Suisun Valley K-8 Classroom Addition Summary
SITE MODIFICATION FEATURES
•7 New classrooms centered around ‘courtyard’ spaces•3 New restrooms (Boys, Girls, Staff)•4 Existing portables relocated to accommodate a ‘finger plan’ design for better visibility•New stamped concrete surface with tree planter boxes•Revised parking lot•New grass turf athletic field located behind the multi-use building•New fenced Kindergarten playground area
Suisun Valley K-8New Classrooms
NEW BUILDING FEATURES
•Cool roofs for energy efficiency•Abundant natural lighting (windows)•Solar tube skylights for additional natural lighting•Front and rear classroom exits•Buildings set at grade- no ramps•Roof overhangs for rain•Central layout to allow better collaboration between classes