sureflow presented by: ron porter leed ap iec oklahoma city copyright 2012

115
SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Upload: frankie-styler

Post on 14-Dec-2015

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

SureFlow

Presented by:

Ron Porter LEED AP

IEC Oklahoma City

Copyright 2012

Page 2: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Topics

• Fan Coil Basics• Traditional System Design• SureFlow Hydronics• SureFlow Unit Design• SureFlow Applications

Page 3: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

This Is A Fan Coil

Fan + Coil = Fan CoilRoom Air Conditioner

Page 4: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Moves air through a coil with:

Chilled WaterHot WaterElectric HeatR410a

Let’s focus on the water systems…

How Do They Work ?

Page 5: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Central Pump Pushes Water Through Piping to Supply Each Fan Coil

Standard Water Pressure Differential System

Page 6: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

How Do We Size The Main Pump ?

Page 7: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Central Pump Horsepower = __Head x GPM__

3960 x Efficiency

Page 8: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Calculate All Circuits

Pump Sizing Based On Highest Pressure Drop Circuit

Page 9: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Water Always Takes The Path Of Least Resistance

How Do We Know The Fan Coils Will Operate As Advertised ?

Page 10: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Water Pipe Has Resistance To Water Flow

Pipe and Riser Diameters ?

Page 11: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Continuity : Water In = Water Out (GPM Per Minute)

Velocity : Speed of Travel (Feet Per Second)

D1 D2

Vel1 Vel2Area1 Area2

Flow In “Q” Flow Out “Q”

Flow In “Q” = 10 GPM

D1= 1 Inch “L” Copper

Vel1 = 3.9 Ft Per Second

Flow Out “Q” = 10 GPM

D2= 2 Inches “L” Copper

Vel2 = 1.05 Ft Per Second

Page 12: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Pressure drop is defined as:

The difference in pressure between any two points

on a piece of equipment.

D1D2

Vel1 Vel2Area1 Area2

Flow In “Q” Flow Out “Q”

Flow In “Q” = 10 GPM

D1= 1 Inch “L” Copper

Vel1 = 3.9 Ft Per Second

PD1 = 6.71 Ft per 100 Ft

Flow Out “Q” = 10 GPM

D2= 2 Inches “L” Copper

Vel2 = 1.05 Ft Per Second

PD2 = 0.29 Ft per 100 Ft

PD1 PD2

Page 13: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Coil Pressure Drop =Cost of Operation

Determined from several parameters-• Unit size• Coil rows• Coil circuits• GPM• Tube water velocity• Water temperature

Use IEC Rating Program to determine pressure drop through

the coil at actual operating conditions

Example

@ 3.0 GPM

Coil PdFt = 5.9

Page 14: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Valve Pressure Drop:

• Resistance to water flow

• Based on water volume through the valve at

Full Open

• Calculated using Cv Rating Number

• PdFt = ( GPM / ( 0.658 x Cv ))^2

Page 15: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Typical Ball Valve Pressure Drop:

• PdFt = ( GPM / ( 0.658 x Cv ))^2

• Ball valve Cv = 5.84 (1/2 inch)• GPM = 3• PdFt = (3 / (0.658 x 5.84))^2

• PdFt = 0.61

Page 16: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Full-Port Ball Valve Pressure Drop:

• PdFt = ( GPM / ( 0.658 x Cv ))^2

• Ball valve Cv = 14.2 (1/2 inch B&K # 107-503T)• GPM = 3• PdFt = (3 / (0.658 x 14.2))^2

• PdFt = 0.10

Page 17: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012
Page 18: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Erie Valve Pressure Drop:

• PdFt = ( GPM / ( 0.658 x Cv ))^2

• Cv = 3.5 (1/2 inch VT2213)

• GPM = 3

• PdFt = (3 / (0.658 x 3.5))^2

• PdFt = 1.7

VT2213

3.5 Cv (7/16” Port)

25 PSI Close-Off

Page 19: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Erie Valve Pressure Drop:

• PdFt = ( GPM / ( 0.658 x Cv ))^2

• Cv = 2.5 (1/2 inch VT2212)

