surajit cv.doc

11
SURAJIT DAS 1 SURAJIT DAS CONTACT Pratayee apartment- BLOCK-G,Flat no-13,Bamunara.City- Durgapur.State-West Bengal.Country- India.Zip-71 3212 QUALIFICATIONS Diploma: Mechanical Engineering 1990 JOB OBJECTIVE A proactive, adaptable and conscientious as Mechanical Engineer with 24 years experience in Project and maintenance of . Seeking a position for a construction engineer to utilize my engineering experiences in the areas of mechanical Maintenance and construction of Power Plant/Steel Plant/Oil & Gas/,Material handling/HVAC/,Pipings. To contribute best of my knowledge ,skill and ability in the growth of the organization, where I will be working. SUMMARY More than twenty-five years of organizational experience on Maintenance , Erection, Testing and Commissioning of Thermal and Gas based Power Plant/Oil & Gas/Steel/HVAC/Material surajit.das111 @gmail.com Abu dhabi-0971-505653342 India-0091- 8159023350

Upload: surajit-das

Post on 13-Apr-2017

21 views

Category:

Career


2 download

TRANSCRIPT

Page 1: Surajit cv.doc

SURAJIT DAS 1

SURAJIT DASCONTACT Pratayee apartment-

BLOCK-G,Flat no-13,Bamunara.City- Durgapur.State-West Bengal.Country- India.Zip-71 3212

QUALIFICATIONSDiploma: Mechanical Engineering 1990

JOB OBJECTIVEA proact ive, adaptable and

consc ient ious as Mechanical Engineer

wi th 24 years exper ience in Project

and maintenance of . Seeking a

pos i t ion for a construct ion engineer to

ut i l ize my engineer ing exper iences in

the areas of mechanical Maintenance

and const ruct ion of Power Plant /Steel

Plant /Oi l & Gas/ ,Mater ia l

handl ing/HVAC/,Pip ings.

To contr ibute best of my

knowledge ,sk i l l and abi l i ty in the

growth of the organizat ion, where I

wi l l be work ing.

SUMMARY

More than twenty-f ive years of

organizat ional experience on

Maintenance , Erect ion, Test ing

and Commiss ioning of Thermal

and Gas based Power P lant /Oi l

& Gas/Steel /HVAC/Mater ia l

Handl ing.

Exper ience on Overhaul ing,

Faul t d iagnosis & t rouble

shoot ing of a l l rotat ing & stat ic

surajit.das111 @gmail.com Abu dhabi-0971-505653342

India-0091-8159023350

Page 2: Surajit cv.doc

SURAJIT DAS 2

equipments.

Adjust and repair or replace of

defect ive par ts of Boi ler,

Turbine, Al l type of pumps,

Compressors,Turbochargers,He

at exchangers,HFO & Lub oi l

Separators

Schedul ing and p lanning for

prevent ive Maintenance,

Correct ive and predic t ive

Maintenance.

Superv ised mechanical des ign

of faci l i ty, inspected layout ,

equipment arrangement and

p lant ut i l i t ies .

Provided necessary suppor t to

manufactur ing process,

prepared plan to improve

eff ic iency and reduced cost .

Performed regular checks and

ensured that a l l safety

regulat ions were fo l lowed.

Planning Co-coordinat ing of

Prevent ive and breakdown

act iv i t ies for achieving high

p lant avai labi l i ty to meet

generat ion target .

Inventory cont ro l of

maintenance Spares.

Leading a team of technic ians,

sk i l led & unsk i l led workers for

p lant maintenance and up

gradat ion.

Prepar ing s tandard maintenance

procedure, Manual , Check- l ist &

Work instruct ions.

Fabr icat ion, Erect ion, Test ing,

Commiss ioning of Equipments

l ike Reactors , Pressure

Vessels, C.S & S.S Tanks, Heat

Exchanger, Wind mi l l towers

Support Blocks, Conveyors,

Columns, Ducts , Chimneys and

Insta l la t ion of HVAC Duct ing,

Process and Power Pip ing, F i re

f ight ing pip ings and Gas

p ip ings.Made out of Exot ic

Metal l ike Sta in less Steel ,

Carbon Steel , Cast I ron, Duct i le

Page 3: Surajit cv.doc

SURAJIT DAS 3

I ron, G. I & UPVC etc. As per

ASME,BS,IS & API Standard.

Good Exposure in a l l welding

Technologies l ike SMAW,

GTAW,MIG & SAW.

