SUMITOMO RUBBER THAILAND

TORU KIRA (TUMSAT)

SAKDA JAMPASA (CU)

Presented by

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Page 2: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Our Safety Motto

When I cross road, I point both side by fingers

I will always keep the rules during the operation

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Page 3: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Introduction of company

Finding Issues

KAIZEN

Conclusion

OUTLINE

Page 4: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

President Mr. Toru Nagahata

Foundation May 2005

Products

Capacity 78,150 pcs/day

Co-workers 6354 including 35 Japanese

Introduction of company

Tires

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Page 5: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Tire production process

Primary Production

Material

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Inspec.

Steel & Textile

Mixing

Extruding

Topping

Building Curing

Material process

Page 6: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Tire components

Tread JLB

Breaker PLY

SW

Bead

Inner Chaffer

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Page 7: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

WOA=WORK OBSERVE ACTIVITY

Study of

KAIZEN

Observe

Check

time

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

How to do WOA

Analyze

Data

Discussion

Find KAIZEN

Points

Page 8: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

How to find KAIZEN

3M

Muda

Mura Muri

Page 9: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Actual

Takt time,

620.2

Target

Takt time,

600 595

605

615

625

635

645

Sec

/rea

l

Yamazumi chart of Inner Chaffer #1 S

ec/r

eal

How to reduce

Baratsuki

Baratsuki is variance of data.

Lot change, 352

Page 10: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

STD Time Baratsuki % Loss

Cycle time 203 17.2 74%

CF Change 22 0.8 3%

Lot Change 352 5.2 23%

Total (sec) 577 23.2 100%

Baratsuki cycle (sec)

Length/reel 9.2

Operation 8.0

Total 17.2 sec

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Data analysis

17.2

17.2 sec KAIZEN

Page 11: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Finding KAIZEN

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

What is KAIZEN point?

Manual doesn’t instract the timing of checking

the width of Inner Chaffer

Timing is different depending on operators

Baratsuki

Page 12: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Layout pathways of operator

CHULALONGKORN

UNIVERSITY

Tokyo University of Marine

Science and Technology

Quality Safety Stock Starting : setting Liner

Finish : Stock Mat.

A B

Page 13: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

step Pathway A Hand Auto

4 Setting CF 5 Auto 21 6 Check WID#1 12 7 Auto 59 8 Check WID#2 12 9 Auto 92

10 Check WID #3 13 Total 37 172

step Pathway B Hand Auto

4 Setting CF 5 Check WID#1 6 6 Auto 99 7 Check WID#2 12 8 Auto 73 9 Check WID #3 13

Total 31 172

PC

11

7

5

9

4 6 8 10

PC

10

6

8

4 5 7 9

A

B

Comparison of layout pathways

Page 14: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Before After

Max.Barastuki 80 80

Lot Change 352 352

CF Change 22 22

Cycle time 203 203

Actual Takt time 620.2 613.6

Target Takt time 600 600

Avg.Baratsuki 25.2 18.6

Cycle time, 203 Cycle time, 203

CF Change, 22 CF Change, 22

Lot Change, 352 Lot Change, 352

Actual Takt time, 620.2 Actual Takt time, 613.6

Target Takt time, 600 Target Takt time, 600

0.0

100.0

200.0

300.0

400.0

500.0

600.0

700.0

Sec

/rea

l

Yamazumi chart comparison

Before After

614.2

614.2

19.2

Page 15: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Actual Takt time,

620.2 [系列名],

614.2

Target Takt time,

600

Target Takt time,

600 595

605

615

625

635

645

Sec

/ree

l

STD Time Baratsuki

Before

Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2

Actual Takt Time 620.2 Target Takt Time 600

STD Time Baratsuki

After

Max Baratsuki 80

Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 11.2

Actual Takt Time 614.2 Target Takt Time 600

Yamazumi chart comparison

Before After

Actual Takt Time = Necessary loss + Ave. Barasatki + Cycle Time

Plan B put in manual

Page 16: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Standard Quality

Kindness

Team work

SAKDA’s impression

Page 17: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Communication

Safety

Keep rules

TORU’s impression

Page 18: SUMITOMO RUBBER THAILAND - kaiyodaiglobal.come3%80%80HP.pdf · Max Baratsuki 80 Lot Change 352 5.2 CF Change 22 0.8 Cycle time 203 17.2 Actual Takt Time 620.2 Target Takt Time 600

Product Development of Food

improve Feedback Find

problem

TORU’s impression