• GPM = 3

• PdFt = (3 / (0.658 x 2.5))^2

• PdFt = 3.3

VT2212

2.5 Cv (5/16” Port)

40 PSI Close-Off

Page 20: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Erie Valve Pressure Drop:

• PdFt = ( GPM / ( 0.658 x Cv ))^2

• Cv = 1.0 (1/2 inch VT2211)

• GPM = 3

• PdFt = (3 / (0.658 x 1.0))^2

• PdFt = 20.8

VT2211

1.0 Cv

60 PSI Close-Off

Page 21: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

Analyze Combined Unit And Valve Package Pressure Drop

@ GPM = 3.0

Ball Valve PdFt = 0.1

Coil PdFt = 5.9

Erie Valve PdFt = 3.3

Ball Valve PdFt = 0.1

Total PdFt = 9.4

÷ 2.33

= 4.0 PSI Diff

Total Value Required For Proper Fan Coil Operation

Page 22: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoiler

FCUFCUFCU

Will This Design Operate Properly ?

Supply

Return

80 PSI

Δ 10 PSI

70 PSI 65 PSI

85 PSI

Δ 20 PSI

Units &

Valves

@ 3.0 GPM

Require

4.0 PSI Diff Pump

60 GPM

60 Ft Head60 PSI

Δ 25 PSI

Typical of 20 Units

Page 23: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoiler

FCUFCUFCU

Water Balancing Is Required

Supply

Return

5 PSI

Δ 1 PSI

4 PSI 70 PSI

80 PSI

Δ 10 PSI

Pump

60 GPM

60 Ft Head60 PSI

Δ 25 PSI

Units &

Valves

@ 3.0 GPM

Require

4.0 PSI Diff

Excessive FlowLow Flow

Page 24: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoilerFCUFCUFCUFCU

Cartridge Valves For Automatic Balancing

Supply

Return

Page 25: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Hays 2517 Automatic Balancing Valve

2-80 PSID range up to 5.5 GPM

+/- 10% Accuracy

Page 26: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Valve Will Add Resistance As Required For Specified Water GPM

Page 27: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Analyze Combined Unit And Valve Package Pressure Drop

@ GPM = 3.0

Ball Valve PdFt = 0.1

Hays Valve PdFt = 4.6

Coil PdFt = 5.9

Erie Valve PdFt = 3.3

Ball Valve PdFt = 0.1

Total PdFt = 14

÷ 2.33

= 6.0 PSI Diff

FCU

Page 28: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoilerFCUFCUFCUFCU

80 PSI

70 PSI

Full Load

Pump

60 GPM

60 Ft Head

VFD

ΔP

Δ 10 PSI

Full-Load Variable Frequency Drive

Page 29: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoilerFCUFCUOFFFCU

80 PSI

70 PSI

Part Load

Pump

45 GPM

VFD

ΔP

Δ 10 PSI

Part-Load Variable Frequency Drive

Page 30: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

BoilerBoilerFCUFCUFCUFCU

80 PSI

70 PSI

Full Load

Pump

60 GPM

60 Ft Head

VFD

ΔP

Δ 10 PSI

Direct Return System

Page 31: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

ChillerChiller

Reverse Return –Balancing is reduced, therefore the need for balancing valves is reduced, but only if all coils have identical ΔP and system

pressure differential always equals coil required ΔP.

VFD

ΔP

FCU FCU FCU FCU

Page 32: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Chiller / Boiler Equipment Plant Pumps Create Water Pressure Differential Pipes Running To and From Each Unit Valves – On/Off or Modulating Balancing Valves – Flow Regulators Strainers Pressure Relief Valves Variable Speed Drives on Pumps Controls, DDC, Building Energy Management System Installation Labor – vs. – 2/Pipe – vs. – 4/Pipe Test & Balance Maintenance

System Design Issues

Page 33: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

System Complexity Issues

There Must Be A Better

Way

Page 34: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Primary Circuit Water Flow

Integrated CirculatorCycles on Thermostat

Demand

2008 ASHRAE Handbook HVAC Systems and Equipment

Chapter 12.

ThermostatOFF

Page 35: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Cool AirCool AirCool AirCool Air

Primary Circuit Water Flow

2008 ASHRAE Handbook HVAC Systems and Equipment

Chapter 12.

