surveillance plan on malaria control/elimination in myanmar

Download Surveillance Plan on Malaria Control/Elimination in Myanmar

If you can't read please download the document

Upload: elizabeth-mclaughlin

Post on 08-Jan-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

Surveillance Plan on Malaria Control/Elimination in Myanmar Proposed area Bago Region Kayin Mon Tanintharyi The Regions selected Rationale/ Challenges -High transmission areas (Kayin & Taninthayi) -Moderate transmission areas (Mon & Bago) -Artemisinin resistant confirmed in all areas -All are Border with Thailand -Non-stake actors areas -Tier 1 area --Because of RAI project area, many partners are there. All 4 State/ Regions are in control phase Data available: Private sector is requested to report cases and starting from 2014 partners reports are included in VBDC data All confirmed malaria cases (Pf, Pv, Mixed ) Number of inpatients with SCM, deaths d/t malaria -included from public hospitals (private hospitals s/be negotiated in Eli;) Data collection monthly, but compilation assessment is yearly. Conventional malariometric indicators (API, SPR, ABER are calculated), Trying to improve ABER to reach 10% of the pop; PCD at all levels of health facilities and community based and (including work site volunteers) ACD in high-risk groups, especially migrants by mobile clinics, & intensified case findings in hot spot area. Feasibility assessment Health Information -Gap analysis on data reporting, recording, supervision & monitoring ( at different levels), assessing existing situation and verification - Human resources assessment and strengtheened Improving surveillance system -Definitions and formats to be prepared and trained -New tools such as web-based data transmission, volunteer reporting via SMS - M&E system review and strengthened Reorientation Intensified case finding in high malaria transmission villages and VC measures Priority Activities at the State/Region level Province/county/state/regi on BagoVillages6370 Population (,000) PAR (,000) priorities for period reported API (local)/1000 PAR Preparation & Reorientation 2018/ 2019Total cases estimated Surveillance system & HR strengthening# Total cases reported Village wise risk assessment and Acceleration of case detection & T in high risk area/pocket by expansion of VMWs, advocacy to other sectors and organizations % of cases reported (Estimation)95%89%96%97%98%99%100% # surveillance staff (Gov) # surveillance staff (Volunteers) Phase (Con/Elim/Prev) CCCAd. C E MonVillages 1195 Population (,000) priorities for period PAR (,000) Preparation period 2016 including verification of data reported API (local)/1000 PAR #local cases reported Reorientation in 2016% of cases reported95%97%98%100% # surveillance staff (Gov) Strengthening surveillance system #surveillance staff (Volunteers) and HR Phase (Con/Elim/Prev)CCCCEE KayinVillages priorities for period Population (,000) Coordination and advocacy at State level including Non-state Actors, all IPs, relevant organizatins. PAR (,000) reported API (local)/1000 PAR Village wise assessment and acceleration case finding & treatment in high malarious area. #Total cases reported Total cases estimated HR & surveillance system strengthening % of cases reported70% 85%90%95%98%100% # surveillance staff (Gov)317 # surveillance staff (Volunteers) Phase (Con/Elim/Prev)CCCCCC E ThanintharyiVillages1143 Population (,000) priorities for period PAR (,000) reported API (local)/1000 PAR Acceleration case finding & treatment in high malarious area. #Total cases reported Feasibility study, if feasible staff orientation # Total cases estimated Strengthening HR & Surveillance system% of cases reported75%85%90%95%97%99%100% # surveillance staff (Gov) # surveillance staff (volunteers) Phase (Con/Elim/Prev)CCCCCCE Sr. No. Village of Dalett RHC, Ann Township October/December 2014May-15 TestedPositive MPRTestedPositiveMPR 1 Ah Lai Kyun Ah Yoe Taung (Zayat Kwin) Ah Yoe Taung (Ann Pya) Chan Kone Eaing Wine Hlaing Wa Kan Latt Kaw Hlaw Kwan Wa Kyain Chaung Kyauk Gyi Lay Eain Su Mal Toung Chay Maung Na Ma TestedPosMPRTestedPosMPR 15 Ngote Nhan Chaung Nyaung Chaung Pha Yone Chaung Phaung Taw Pharr Pyo Pine Phyar Sa Tone Tha Yet Pin Chaung Thinga Net Eaing Yar Pyin Wa Za Yat Kwin Zan Thie Villages (Sub-total) 28 Ann Pya Bway Wa Kha Maung Taw Kwa Son Lone Ton Nan Yar Kone Nay Pa Say Paung Wa Win Wa Villages (Sub-total) Tha Phan Pin Seik Total CAP-M VMW and PP location(Updated on with Year3 Village categorization) Thno Zon Oo (PTN 2) t9 "L ""\.. 9J AyeThongyan (62) r (TZK Mal1one) 'SS(A) Kampong Tengah Kawthoung CAPM VMW location SiSi(A)SiSi(A) Q Khit"l Thida Aye (35 school) Htay Htay Win (J2)Htay Htay Win (J2)