  • 8/12/2019 Survey Report Rig C (3)

    1/30

    Inspection Report

    Rig C

    Date of Inspection: Friday 19th July 2013

  • 8/12/2019 Survey Report Rig C (3)

    2/30

    Inspected & Prepared by:

    Mr Ho Heen Wu

    Qualifications: Marine Chief Engineer, 1st Class M.O.T. Competency

    Past Experiences: Chief Engineer Technical Superintendent Senior Technical Superintendent Head of Technical Department/Senior Technical Manager (19 bulk

    carriers) Head of Technical Department/Senior Technical Manager (23 container

    vessels)

    Mr Lim Chin Hong

    Qualifications: Marine Chief Engineer, 1st Class M.O.T. Competency Diploma of Management

    Past Experiences: Chief Engineer, Foreign Going Vessels Guarantee Engineer Engineering Manager Managing Director

    Awards & Affiliations: Council Member: Royal Institute of Naval Architects & Institute of Marine Engineering,

    Science & Technology (South East Asian branch).

    Assitants:Mr Wilson Lim - BSc BiotechnologyMr Hanafi - Welding superintendent/welder 6G

  • 8/12/2019 Survey Report Rig C (3)

    3/30

    General Info

    Vessel Type: Midwater Floater / Semi-submersible drill rig

    Year Built: 1976, upgraded 1996,

    Flag: Panama

    Lightship Weight: 10,000 tonnes

    Length: 355ft / 108mBreadth: 220ft / 67m

    Depth: 120ft / 37m

    Draft: 70ft / 21m

    Transit Draft: ~ 20ft / 7m

    Height of Derrick From Platform: 185ft / 56m

    -----------------------------------------------------------------------------------------------------------------------------

    Condition Report

    General Condition

    - Sub-average condition,- Rust has penetrated most of the top deck surface- Some outdoor equipment are wrapped neatly in thick canvas, reduces weathering- Others are left exposed to harsh sea conditions.- 2 elevator units inside each main leg

    - GA not available- Sounding test approx 500 litres of diesel in day tanks- 40 tonnes of engine oil remaining in tanks

  • 8/12/2019 Survey Report Rig C (3)

    4/30

    Derrick- Overall structure shape is good- Superficial rust spots present

  • 8/12/2019 Survey Report Rig C (3)

    5/30

    Drawworks- Intact in good condition, covered in canvas- Did not run operational test

    Rotary Table / Bushings- Rotary table covered underneath wooden panels- Bushings kept in workshop

  • 8/12/2019 Survey Report Rig C (3)

    6/30

    Top Drive & Traveling Blocks- Top drive not on rig- Traveling block are intact, hanging uncovered on derrick rails

    BOP System- Not found on rig

    Compensators - Present, in good condition

  • 8/12/2019 Survey Report Rig C (3)

    7/30

    Anchor Winches- 4 units total- Covered partially under canvas- Poor but working condition- Each winch operates two warping heads- Warping heads in poor condition

  • 8/12/2019 Survey Report Rig C (3)

    8/30

    Anchors- All 8 anchors are being used

    Anchor Chasers- Chasers N/A

  • 8/12/2019 Survey Report Rig C (3)

    9/30

    Main Deck Cranes- One unit- Old design, 1960's built- Good physical condition, should work fine.- Reportedly been used recently- Control room in good order.- 56tonnes @ 40ft

  • 8/12/2019 Survey Report Rig C (3)

    10/30

    Secondary Cranes- One unit intact, good condition.- 52 tonnes @ 30ft

    Lightweight Deck Davits- 2tonne max

  • 8/12/2019 Survey Report Rig C (3)

    11/30

    Lifeboats & Davit system- 3 main boats in good order- Davit seems worn & rusted

    Helideck & Refueling system- Deck in good condition- Water puddle indicates less than flat surface- Refueling system intact

  • 8/12/2019 Survey Report Rig C (3)

    12/30

    Mud Pumps- 3 units- Good condition

  • 8/12/2019 Survey Report Rig C (3)

    13/30

    Main Engine- 4 units @ 1.5 megawatts per unit- Good condition- Good, more modern design- Some spare cylinders

  • 8/12/2019 Survey Report Rig C (3)

    14/30

    Backup Emergency Generator

    - 1 Unit, cummins- Excellent condition- Newer design

    Thrusters & DP system- 4 Thrusters- For propulsion only, no DP system- Unable to view as elevator to pontoon offline

    Fuel Pumps

  • 8/12/2019 Survey Report Rig C (3)

    15/30

    Shale Shakers- All 4 units not on rig

    Lathe Machine & Milling Stand

    - 1 unit each- Great condition

  • 8/12/2019 Survey Report Rig C (3)

    16/30

    Air-Conditioning Compressors

    Drill string compensator's Air Compressors- 4 units, in good condition

  • 8/12/2019 Survey Report Rig C (3)

    17/30

    Cement Tanks- 4 units

    -----------------------------------------------------------------------------------------------------------------------------

    Equipment & Spares

    Parts Warehouse- Locked, no access

    Workshop- Painting equipment, several units- Welding genset, 2 units- Heavy tools- High pressure water jet- Welding rods

  • 8/12/2019 Survey Report Rig C (3)

    18/30

  • 8/12/2019 Survey Report Rig C (3)

    19/30

    Spare Winches

    Spare Electric Motors

  • 8/12/2019 Survey Report Rig C (3)

    20/30

    Chain blocks

    Forklift- 1 unit- 3 tonne lift- Poor condition

  • 8/12/2019 Survey Report Rig C (3)

    21/30

    Spare Cables, hoses & wire ropes- Good condition- Kept sheltered- Several spools each

  • 8/12/2019 Survey Report Rig C (3)

    22/30

  • 8/12/2019 Survey Report Rig C (3)

    23/30

  • 8/12/2019 Survey Report Rig C (3)

    24/30

    Iron Roughneck- One unit- Good condition

  • 8/12/2019 Survey Report Rig C (3)

    25/30

    Fire Extinguishers - Intact, expired

    Accomodation Units- Hundreds of mattresses & pillows- Desks & swivel chairs- Computers & flatscreen monitors in good shape- Desktop printers & print stations- Heavy duty washing machine & dryers- Pantry with stoves, ovens, refrigerator units & utensils

  • 8/12/2019 Survey Report Rig C (3)

    26/30

  • 8/12/2019 Survey Report Rig C (3)

    27/30

  • 8/12/2019 Survey Report Rig C (3)

    28/30

    Recreational Units- No TV- Library of books- Gym room in bad shape.

  • 8/12/2019 Survey Report Rig C (3)

    29/30

    MISC Items & Pictures

  • 8/12/2019 Survey Report Rig C (3)

    30/30