ThermostatON

Page 36: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Primary Circuit Water Flow

2008 ASHRAE Handbook HVAC Systems and Equipment

Chapter 12.

ThermostatOFF

Page 37: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012
Page 38: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012
Page 39: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

• Average 40% Less Piping

• Fewer Pipe Hangers

• Less Insulation

Massachusetts College of Pharmacy and Health Sciences

Worcester, Massachusetts

Page 40: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

• Reduced Core Drilling

• Fewer Joints = Fewer Leaks

• Contractor Savings

Westin Cupples StationSt. Louis, Missouri

Page 41: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Westin Cupples StationSt. Louis, Missouri

Page 42: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

CPF SureFlow Unit

What Happened To The Zone Valves

and Flow Control Valves ?

Page 43: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Circulator – 1/40 HP• 30+ Years In Production

• Millions In Use

• Quiet Operation

• Chilled Water CERTIFIED

• Wet Rotor Cartridge Design

• Internal Flow Check Valve

• 200 PSI Rating

• Cycles On-Off (Thermostat Controlled)

• Low Energy Consumer – 65 Watts

Page 44: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012
Page 45: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012
Page 46: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Two Pipe CoolingWith Only One Installed Pipe

Chiller

FANCOIL

FANCOIL

FANCOIL

FANCOIL

Water Circulation Rate ≈ 3 GPM per TonPump Head & Energy Reduced

Page 47: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Chiller

FANCOIL

FANCOIL

FANCOIL

FANCOIL

Boiler

Two Pipe Cooling & Heating “Change Over”

With One Installed Pipe

Page 48: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

2-Pipe Cooling and Heating Changeover With Only One Installed Pipe

Massachusetts College of Pharmacy and Health Sciences

Worcester, Massachusetts

Page 49: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Four Pipe Heat & CoolWith Only Two Installed Pipes

Chiller

FANCOIL

Boiler

FANCOIL

FANCOIL

FANCOIL

Page 50: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

1. What Happens To The Water Temperature ?

2. Will It Control Humidity ?

Challenges:

Page 51: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

42ºF 46.6ºF46.6ºF 48.6ºF

44.4ºF

Chiller

Off

52.1ºF

Water Temperature Changes As BTUs Are Injected Into The SureFlow Loop

1 Ton13177t 9954s

1 Ton

12052t 9519s

1 Ton

14424t 10448s

1 Ton

Page 52: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Cooling Loop Water Pipe Size

Design GuideType L Copper

Pipe Size 1” 1-1/4 1-1/2 2 2-1/2 3

GPM 8 16 25 53 85 127

FPS Vel 3.13 4.1 4.53 5.54 5.74 6.01

PdFt / 100Ft 4.53 5.66 5.46 5.58 4.57 4

Tons @ 8ΔT 2.7 5.3 8.3 17.7 28.3 42.3

Tons @ 10ΔT 3.3 6.7 10.4 22.1 35.4 52.9

Page 53: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Pipe Size 1” 1-1/4 1-1/2 2 2-1/2 3

GPM 8 16 25 53 85 127

FPS Vel 3.13 4.1 4.53 5.54 5.74 6.01

PdFt / 100Ft 4.53 5.66 5.46 5.58 4.57 4

MBH @ 20ΔT 80 160 250 530 850 1270

MBH @ 25ΔT 100 200 312 662 1062 1587

Design GuideType L Copper

Heating Loop Water Pipe Size

Page 54: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

8 Degree Loop Delta-T = 3 GPM per Ton

Cooling Loop Water Temperature

Page 55: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

10 Tons Peak x 3 GPM per Ton = 30 GPM1-1/2” L Copper @ 30GPM = 5.43 fps = 7.55 ftpd/100ft

2” L Copper Pipe @ 30GPM = 3.14 fps = 2.02 ftpd/100ft

Peak Load Analysis Sample

Page 56: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

7.5 Tons Block / 10 Tons Peak = 75% Diversity Ratio

Block vs Peak Load Analysis

Page 57: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

With 42F Supply, 3 GPM Per Ton, 75% RatioMax Actual Water Temperature = 48F

BLOCK LOAD RATIO

Design For Diversity

Page 58: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

With 42F Supply, 3 GPM Per Ton, 75% RatioMax Actual Water Temperature = 48F

Design For Diversity

SOME UNITS

ARE NOT RUNNING

ARE SOME UNITS OVER

SIZED ?

