![Page 1: Supplementary Agenda for 28th WRPC Meeting: Item No SA ...received by Jhanor-Gandhar station has started decreasing from November,2014 and of late the station is not getting any generation](https://reader035.vdocuments.mx/reader035/viewer/2022071514/613526e0dfd10f4dd73c304b/html5/thumbnails/1.jpg)
Supplementary Agenda for 28th WRPC Meeting:
Item No SA-1: Balance Proposals from 37th SCM for WR an 19th OA meeting:
PGCIL have intimated that the 27th WRPC meeting covered a few proposals from
the 37th SCM of WR and 19th Open Access Meeting. The list of proposals not
covered in 27th WRPC meeting, but concurred in 37th SCM of WR and 19th Open
Access meeting that requires WRPC concurrence as furnished by PGCIL is given in
Annex- (SA-1-Exhibit-1)
WRPC may like to approve.
Item NO SA-2: SCHEDULING OF POWER FROM NTPC JHANOR-GANDHAR
STATION.
NTPC have intimated the following with respect to scheduling of power
from NTPC-Jhanor stations:
Govt. of India has allocated APM gas, the cheapest gas available in the
country to all NTPC gas stations including Jhanor-Gandhar. A part of APM gas is
supplied to Jhanor-Gandhar station from ONGC’s South Gujarat fields through a
dedicated pipeline in GAIL’s South Gujarat network. As per the requirement NTPC
has entered into APM gas supply agreements with GAIL for committed drawl with
Take-or-Pay clause.
It has been observed that generation schedule on domestic APM gas
received by Jhanor-Gandhar station has started decreasing from November,2014
and of late the station is not getting any generation schedule. In the absence of
schedule, station is not able to draw ONGC’s South Gujarat gas from GAIL. Due to
technical constraints GAIL has indicated its inability to divert this gas to other gas
stations of NTPC. Further GAIL vide letter dated 30.01.2015 has raised concerns
regarding facing of serious operational and contractual problems due to this poor
off take of gas. The poor off take has been leading to instances of flaring of this
gas by ONGC which is a terrible waste of scarce national resource.
![Page 2: Supplementary Agenda for 28th WRPC Meeting: Item No SA ...received by Jhanor-Gandhar station has started decreasing from November,2014 and of late the station is not getting any generation](https://reader035.vdocuments.mx/reader035/viewer/2022071514/613526e0dfd10f4dd73c304b/html5/thumbnails/2.jpg)
It may also be noted that MOP & NG which allocates domestic gas has
taken a very serious view of this situations where gas suppliers are compelled to
flare gas due to poor off take by consumers. As APM is the cheapest gas in the
country, any shortfall in its drawl may lead the Govt. to reduce allocation of the
same to this & other NTPC stations.
GAIL has further intimated that if this situation continues, they would be
constrained to enforce Take-or-Pay charges on the station in line with the
contractual obligations. To obviate such situation, it is requested that sufficient
schedule may be given to Jhanor-Gandhar station so that the station can operate
at least at its technical minimum load in combined cycle mode and can draw the
committed gas from GAIL to avoid Take-or-Pay situation.
WRPC may like to discuss:
![Page 3: Supplementary Agenda for 28th WRPC Meeting: Item No SA ...received by Jhanor-Gandhar station has started decreasing from November,2014 and of late the station is not getting any generation](https://reader035.vdocuments.mx/reader035/viewer/2022071514/613526e0dfd10f4dd73c304b/html5/thumbnails/3.jpg)
MoM of SCMAgenda Point as
.ormnqency arrangement(,:h::lmrl:;1 765!400kV pooling -::tt:lj'lnn
Item no, at Indore
ltem no.
in DGEN - Vadodara 400kV Ole line at
in
WRI
rAar:tnl~p,at Auranqabad.
765 kV line reactors as Bus reactor atJabalpur pool SUbstation,
Listof Agenda Items from 19thOpen Access meeting of Western Region:
Item no, inMoM Agenda Point as per the MoM of 19thOpen Access meeting