successful pervious concrete installations wsu lid

58
Successful Pervious Concrete Installations WSU LID Technical Workshop WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 1 04/25/12 Presented by: Michael Bledsoe, President Pervious Concrete, Inc.

Upload: others

Post on 10-Jan-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 1 04/25/12

Presented by: Michael Bledsoe, President Pervious Concrete, Inc.

Page 2: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 2 04/25/12

Introduction

Introduction

Page 3: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 3 04/25/12

Introduction

Desired End Result

Page 4: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 4 04/25/12

Introduction

Desired End Result

Page 5: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 5 04/25/12

Introduction

Desired End Result

Play Video

Page 6: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 6 04/25/12

Introduction

Desired End Result

How It Works

Imagine: Bowl of Marbles Glass Vase – Hole in Bottom Super Glue on Marbles Dump Marbles in Vase Super Glue Dries Pour in Water

Page 7: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 7 04/25/12

Introduction

Desired End Result

How It Works

Action / Execution Look over my shoulder Examine Key Steps Tour Some Sites

Page 8: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 8 04/25/12

Introduction

Desired End Result

How It Works

Action / Execution

Central Concept Manage the Marbles Manage the Glue

Page 9: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 9 04/25/12

Pre-Installation

New Section

Page 10: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 10 04/25/12

Pre-Installation

Quality Installer

Page 11: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 11 04/25/12

Pre-Installation

Quality Installer

Experience Prior Success

Page 12: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 12 04/25/12

Pre-Installation

Quality Installer

Specs

Strongly Recommended

Page 13: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 13 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

Critical Success Factor +/- 40% Voids – Aggregate +/- 20% Voids – Finished Concrete Enough water to hydrate +/- .30 w/c Not too much to slide off aggregate Admixtures to improve performance

Page 14: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 14 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

Depth provides Strength ACI 522.1-08 allows only 1/4 in. Error Depth

Page 15: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 15 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

Grade of Aggregate Base is Critical Crushed, not Round - Ruts

Depth

Aggregate Base

Page 16: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 16 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

ACI 522.1-08 - not exceed 20 ft - Larger not > 125% Smaller

Depth

Aggregate Base

Jointing Plan

Page 17: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 17 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

ACI 522.1-08 - 0% below top grade

Depth

Aggregate Base

Jointing Plan

Forming

Page 18: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 18 04/25/12

Pre-Installation

Quality Installer

Specs

Mix Design

Desirable if Installer has success history with mix supplier On site representative Details – Truck wash/out & spin

Depth

Aggregate Base

Jointing Plan

Forming

Mix Teamwork

Page 19: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 19 04/25/12

Installation

New Section

Page 20: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 20 04/25/12

Installation

Test Panel Required by ACI 522.1-08 Protection from BIG Problems Becomes Acceptance Test Standard Site +/- 5% of Test Panel

Page 21: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 21 04/25/12

Installation

Test Panel Measures Plastic Unit Weight +/- 5 lbs / cuft of Design Unit Weight

ASTM C138

Page 22: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 22 04/25/12

Installation

Test Panel Chute Pour is Best - Fastest - Least Time Exposed to Air TeleBelt is Possible Pumping is Not Possible

ASTM C138

Pour from Chute

Page 23: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 23 04/25/12

Installation

Test Panel TeleBelt is Possible

ASTM C138

Pour from Chute

Page 24: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 24 04/25/12

Installation

Test Panel TeleBelt is Possible

ASTM C138

Pour from Chute

Page 25: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 25 04/25/12

Installation

Test Panel

Just a little higher than final grade

ASTM C138

Pour from Chute

Shovel to Location

Page 26: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 26 04/25/12

Installation

Test Panel

Just a little higher than final grade

ASTM C138

Pour from Chute

Shovel to Location

Page 27: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 27 04/25/12

Installation

Test Panel

Preferred Device is Hydraulic Powered Roller Screed

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Page 28: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 28 04/25/12

Installation

Test Panel

Preferred Device is Hydraulic Powered Roller Screed

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Page 29: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 29 04/25/12

Installation

Test Panel

Preferred Device is Hydraulic Powered Roller Screed

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Bunyan Roller Screed Hydraulic Pump

Page 30: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 30 04/25/12

Installation

Test Panel

Smaller Roller Roll Perpendicular Flattens Grade Smoothes Surface

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Page 31: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 31 04/25/12

Installation

Test Panel

Tooled Joints – “Pizza Cutter

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Page 32: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 32 04/25/12

Installation

Test Panel

Tooled Joints – “Pizza Cutter

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Page 33: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 33 04/25/12

