillion Businesses

Implemented

• Sustainable

Innovations Group

Page 9: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Awareness

• Regular awareness

training and feedback

sessions

• Environmental “Don’t

Walk By’s”

• LEED Training

Page 10: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Recycling• We currently recycle

– Timber

– Paper

– Cardboard

– Plastic PET

– Aluminium

– Steel

– Concrete

– Glass

– Areca leaf plates

Page 11: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Water Usage

• Use of new curing

membranes to reduce

water

• Flow restrictors to

taps

• None potable water

used for dust control

Page 12: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Community Engagement• Construction of new access stair to local school

• Sponsorship of local football team

• Facilitation of school visits to site

• Provision of furniture to local special needs school

Page 13: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Monitoring

• Background environmental monitoring program to establish ambient values for the following:– Noise

– Dust

– Air Quality

• An ongoing monitoring program has been developed to ensure levels during construction meet prescribed limits and do not impact the environment or local community.

Page 14: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Adoption of Best Practice

• On site crushing of

concrete waste mixed

with soil to use as

backfill behind

retaining walls

• Use of filter fences to

protect wadis from

run off and

sedimentation

Page 15: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Adoption of Best Practice

• Use of Areca plates

for serving operatives

food reduces food,

water consumption

and waste

• Protection and

preservation of

existing trees and

vegetation

Page 16: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

Adoption of Best Practice

• Vegetation removed

chipped and turned

into compost

• Coir rope used for

walk ways instead of

nylon rope with plastic

tape

Page 17: Sustainable Construction - Oman Botanic Garden … Buttery...Sustainable Construction - Oman Botanic Garden Phase 2 Simon Buttery –RMD Carillion Alawi LLC Carillion Alawi LLC •

It Does Make A Difference!

• 18mm ply wood usage on target against

tight tender allowance

• Back fill material usage against tender

allowance circa 40% cost saving