Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 1 04/25/12
Presented by: Michael Bledsoe, President Pervious Concrete, Inc.
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 2 04/25/12
Introduction
Introduction
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 3 04/25/12
Introduction
Desired End Result
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 4 04/25/12
Introduction
Desired End Result
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 5 04/25/12
Introduction
Desired End Result
Play Video
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 6 04/25/12
Introduction
Desired End Result
How It Works
Imagine: Bowl of Marbles Glass Vase – Hole in Bottom Super Glue on Marbles Dump Marbles in Vase Super Glue Dries Pour in Water
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 7 04/25/12
Introduction
Desired End Result
How It Works
Action / Execution Look over my shoulder Examine Key Steps Tour Some Sites
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 8 04/25/12
Introduction
Desired End Result
How It Works
Action / Execution
Central Concept Manage the Marbles Manage the Glue
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 9 04/25/12
Pre-Installation
New Section
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 10 04/25/12
Pre-Installation
Quality Installer
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 11 04/25/12
Pre-Installation
Quality Installer
Experience Prior Success
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 12 04/25/12
Pre-Installation
Quality Installer
Specs
Strongly Recommended
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 13 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
Critical Success Factor +/- 40% Voids – Aggregate +/- 20% Voids – Finished Concrete Enough water to hydrate +/- .30 w/c Not too much to slide off aggregate Admixtures to improve performance
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 14 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
Depth provides Strength ACI 522.1-08 allows only 1/4 in. Error Depth
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 15 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
Grade of Aggregate Base is Critical Crushed, not Round - Ruts
Depth
Aggregate Base
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 16 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
ACI 522.1-08 - not exceed 20 ft - Larger not > 125% Smaller
Depth
Aggregate Base
Jointing Plan
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 17 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
ACI 522.1-08 - 0% below top grade
Depth
Aggregate Base
Jointing Plan
Forming
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 18 04/25/12
Pre-Installation
Quality Installer
Specs
Mix Design
Desirable if Installer has success history with mix supplier On site representative Details – Truck wash/out & spin
Depth
Aggregate Base
Jointing Plan
Forming
Mix Teamwork
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 19 04/25/12
Installation
New Section
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 20 04/25/12
Installation
Test Panel Required by ACI 522.1-08 Protection from BIG Problems Becomes Acceptance Test Standard Site +/- 5% of Test Panel
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 21 04/25/12
Installation
Test Panel Measures Plastic Unit Weight +/- 5 lbs / cuft of Design Unit Weight
ASTM C138
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 22 04/25/12
Installation
Test Panel Chute Pour is Best - Fastest - Least Time Exposed to Air TeleBelt is Possible Pumping is Not Possible
ASTM C138
Pour from Chute
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 23 04/25/12
Installation
Test Panel TeleBelt is Possible
ASTM C138
Pour from Chute
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 24 04/25/12
Installation
Test Panel TeleBelt is Possible
ASTM C138
Pour from Chute
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 25 04/25/12
Installation
Test Panel
Just a little higher than final grade
ASTM C138
Pour from Chute
Shovel to Location
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 26 04/25/12
Installation
Test Panel
Just a little higher than final grade
ASTM C138
Pour from Chute
Shovel to Location
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 27 04/25/12
Installation
Test Panel
Preferred Device is Hydraulic Powered Roller Screed
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 28 04/25/12
Installation
Test Panel
Preferred Device is Hydraulic Powered Roller Screed
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 29 04/25/12
Installation
Test Panel
Preferred Device is Hydraulic Powered Roller Screed
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Bunyan Roller Screed Hydraulic Pump
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 30 04/25/12
Installation
Test Panel
Smaller Roller Roll Perpendicular Flattens Grade Smoothes Surface
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 31 04/25/12
Installation
Test Panel
Tooled Joints – “Pizza Cutter
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 32 04/25/12
Installation
Test Panel
Tooled Joints – “Pizza Cutter
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 33 04/25/12
Installation
Test Panel
Attractive Tooled Joints
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 34 04/25/12
Installation
Test Panel Wet Down Aggregate Base - Always Mist Over/Around Pour Site - Hot / Windy Days
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Moisture
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 35 04/25/12
Installation
Test Panel
Within 20 min or less Traps Water for Hydration
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Moisture
Visqueen Cover
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 36 04/25/12
Installation
Test Panel
Within 20 min or less Traps Water for Hydration
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Moisture
Visqueen Cover
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 37 04/25/12
Installation
Test Panel
Within 20 min or less Traps Water for Hydration
ASTM C138
Pour from Chute
Shovel to Location
Screed to Grade
Cross Roll
Jointing
Moisture
Visqueen Cover
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 38 04/25/12
Post-Installation
New Section
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 39 04/25/12
Post-Installation
Protect 7 Days Minimum – Cars, Light Trucks 14+ Days - Heavy Trucks - Heavy Traffic Loads
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 40 04/25/12
Post-Installation
Protect Remove Dispose Sweep Off Clean Up
Remove Visqueen
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 41 04/25/12
Post-Installation
Protect Compare to Test Panel Using Core Samples Depth – Not Under 1/4 in. Density - +/- 5% of Test Panel Strength – No Accepted Tests Infiltration – Good Idea Not in ACI 522.1-08
Remove Visqueen
Testing, Acceptance
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 42 04/25/12
Post-Installation
Protect Construction Mess Landscaping Run-Off
Remove Visqueen
Testing, Acceptance
Protect From Debris
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 43 04/25/12
Post-Installation
Protect Protect - This is best Vacuum - This process works best Sweep - Good for rocks - Good for solids Very Site Dependent - Some need little - Some need more
Remove Visqueen
Testing, Acceptance
Protect From Debris
Maintenance
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 44 04/25/12
Post-Installation
Protect
Vacuum – New Products Coming
Remove Visqueen
Testing, Acceptance
Protect From Debris
Maintenance
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 45 04/25/12
Post-Installation
Protect
Vacuum – New Products Coming
Remove Visqueen
Testing, Acceptance
Protect From Debris
Maintenance
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 46 04/25/12
Contact
Michael Bledsoe, President Pervious Concrete, Inc. 206-940-8900 [email protected] www.perviouscrete.com
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 47 04/25/12
The Future
New Section
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 48 04/25/12
The Future
Pervmasters – Las Vegas
Infiltration Rate Test 1701
4 inches depth 16 hours cure 100 degrees
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 49 04/25/12
The Future
Pervmasters – Las Vegas
Presentations To the Group
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 50 04/25/12
The Future
Pervmasters – Las Vegas
Presentations To the Group
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 51 04/25/12
The Future
Pervmasters – Las Vegas
Presentations To the Group
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 52 04/25/12
The Future
Pervmasters – Las Vegas
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 53 04/25/12
The Future
Pervmasters – Las Vegas
Compression Testing (Unapproved)
Inverted Slump Cone Leak Down
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 54 04/25/12
The Future
Pervmasters – Las Vegas
Stone Fracture From Compression Tip of Finger
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 55 04/25/12
The Future
Pervmasters – Las Vegas
Nestor Buen Unna EcoCreto Mexico City
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 56 04/25/12
The Future
Pervmasters – Las Vegas
Mr. Wong – China 1,500,000 sqft In Single Project Olympic Games
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 57 04/25/12
The Future
Pervmasters – Las Vegas
Successful Pervious Concrete Installations WSU LID Technical Workshop
WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 58 04/25/12
Contact
Michael Bledsoe, President Pervious Concrete, Inc. 206-940-8900 [email protected] www.perviouscrete.com