Installation

Test Panel

Attractive Tooled Joints

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Page 34: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 34 04/25/12

Installation

Test Panel Wet Down Aggregate Base - Always Mist Over/Around Pour Site - Hot / Windy Days

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Moisture

Page 35: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 35 04/25/12

Installation

Test Panel

Within 20 min or less Traps Water for Hydration

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Moisture

Visqueen Cover

Page 36: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 36 04/25/12

Installation

Test Panel

Within 20 min or less Traps Water for Hydration

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Moisture

Visqueen Cover

Page 37: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 37 04/25/12

Installation

Test Panel

Within 20 min or less Traps Water for Hydration

ASTM C138

Pour from Chute

Shovel to Location

Screed to Grade

Cross Roll

Jointing

Moisture

Visqueen Cover

Page 38: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 38 04/25/12

Post-Installation

New Section

Page 39: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 39 04/25/12

Post-Installation

Protect 7 Days Minimum – Cars, Light Trucks 14+ Days - Heavy Trucks - Heavy Traffic Loads

Page 40: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 40 04/25/12

Post-Installation

Protect Remove Dispose Sweep Off Clean Up

Remove Visqueen

Page 41: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 41 04/25/12

Post-Installation

Protect Compare to Test Panel Using Core Samples Depth – Not Under 1/4 in. Density - +/- 5% of Test Panel Strength – No Accepted Tests Infiltration – Good Idea Not in ACI 522.1-08

Remove Visqueen

Testing, Acceptance

Page 42: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 42 04/25/12

Post-Installation

Protect Construction Mess Landscaping Run-Off

Remove Visqueen

Testing, Acceptance

Protect From Debris

Page 43: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 43 04/25/12

Post-Installation

Protect Protect - This is best Vacuum - This process works best Sweep - Good for rocks - Good for solids Very Site Dependent - Some need little - Some need more

Remove Visqueen

Testing, Acceptance

Protect From Debris

Maintenance

Page 44: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 44 04/25/12

Post-Installation

Protect

Vacuum – New Products Coming

Remove Visqueen

Testing, Acceptance

Protect From Debris

Maintenance

Page 45: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 45 04/25/12

Post-Installation

Protect

Vacuum – New Products Coming

Remove Visqueen

Testing, Acceptance

Protect From Debris

Maintenance

Page 46: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 46 04/25/12

Contact

Michael Bledsoe, President Pervious Concrete, Inc. 206-940-8900 [email protected] www.perviouscrete.com

Page 47: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 47 04/25/12

The Future

New Section

Page 48: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 48 04/25/12

The Future

Pervmasters – Las Vegas

Infiltration Rate Test 1701

Page 49: Successful Pervious Concrete Installations WSU LID

4 inches depth 16 hours cure 100 degrees

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 49 04/25/12

The Future

Pervmasters – Las Vegas

Page 50: Successful Pervious Concrete Installations WSU LID

Presentations To the Group

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 50 04/25/12

The Future

Pervmasters – Las Vegas

Page 51: Successful Pervious Concrete Installations WSU LID

Presentations To the Group

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 51 04/25/12

The Future

Pervmasters – Las Vegas

Page 52: Successful Pervious Concrete Installations WSU LID

Presentations To the Group

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 52 04/25/12

The Future

Pervmasters – Las Vegas

Page 53: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 53 04/25/12

The Future

Pervmasters – Las Vegas

Compression Testing (Unapproved)

Page 54: Successful Pervious Concrete Installations WSU LID

Inverted Slump Cone Leak Down

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 54 04/25/12

The Future

Pervmasters – Las Vegas

Page 55: Successful Pervious Concrete Installations WSU LID

Stone Fracture From Compression Tip of Finger

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 55 04/25/12

The Future

Pervmasters – Las Vegas

Page 56: Successful Pervious Concrete Installations WSU LID

Nestor Buen Unna EcoCreto Mexico City

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 56 04/25/12

The Future

Pervmasters – Las Vegas

Page 57: Successful Pervious Concrete Installations WSU LID

Mr. Wong – China 1,500,000 sqft In Single Project Olympic Games

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 57 04/25/12

The Future

Pervmasters – Las Vegas

Page 58: Successful Pervious Concrete Installations WSU LID

Successful Pervious Concrete Installations WSU LID Technical Workshop

WSU LID Technical Workshop - Presented by Michael Bledsoe - www.perviouscrete.com 58 04/25/12

Contact

Michael Bledsoe, President Pervious Concrete, Inc. 206-940-8900 [email protected] www.perviouscrete.com