  • 7/21/2019 SUSHOVIT Project Time Management

    1/4

    PART 3: PRELIMINARY TIME MANAGEMENT

    Preliminary time management is a process of planning, controlling and executing the project so that the

    project is managed in a proper effective way to get the desired outcome. We do have different methods

    of implementing a certain project and for this particular project we are following the following tools and

    techniques to execute the time management strategy.

    ACTIVITY LIST AND ATTRIBUTES:

    Activity List and attributes generally deals with the tasks that should be followed by each activities

    resource requirements, constraints and the relationship between each activity. The sample of Activity

    List and Attributes assisted from the WBS for the initiation and site Mobilization of the project has been

    shown below.

    Project Name: Borroloola Trade Training Centre

    WBS Item Number: 1.1

    WBS Item Name: Initiating

    Predecessors: none

    Successors: 1.2 Site constructions

    Logical Relationship: Finish to Start

    Leads and Lags: none

    Resource Requirements: Contractor, stakeholders and project manager

    Constraints: none

    Assumptions: Mutual agreement and negotiation between stakeholder and contractor should be made in presence of an authorized body to

    start the project.

    WBS Item Number: 1.2

    WBS Item Name: Site Construction

    Predecessors: 1.1 Initiating

    Successors: 1.2.1 Site Mobilization

    Logical Relationships: Finish to Start

    Leads and Lags: none

    Resource Requirements: Project Manager, Civil Engineer, Mechanical Engineer, Architecture

    Constraints: none

    Assumptions: Construction should be on time within the stipulated Budget with a regular inspection.

    MILESTONE LIST

    The series of works as milestones has been given below projecting the completion dates:

  • 7/21/2019 SUSHOVIT Project Time Management

    2/4

    Milestones Deliverables Completion date

    Negotiation Stakeholder, Contractor, Project Manager 01-01-2016

    Sign Agreement Stakeholder, Contractor, Project Manager 01-01-2016

    Site Mobilization Project Manager and Administration Team 25-02-2016

    Detail Design Design Team 05-05-2016

    Site Clearance Construction Team/Quality Control Team 05-06-2016

    Excavation Construction Team/Quality Control Team 05-07-2016

    Installation works Construction Team/Quality Control Team 10-09-2016

    Concrete works Construction Team/Quality Control Team 29-09-2016

    Curing works Construction Team/Quality Control Team 10-10-2016

    Backfill and Sanding

    works

    Construction Team/Quality Control Team 25-11-2016

    Final Taking Over Quality Control Team/Stake holder 30-12-2016

    Project Completed Project Manager, Contract Management Team, Stake

    holder

    01-01-2017

    NETWORK DIAGRAM:

    The following diagram shows the sequence of events and process to be followed for project scheduling.

    It generally is the schematic display of logical relationships or sequencing of the project activities.

  • 7/21/2019 SUSHOVIT Project Time Management

    3/4

    Repairing and taking over

    Site Mobilization

    Site Clearance

    Project completed

    Detail design Concrete Works

    Reinforcing steel, M and E

    Installation and formwork

    Excavation Work Curing Works

    ACTIVITY RESOURCE REQUIREMENT

    The following table shows the list resources and times required to complete each activity listed.

    Activity Skills

    needed

    Deliverables Working

    days

    Start date End date

    Construction

    Drawing and

    site clearing

    Civil

    Engineer,

    Architecture

    DST 61 25/02/2016 25/04/2016

    Demolish

    and site

    Clearing

    Civil

    Engineer

    CST,QCT,CTT 22 26/04/2016 17/05/2016

    Excavation Civil

    Engineer,

    Mechanical

    Engineer

    ,Heavy

    Equipment

    Driver

    CST,QCT,CTT 20 18/05/2016 06/06/2016

    InstallationM and E

    prior

    concrete

    Works

    CivilEngineer,

    Mechanical

    Engineer,

    Heavy

    Equipment

    driver

    CST,QCT,CTT 43 07/06/2016 19/07/2016

    Concrete Civil CST,QCT,CTT 52 20/07/2016 09/09/2016

    1

    2

    3

    5

    6

    8

    47

    9

  • 7/21/2019 SUSHOVIT Project Time Management

    4/4

    Works Engineer,

    Mechanical

    Engineer,

    Heavy

    equipment

    driver

    Curing

    Works

    Civil

    Engineer

    QCT,CTT 41 09/10/2016 18/11/2016

    Back Filling

    And Sanding

    Civil

    Engineer,

    Heavy

    Equipment

    Driver

    CST,QCT 33 19/11/2016 21/12/2016

    Repairing

    Works and

    taking over

    Civil

    Engineer,

    Quality

    Controller

    CST,QCT 11 22/12/2016 1/1/2017

    ACTIVITY DURATION

    The Duration for each activity to be sequenced in a project has been briefly shown in the

    Activity Resource Requirement list but the exact duration for different activity can be found by

    the PERT weighted average formula given as follows:

    PERT weighted average= (optimistic time+4*Most likely Time+ Pessimistic)/6

    PROJECT SCHEDULE

    For the Project schedule of each activity in the project, a Gantt chart has been made which has

    been shown in the next part.