Page 59: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

SureFlow Allows Adjustment Of The Design For Occupancy

– School Classroom vs. Common areas– Hotel Rooms– Offices– Usage patterns, time of day

Page 60: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

SureFlow Allows Modification Of The Design For Run Time and Fan Speed

– Actual hours of operation with full water flow

– Good water flow rate results in excellent humidity control

– Take full advantage of controls capabilities

– Always recommend automatic fan speed reduction for extended run-time on coil

Page 61: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Circulators Only Consume Power When Running

Local Circulators Controlled by Room Thermostats

System Strategy: Demand Controlled Pumping

The Building Hydronic System Becomes An Energy Management System

Horsepower Savings

LEED 2009-NC Credit EAc1Optimize Energy Performance

Up To 19 Points Available

Page 62: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Complex 2-way valve package

= 32 solder joints

SureFlow valve package

= 16 solder joints

Installation and Maintenance Savings

Page 63: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Primary Pump

Common Load

Secondary Pump

Chiller - Or -Heat

Exchanger

Compound Primary-Secondary Pumping

Page 64: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Building 1 of X Building 2 of X

Central Plant

Campus Chilled Water

Page 65: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Balance Valves

3 Way Control Valve

Load

Replace Your Original Existing 2-pipe FCU….

CW Supply

CW Return

Page 66: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

…. With a New SureFlow Unit and Have 4-Pipe Performance With Two Pipes

Existing Pipes

HeatingCoil

HeatingCoil

CoolingCoil

CoolingCoil

CW Supply/Return

HW Supply/Return

Page 67: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

1839 US Tariff Building – General Post Office

Owner: US Department of Interior – Park Service

Lease: Kimpton Hotel & Restaurant Group

232 Rooms – AAA 4 Diamond

Opened Summer 2002

SureFlow Fan CoilsHotel MonacoWashington DC

Case Study

Page 68: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Fernando Garcia, P.E.Vice PresidentCTA Consulting Engineers Inc.Rockville, MD(301) 637-0058

Page 69: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Chicago Blackstone Renaissance Hotel

636 South Michigan332 Rooms

Restoration of 1908 HotelOpened Fall 2007

1920: Location of the famous “Smoke Filled Rooms” where Warren G. Harding was chosen as the Republican nominee for President.

1940: Franklin Delano Roosevelt’s 3rd-term Democratic Nomination was forged here.

1944: Harry S. Truman stayed here when he received Vice Presidential Nomination.

1952: Dwight D. Eisenhower stayed here during first Republican ballot.

Page 70: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

The Nines, The Luxury Collection, Starwood Hotels

Top 9 Floors - 331 Guest RoomsPortland’s First 5-Star Hotel

Lower 5 Floors is Macys Dept Store

Redevelopment of 1909 Meier & Frank Department Store

National Register of Historic Places

Opened Oct 2008 LEED Silver

Portland, Oregon

Page 71: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Elysian / Waldorf Astoria

60 Stories on East Walton Street in the Gold Coast52 Private Residences

188 Room Waldorf Astoria Hotel

Constructed 2006-2010Renamed Waldorf Astoria Chicago February 1, 2012

AAA Five DiamondTripAdvisor.com Ranked # 1 Hotel in USA

Conde Nast Traveler Ranked Best Hotel in USA

Chicago

As of Feb 1, 2012:

Hotel rates: start at $395

Condo Sales up to $8 Million

Condo Rent: $16,000/month 3-Bed, 3.5-Bath, 3,747 Sq Ft

Page 72: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

12,000 Units over 12 Years

Page 73: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Cool AirCool AirCool AirCool Air

Average 40% Less Piping

Installed Cost Savings $$$

Pump Energy Savings For Owner $$$

Reliable Operation

Occupant Comfort

LEED Credit Opportunities4 – Pipe

Performance With 2 Installed Pipes

Low Maintenance

Easy To Design

Page 74: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

www.fancoil.comwww.iec-okc.com

Page 75: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Application:SureFlow

75

Page 76: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Part Load Pump Controls

