sunyit constructionv2 1 r
DESCRIPTION
New buidings on campusTRANSCRIPT
![Page 1: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/1.jpg)
What is the buzz all about?
![Page 2: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/2.jpg)
SUNYIT From The Sky
We are growing and expanding!
![Page 4: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/4.jpg)
This is becoming…The New CAT/ Quad-C Building
![Page 5: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/5.jpg)
The New CAT / QUAD-C Project
•Three- Story Structure•$27.5 Million Building•180,000 square feet•System on a chip (SOC) technologies•Nfrastructure to be a tenant•Partnership with University of Albany College of Nanoscale Science and Engineering
![Page 6: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/6.jpg)
Field House
• The field house will feature:– A state-of-the-art fitness center– Two full-sized basketball courts– Four volleyball courts– Indoor practice facilities– A running track– An expansive training room– Team rooms– Athletic department offices. – A new baseball field
• Groundbreaking was in 2009- the building should be completed in 2011
![Page 7: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/7.jpg)
Field House
• A $20-million field house
• A new baseball field
![Page 8: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/8.jpg)
Student Center
• The $13.6 million Student Center will provide students with a unique gathering place and will include a cafe, theater, Wildcat Media and Student Association offices.
![Page 9: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/9.jpg)
Student Center
![Page 10: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/10.jpg)
Oriskany Residence Hall
![Page 11: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/11.jpg)
New Campus Preview
![Page 12: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/12.jpg)
More Information• http://www.sunyit.edu/virtual_tour• http://www.sunyit.edu/watchusgrow
![Page 13: Sunyit Constructionv2 1 R](https://reader036.vdocuments.mx/reader036/viewer/2022062708/5589f048d8b42ae4508b456b/html5/thumbnails/13.jpg)
Thank YouCopyrighted 2010
Co-produced by Maria Del Amo and Dennis Conard