Page 1: Summerton Way Pond Retrofit

A Fairfax County, VA, publication

Department of Public Works and Environmental Services

Working for You!

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP SUMMERTON WAY POND RETROFITContract Number CN12125064Project Number SD-000031-074Task Order No. 13Springfield District

June 5, 2014

Page 2: Summerton Way Pond Retrofit

SPRINGFIELD FOREST SCHUPPS ADD. 1115DPSUMMERTON WAY POND

Capital Facilities/Utilities Design and Construction Division/Transportation and Stormwater Construction Branch

Page 3: Summerton Way Pond Retrofit

Project DetailsSPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Description:

The Springfield Forest Schupps Add. 1115DP Summerton Way Pond project was substantially completed on May 23, 2014. This is an existing Stormwater Management facility located on Summerton Way. The project is to retrofit the existing dry pond to provide stormwater quality and detention improvement. The proposed water quality benefits realized by this project will be the removal of 1.83 lbs/year of total phosphorus, 8.34 lbs/year of total nitrogen and 358.69 lbs/year of total suspended solids.

Project Overview:• Removed the existing concrete trickle ditch, regraded the facility to lengthen the flow path and

maximize the pond volume.• Excavated and constructed three micro-pools at a maximum depth of 18” below the pond bottom.• Installed a proposed EW-1A endwall along with 10’ long reinforced bedding material.• Installed the proposed 18”x32” concrete apron and a reverse flow trash rack at the existing riser. • Constructed an 8’ wide gravel maintenance access road with a CG-9B driveway entrance•Restored the site with selective seed mix and plantings.

Project Team:• Stormwater and Planning Division - Rose Barrie• Utilities Design and Construction Division - Yousef Rayyan• Utilities Design and Construction Division - Paul Thaler• Surveyor - Gregory Harper

Page 4: Summerton Way Pond Retrofit

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Springfield, VA, Tax Map #91-1

Project Site

Page 5: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Pre-construction Conditions of the Stormwater Facility

Page 6: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Post-Construction & Landscaping

Page 7: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Pre-Construction Condition of Riser

Page 8: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Post-Construction

The new installed trash rack

Page 9: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND Pre-construction condition of the Inflow Location (Headwall)

Pre-construction Headwall

Page 10: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Placing reinforced bedding material at the inflow locations

New Endwall EW-1AInflow locations were armored with reinforced bedding material

Page 11: Summerton Way Pond Retrofit

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Restoring the site with selected seed mix and plantings

Page 12: Summerton Way Pond Retrofit

Before After

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Page 13: Summerton Way Pond Retrofit

Additional Information

For additional Information, please call

www.fairfaxcounty.gov/dpwes

SPRINGFIELD FOREST SCHUPPS ADD. 1115DP - SUMMERTON WAY POND

Ben Boxer, Public Information Officer703-324-5880, TTY 711

Ben. Ben Boxer, Public Information Officer703-324-5880, TTY 711

Ben. Ben Boxer, Public Information Officer703-324-5880, TTY 711

[email protected]

Capital Facilities/Utilities Design and Construction Division/Transportation Stormwater Construction Branch

Irene Haske, Public Information Officer703-324-5821, TTY 711

[email protected]