Standard Piping Method

76

Page 77: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

System Design Issues

• Chiller / Boiler Equipment Plant• Pumps Create Water Pressure Differential• Pipes Running To and From Each Unit• Valves – On/Off or Modulating• Balancing Valves – Flow Regulators• Strainers• Pressure Relief Valves• Variable Speed Drives on Pumps• Controls, DDC, Building Energy Management System• Installation Labor – vs. – 2/Pipe – vs. – 4/Pipe• Test & Balance • Maintenance

77

Page 78: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Primary

Circuit Water

Flow

Integrated Circulator

Cycles on Thermostat

Demand

Thermostat

OFF

78

Page 79: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

79

Page 80: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

SureFlow

Average 40%

Less Piping

Less Core

Drills on

Renovation

Contractor

Savings

80

Page 81: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

• 30+ Years In Production

• Millions In Use

• Quiet Operation

• Chilled Water CERTIFIED

• Wet Rotor Cartridge Design

• Internal Flow Check Valve

• 200 PSI Rating

• Cycles On-Off (Thermostat

Controlled)

• Low Energy Consumer – 65 Watts

SureFlow Circulator – 1/40 HP

81

Page 82: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Two Pipe Cooling

With Only One Installed Pipe

Chiller

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

82

Page 83: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Two Pipe Heat & Cool

With Only One Installed Pipe

Chiller

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

Boiler

83

Page 84: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

42ºF 46.6ºF46.6ºF 48.6ºF

44.4ºF

Chiller

Off

52.1ºF

Central Pump Is NOT Responsible For Pressure Drop Of Coil Or Valve Packages

1 Ton13177t 9954s

1 Ton

12052t 9519s

1 Ton

14424t 10448s

1 Ton

SureFlow System Pumping

84

Page 85: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

7.5 Tons Block / 10 Tons Peak = 75% Diversity Ratio

Block vs Peak Load Analysis

85

Page 86: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

1839 US Tariff Building –

General Post Office

Owner: US Department of

Interior – Park Service

Lease: Kimpton Hotel &

Restaurant Group

232 Rooms – AAA 4

Diamond

Opened Summer 2002

SureFlow Fan Coils

Hotel MonacoWashington DC

SureFlow Installation - Case Study

86

Page 87: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Application:SureFlow

87

Page 88: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Standard Piping Method

ChillerChiller

FCUFCUFCUFCU

88

Page 89: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Primary-Secondary Pumping

Standard Piping Method

89

Page 90: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

FCU

ChillerChiller

FCUFCUFCU

Part Load Pump Controls

Standard Piping Method

90

Page 91: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

System Design Issues

• Chiller / Boiler Equipment Plant• Pumps Create Water Pressure Differential• Pipes Running To and From Each Unit• Valves – On/Off or Modulating• Balancing Valves – Flow Regulators• Strainers• Pressure Relief Valves• Variable Speed Drives on Pumps• Controls, DDC, Building Energy Management System• Installation Labor – vs. – 2/Pipe – vs. – 4/Pipe• Test & Balance • Maintenance

91

Page 92: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Primary

Circuit Water

Flow

Integrated Circulator

Cycles on Thermostat

Demand

Thermostat

OFF

92

Page 93: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Cool AirCool AirCool AirCool Air

Primary

Circuit Water

Flow

Integrated Circulator

Cycles on Thermostat

Demand

Thermostat

ON

93

Page 94: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Design Considerations: Piping Circuits - Diverting

Series

One-pipe diverting series circuits – “when coupled with

compound pumping systems, series circuits can be

applied to multiple control zones on larger commercial

or institutional systems.”

