Select loads main and second foor with a/c Provide complete “turnkey project’’ for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads and or appliances of the home will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for select circuits for the main oor and second oor general outlets, lighting, refrigerator, free!er, and selected gas furnace, heating and "#$. These select circuits are to be relocated to a generator a transfer switch sub panel% this transfer switch sub panel will be added and located ne&t to the e&isting panel. 'o other ()* volt appliances will have the capability to operate on the generator, such as dryer, range oven, cook top +unless these items are gas operated or additional "#$ units, etc. -our main electrical panel will be recon gured and these select circuits are to be relocated to a generator transfer switch sub panel% this transfer switch sub panel will be added and located ne&t to the e&isting panel. /ue to the si!e of the heat and "#$ system, a load management system would be re0uired for this generator.

Upload: thecodeking

Post on 06-Oct-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Select loads main and second floor with a/c Provide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads and or appliances of the home will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for select circuits for the main floor and second floor: general outlets, lighting, refrigerator, freezer, and selected gas furnace, heating and A/C. These select circuits are to be relocated to a generator a transfer switch sub panel; this transfer switch sub panel will be added and located next to the existing panel. No other 240 volt appliances will have the capability to operate on the generator, such as dryer, range oven, cook top (unless these items are gas operated) or additional A/C units, etc. Your main electrical panel will be reconfigured and these select circuits are to be relocated to a generator transfer switch sub panel; this transfer switch sub panel will be added and located next to the existing panel.Due to the size of the heat and A/C system, a load management system would be required for this generator.

EZ selected loads or area no a/c Provide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for circuits for the kitchen, family/den room, master bed room and bed rooms and general outlets, lighting, refrigerator, micro wave, freezer, and gas furnace heating No other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top( unless these items are gas operated) or A/C units E.C.T These select circuits are to be relocated to a generator a transfer switch sub panel; this transfer switch sub panel will be added and located next to the existing panel.

The circuitry is not limited to the above items and there are areas or items that may be added or removed base on generator load, we have allowed room for these item in our calculations, additional load management may be added in the future.Your main electrical panel will be reconfigured and these select circuits are to be relocated to a generator transfer switch sub panel; this transfer switch-sub panel will be added and located next to the existing panel. Due to the size of the heat and A/C system load management system would be required for this generator. This proposal is not for adding any future generator or paralleling future generator for expansion with this generator, please see additional proposals.

EZ select rooms and selected loads or area AND 1 A/C Provide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for the kitchen, family/den room, master bed room and bed rooms and general outlets, lighting, refrigerator, micro wave, freezer, and selected gas furnace heating and selected A/c. No other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top (unless these items are gas operated) or additional A/C units E.C.T These select circuits are to be relocated to a generator a transfer switch sub panel; this transfer switch sub panel will be added and located next to the existing panel.

The circuitry is not limited to the above items and there are areas or items that may be added or removed base on generator load, we have allowed room for these item in our calculations, additional load management may be added in the future.Your main electrical panel will be reconfigured and these select circuits are to be relocated to a generator transfer switch sub panel; this transfer switch-sub panel will be added and located next to the existing panel. Due to the size of the heat and A/C system load management system would be required for this generator. This proposal is not for adding any future generator or paralleling future generator for expansion with this generator, please see additional proposals.

Gen ready pan Provide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for the kitchen, family/den room, master bed room and bed rooms and general outlets, lighting, refrigerator, micro wave, freezer, and selected gas furnace heating and one A/C

No other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top ( unless these items are gas operated) or additional A/C units E.C.T The circuitry is not limited to the above items and there are areas or items that may be added or removed base on generator load, we have allowed room for these item in our calculations, additional load management may be added in the future.Your main electrical panel will be reconfigured and replaced with a generator ready transfer switch type panel. The select circuits reconfigured to the generator portion of the panel. This proposal is not for adding any future load to the generator or future or for expansion with this generator.

RTS transfer with load managed house/locked outProvide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for all rooms for general outlets, lighting, refrigerator, micro wave, freezer, and selected gas furnace heating and selected A/C. Due to the size of the heat and A/C system load management system would be required for this generator. No other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top (unless these items are gas operated) or additional A/C units E.C.T The circuitry is not limited to the above items and there are areas or items that may be added or removed base on generator load, we have allowed room for these item in our calculations, additional load management may be added in the future. Your main electrical panel will be reconfigured and selected loads will be locked-out (programed to turn off) on generator emergency power during a power outage and will operate normal while your home is operating on utility power during normal operation. This proposal is not for adding any future load to the generator or for expansion with this generator.2 RTS transfer with load managed house/locked outProvide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and Two transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for all rooms for general outlets, lighting, refrigerator, micro wave, freezer, and selected gas furnace heating and selected A/C. Due to the size of the heat and A/C system load management system would be required for this generator. Your main electrical panel will be reconfigured and selected loads will be locked-out (programed to turn off) on generator emergency power during a power outage and will operate normal while your home is operating on utility power during normal operation. This proposal is not for adding any future load to the generator or for expansion with this generator. RTS transfer with whole house managedProvide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for the whole house Due to the size of the heat and A/C system and other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top (unless these items are gas operated) or additional A/C units E.C.T load management system would be used and required for this generator. Your main electrical panel will be reconfigured and selected loads will be managed on generator emergency power during a power outage and will operate normal while your home is operating on utility power during normal operation. This proposal is not for adding any future load to the generator or for expansion with this generator.Multiple RTS transfer with whole house managedProvide complete turnkey project for the installation of home standby generator system. This proposal is for one generator and Two transfer switch installation. The selected areas, loads or appliances will operate on generator emergency power during a power outage and utility power during normal operation. The generator is to provide power for the whole house Due to the size of the heat and A/C system and other 240 volt appliances are to operate on the generator, such as dryer, range oven, cook top (unless these items are gas operated) or additional A/C units E.C.T load management system would be used and required for this generator. Your main electrical panel will be reconfigured and selected loads will be managed on generator emergency power during a power outage and will operate normal while your home is operating on utility power during normal operation. This proposal is not for adding any future load to the generator or for expansion with this generator.