ACHIEVEMENT Successfu l ly Test ing and

commiss ioned Fuel Oi l & Fuel

Gas System including gas

compressor,PRS System of

1619MW MIRFA IWPP

Project(Abu Dhabi) On behal f of

Hyundai Engineering and construct ion(Korea)

Erect ion, successfu l ly

commiss ioned and Maintenance

of 25cu-m ci rcular S inter

p lant ,4.7MW CPP at KIC Metal iks

Engineer ing, insta l la t ion,

commiss ioning of 1.2mtpa Non-

recovery type Coke Oven and

RMHS at BEL .

. Successfu l ly commiss ioned

0.4mtpa capaci ty non-recovery

coke oven p lant at VISA Steel

Insta l la t ion and commissioning

of 4500TPH CHP inc luding

Stacker,Recla imer and ship

loader at Paradeep pot t rust on

behal f of BHPE-KINHILL(Austral ia) .

Successfu l ly Commiss ioned and

Maintenance of CFBC Boi ler,

Turbine Auxi l iar ies,CHP & AHP

in 2nd and 3rd uni t o f 100MW

HINDALCO(Hirakud) Thermal

power p lant

Page 4: Surajit cv.doc

SURAJIT DAS 4

Successfu l ly commiss ioned and

maintenance of Boi ler

Auxi l iar ies, Cool ing Tower,Coal

and Ash handl ing p lant of

2x250MW CESC Budge budge

Thermal power p lant .

Successfu l ly commiss ioned

NTPC 650MW Combined Cycle

Power p lant at Bharuch

(Gujarat) on be hal f o f

Kawasaki Heavy Industry(Japan).

WORK EXPERIENCE May 2016 — Continue

HYUNDAI ENGINEERING AND CONSTRUCTION LTD

Commissioning Engineer

MIRFA IWPP Combined cycle Power project(Abu Dhabi)

Fuel Gas System Commissioning , Total Gas Flow rate of 460T/h in FGS(Pigging, Fuel Gas Compressors-of Samsung Techwin- Lube Oil Flushing, Filter & Separator Skid, Water Bath Heater, Pressure Reducing Control Station, Fuel Gas Electric Heater, Final Chance Filter)

CCW Commissioning( Flushing of CCW System of common plant system, OCGT,CCGT)

DMPF Commissioning (Settlement Test for DMPF tanks of 296m3 capacity , Bubble Test, Leakage test of Permeate Tank, Backwash Tanks)

Page 5: Surajit cv.doc

SURAJIT DAS 5

Sea Water Intake( Pre-commissioning of MCW Pumps, RO Pumps, ACW Pumps)

Fuel Oil System (Air blowing, 29600 m3 Diesel Oil Tank, OIL Flushing, Unloading Pumps, Forwarding Pumps, and Return Oil Pumps. Pre filters)

Boiler Feed Pumps(Lube Oil Flushing)

KIC METALIKS LTDNovember 2010 — March2016

Sr Manager

POWER PLANT

Working as an Sr Mgr (Power

p lant ) of 4.7MW capt ive power

p lant . Responsib le for

operat ion and maintenance of

a l l mechanical equipments l ike

TG and i ts aux i l iar ies,

Boi ler , I .D/F.D Fan, D.M Plant

etc .

Led the p lanning, budget ing and

d i rect ion of a l l Maintenance

works.

Coordinated t ra in ing for the

Maintenance teams on s i te-

speci f ic requirements,

techniques and procedures.

Monitored the safety of a l l

const ruct ion act iv i t ies , making

on-s i te personnel safety the top

pr ior i ty.

Implement shor t term and long

term maintenance p lan.

Manage maintenance act iv i t ies

to prevent breakdown of

machines.

Manage Inspect ion of equipment

and machinery.

Analyze the inspect ion data.

Ident i fy potent ia l problems

before they become more cost ly

to address and reduce overhead

costs .

Page 6: Surajit cv.doc

SURAJIT DAS 6

Provide resources to conduct

maintenance act iv i t ies dur ing

p lanned downt ime.

BENGAL ENERGY LTD Dec2007 — November 201 0

Sr Manager

Look af ter Al l mechanical act iv i t ies

including co-ord inat ion wi th vendors,

pro ject Moni tor ing

and fo l low-up for t imely complet ion of

the 0.6MTPA non recovery type coke

oven pro ject . under

consul tancy of M/s FLSmidth

including commiss ioning of wagon

tr ip ler, stacker and rec laimer

.Addi t ional assignment is as an in

charge of maintenance at Raw

mater ia l handl ing system

VISA STEEL LTD March 2004 — Nov 2007

Assistant Manager

Working as a Manager(Mech) in

0.4 MTPA capaci ty Coke oven

pro ject des igned by SSIT China.

Mode of Responsibi l i ty is

pro ject moni tor ing, fo l low-up,

superv is ion & coordinat ion wi th

consul tant .