2008 ASHRAE Handbook

HVAC Systems and Equipment

Chapter 12.94

Page 95: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

95

Page 96: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

SureFlow

Average 40%

Less Piping

Less Core

Drills on

Renovation

Contractor

Savings

96

Page 97: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

• 30+ Years In Production

• Millions In Use

• Quiet Operation

• Chilled Water CERTIFIED

• Wet Rotor Cartridge Design

• Internal Flow Check Valve

• 200 PSI Rating

• Cycles On-Off (Thermostat

Controlled)

• Low Energy Consumer – 65 Watts

SureFlow Circulator – 1/40 HP

97

Page 98: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Two Pipe Cooling

With Only One Installed Pipe

Chiller

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

98

Page 99: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Two Pipe Heat & Cool

With Only One Installed Pipe

Chiller

FAN

COIL

FAN

COIL

FAN

COIL

FAN

COIL

Boiler

99

Page 100: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Four Pipe Heat & Cool

With Only Two Installed Pipes

Chiller

FAN

COIL

Boiler

FAN

COIL

FAN

COIL

FAN

COIL

100

Page 101: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

42ºF 46.6ºF46.6ºF 48.6ºF

44.4ºF

Chiller

Off

52.1ºF

Central Pump Is NOT Responsible For Pressure Drop Of Coil Or Valve Packages

1 Ton13177t 9954s

1 Ton

12052t 9519s

1 Ton

14424t 10448s

1 Ton

SureFlow System Pumping

101

Page 102: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Coil Pressure Drop is Redesigned to Match

Circulator Pump Curve

102

Page 103: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

8 Degree Loop Delta-T = 3 GPM per Ton

Cooling Loop Water Temperature

103

Page 104: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

10 Tons Peak x 3 GPM per Ton = 30 GPM1-1/2” L Copper @ 30GPM = 5.43 fps = 7.55 ftpd/100ft

2” L Copper Pipe @ 30GPM = 3.14 fps = 2.02 ftpd/100ft

SureFlow Peak Load Design

104

Page 105: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

7.5 Tons Block / 10 Tons Peak = 75% Diversity Ratio

Block vs Peak Load Analysis

105

Page 106: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

With 42F Supply, 3 GPM Per Ton, 75% RatioMax Actual Water Temperature = 48F

BLOCK LOAD RATIO

Design For Diversity

106

Page 107: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

With 44F Supply, 3 GPM Per Ton, 75% RatioMax Actual Water Temperature = 50F

BLOCK LOAD RATIO

Warmer Supply Temperature?

107

Page 108: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

10,000 Units over 10 Years

108

Page 109: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

1839 US Tariff Building –

General Post Office

Owner: US Department of

Interior – Park Service

Lease: Kimpton Hotel &

Restaurant Group

232 Rooms – AAA 4

Diamond

Opened Summer 2002

SureFlow Fan Coils

Hotel MonacoWashington DC

SureFlow Installation - Case Study

109

Page 110: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Fernando Garcia, P.E.

Vice President

CTA Consulting Engineers Inc.

Rockville, MD

(301) 637-0058

110

Page 111: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Chicago Blackstone Renaissance Hotel

636 South Michigan332 Rooms

Restoration of 1908 HotelOpened Fall 2007

Location of the famous “Smoke Filled

Rooms” where Warren G. Harding

was chosen as the Republican

nominee for President in June 1920.

Franklin Delano Roosevelt’s 3rd-term

Democratic Nomination was forged

in 1940.

Harry S. Truman stayed when he

received 1944 Vice Presidential

Nomination.

Dwight D. Eisenhower stayed during

first Republican ballot in 1952. 111

Page 112: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Portland, OregonThe Nines Hotel

Part of The Luxury Collection, Starwood Hotels & ResortsTop 9 Floors - 331 Rooms

Lower 5 floors is Macy’s

Redevelopment of 1909 Meier & Frank Department Store

National Register of Historic Places

Opened October 16, 2008LEED Silver

112

Page 113: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

New Orleans Monaco Hotel

250 Units

Historic 1926 Masonic Temple Lodge

June 2001 Conversion to a 4-Star Luxury

Hotel

Kimpton Sold to Dimension Development Co.

Reopened 2007 as the Hilton Saint

Charles

Humidity Kept Under Control

113

Page 114: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

Cool AirCool AirCool AirCool Air

Average

40% Less

Piping

Installed Cost

Savings $$$

Pump

Energy

Savings For

Owner $$$

Reliable

Operation

Occupant

Comfort

LEED Credit

Opportunitie

s

4 – Pipe

Performance

With 2 Installed

Pipes

Low

Maintenance

Easy To

Design

114

Page 115: SureFlow Presented by: Ron Porter LEED AP IEC Oklahoma City Copyright 2012

www.fancoil.comwww.iec-okc.com

115