Inspect ion & Supervis ion of

St ructura l fabr icat ion, Erect ion

and Equipment erect ion &

a l ignment a lso is my part of job.

DEVELOPMENT CONSULTANTS LTD

Page 7: Surajit cv.doc

SURAJIT DAS 7

Construction Engineer

Enormous knowledge of the

operat ion and maintenance of

h igh-pressure boi lers and

re lated mechanical equipment.

Thorough knowledge of the

occupat ional hazards and safety

precaut ions appl icable to the

work.

As an ass is tant resident

engineer (mechanical ) posted

at 100MW INDAL HIRAKUD

POWER PROJECT

responsib i l i ty in th is pro ject is

moni tor ing .co-ord inat ion,

superv is ion, qual i ty survei l lance

.p lanning and fo l low up for

t imely complet ion of pro ject .

Also day to day inspect ion of

6000mt s tructura l fabr icat ion,

erect ion of Boi ler and power

house , raw water p ipe l ine,

coal handl ing p lant .

Superv is ion &

inspect ion of al ignment

of Turbine & Auxi l iar ies

and re lated HP & LP

pip ing erect ion is my

mode of job &

responsib i l i ty.

Checking of deta i led s tructura l

fabr icat ion drawings and project

management services of

d i fferent pro ject .

As a mechanical inspector

posted at Shoaiba near Jeddah

at Desal inat ion plant Cl ient :

SALINE WATER CONVERSION

CORPORATION in SAUDI

ARABIA on behal f of THE KULJIAN CORPORATION . for

instal lat ion of ESP & ASH

SILO . Mode of work in th is

pro ject is Moni tor ing,

superv is ion & Inspect ion,

qual i ty contro l of construct ion

act iv i ty. Also look af ter erect ion

of equipments including

March 1993 — March 2003

Page 8: Surajit cv.doc

SURAJIT DAS 8

pip ing .Responsib le for erect ion

superv is ion , inspect ion of F i re

f ight ing package , hydrant

system, A ir Condi t ioning

VENTILATION SYSTEM OF

SWITCH GEAR room Pip ing

work of fuel o i l addi t ive system

etc . Const ructed by HYUNDAI

HEAVY INDUSTRY.

As a construct ion

Engineer(mech.) on behal f of

Aust ral ian Consul tant BHPE-KINHILL a t (4000 TPH capaci ty

coal handl ing p lant at paradeep

or issa) and responsib le for

superv is ion, Inspect ion, qual i ty

assurances of Fabr icat ion &

Erect ion of 3800 MT structure .

Also responsib le for superv is ion

and Inspect ion of assembly &

Erect ion of s tacker & rec la imer ,

Magnet ic seperator , Ship

loader , Rai l receival stat ion ,

coal conveyors of 2400mm to

1800mm width and appx 9km

length.

As construct ion superv isor

(mech) responsib le for

const ruct ion superv is ion ,

Inspect ion , Qual i ty assurance,

pro ject moni tor ing &

Cert i f icat ion of contractors b i l l /

measurement sheet of

Fabr icat ion & Erect ion of Power

house , Coal mi l l , Boi ler

st ructures & chimney . My

mode of work also inc lude

Superv is ion & Inspect ion of

mechanical equipment erect ion

in Ash handl ing plant and

cool ing towers, at 2x250MW

Budge Budge Power Generat ion

Stat ion CESE Ltd. near Kolkata.

As Construct ion

superv isor(Mech) posted at

NTPC 650 MW combined cyc le

power pro ject at Bharuch

(Gujarat) on behal f of

KAWASAKI HEAVY INDUSTRY (JAPAN ) . Here my mode of work

Page 9: Surajit cv.doc

SURAJIT DAS 9

is superv is ion , Inspect ion &

Qual i ty survei l lance of

fabr icat ion & Erect ion of F lue

stack , p ipe supports , p ipe

br idges. P ipe racks etc Tota l l ing

3000 MT.

Larsen & Toubro March 2003 — March 2004Assistant Manager

Look af ter Al l mechanical

act iv i t ies inc luding co-ord inat ion

wi th vendors, pro ject Moni tor ing

and fo l low-up for t imely

complet ion of the Lafarge Surma

Cement pro ject . Inc luding

Drawing rev iew of the above

pro ject .

ABROAD EXPERIENCE

China, Kingdom of Saudi Arabia,UAE

ADDITIONAL INFORMATION

JOINING TIME REQD:Immediate

PASSPORT NO AND VALIDITY:G6133845 03/02/2018

SKYPE ID :sdrdtd

REFERENCES

1) Mr A.K Lamba(Execut ive Director) -Act ion Ispat-Mobi le-9968840148

2) Mr Di l ip Baner jee(Execut ive Director) -Development Consul tants Ltd-Mobi le-9475326033