successful partnerships in innovative project delivery · city of el paso • camino real regional...

34
Successful Partnerships in Innovative Project Delivery

Upload: others

Post on 12-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

Successful Partnerships in Innovative Project

Delivery

Page 2: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

Eddie Valtier – Director of Transportation Planning and Development (El Paso District)

Ismael Hernandez – ROW Supervisor, West ROW Project Delivery – ROW Division (El Paso)

Oscar Hurtado – Statewide Utility / Project Manager (SPD Austin)

Sergio Garcia – Public Private Partnership (PPP) Project Manager (SPD South Central - El Paso)

2

Introductions

Page 3: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

Table of Contents

3

BHW Video

Project Description

Roles and Responsibilities

ROW Division

Teamwork – What’s Working?

Lessons Learned

Possible Solutions for Project Management

1

2

3

4

5

6

7

Page 4: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

On August 22, 2014, TxDOT officials executed a design-build agreement with Abrams-Kiewit, JV for the design, construction and comprehensive maintenance of the Loop 375 Border Highway West Extension Project in El Paso, Texas.

Loop 375 - Border Highway West Extension

Page 6: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

6

&

Page 7: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

7

Page 8: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

8

Page 9: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

Project Challenges - Eddie

Project History Historic Properties, Structures and Districts American and Franklin Canal Systems Hazardous Materials Sites Railroads and Rail Yards UPRR BNSF

U.S. Border Security International Boundary and Water Commission Right of Way

Page 10: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

10

ROW Division – Project Coordination - Ismael

Preliminary Project Work

Schematic Review Securing ROW CSJ Project Set up in ROWIS

Project is released for full acquisition 1/2/14 ; SPD assumes ROW activities

• ROW Map • Local Funding Agreement • Parcel Acquisitions

Spur 1966 – ROW Division Acquires ROW needed for BHW

Page 11: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

11

SS 1966 – Parcel 3

Page 12: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

12

BHW and SS 1966

Page 13: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

PROJECT STAKEHOLDERS ON BHW – Sergio Garcia • City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC) • U.S. Customs and Border Protection (CBP) • Railroads Union Pacific Railroad (UPRR) Burlington Northern Santa Fe (BNSF)

• ASARCO Trustee • Utilities El Paso Electric Company (EPEC) El Paso Water Utilities (EPWU)

13

Page 14: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

• Early coordination • City Participation • Central Business District

Coordination • Concurrence on Improvements

14

Page 15: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

15

I’m levitating!

Page 16: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

16

Page 17: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

17

•Oversight of toll infrastructure during construction

•Provide the System Integrator

•Toll Operator

Page 18: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

18

Early Coordination Adjacent to Rio Grande

River 100-year flood plain Transportation Easement

inside IBWC ROW Obtained project

approval from IBWC One-on-one meetings

with Proposers Incorporated IBWC

requirements in DA

Page 19: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

19

Early Coordination Relocation of Surveillance

Equipment 3 Towers 12 Cameras 39 Illumination Poles

Communication of Utilities Informal “Rules of

Engagement” One-on-one meetings with

Proposers Incorporated CBP

requirements in DA

Page 20: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

20

Page 21: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

21

Page 22: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

• Railroads: UPRR & BNSF

• 2+ miles of track relocation • Early Coordination • Executed Agreements

• Identified scope of work responsibilities: – Developer, TxDOT and Railroads

• ROW Exchanges • 60% Railroad Relocation Plans

• One-on-one meetings with Proposers • Incorporated RR requirements into DA

22

Page 23: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

23

Page 24: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

24

Page 25: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

25

American Smelting and Refining Company (ASARCO) Operated in El Paso from 1887 to 1999 Smelted lead, copper and zinc ore Waste Product: Slag Site Remediation by Trustee BHW ROW Approx. 6 acres One-on-one meetings with Proposers Site Visits

Page 26: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

26

Page 27: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

27

Utilities El Paso Electric Company (EPEC) Transmission Relocation Early Coordination to Prioritize and Phase

Page 28: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

28

Utilities

El Paso Water Utilities (EPWU) Storm Water Management Provided approval for drainage

Subsurface Utility Engineering (SUE) 2 Utility Meetings One-on-one Meetings with Proposers

Page 29: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

29

What’s Working?

Page 30: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

30

Maximum utilization of consultants assigned to assist TxDOT in overseeing projects

Projects should be set up with a

universal naming convention for document control

Communication (Internal & External) Early in the project Consistent among all projects Continued throughout

Page 31: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

31

Schedule – Set and Met by all team members and stakeholders

Electronic review and approval to increase time and efficiency including electronic signatures

Continue to improve existing policies and procedures by applying lessons learned

Page 32: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

32

Possible Solutions for Project Management

Password Controlled / Approval Data Storage and Retrieval for all Project Related members to check-in / check-out data (Spreadsheets, PDF Files, mapping data, legal documents, etc.)

Programmatic Documentation

Standardized template form(s) to

use for each new project for in the pre-procurement stages, currently underway at present time

ROWIS – Right of Way Information System

TxDOT’s ROW Acquisition Data Storage,

Tracking and Retrieval Software Application

TxDOT’s Inventory with all Projects

Included User Access Required UIR System Internet-based Utility Permit Tracking

Application for Receiving, Reviewing & Approving Utility Adjustments

Page 33: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

33

Possible Solutions for Project Management

Central repository providing flexibility Configurable and customizable Automatic reporting, standardized

operations, easy to use interface for organization

Utilize GIS, mobile and automation to

accelerate projects User Defined Fields with Document

and Form Creation Licensing and Implementation

Page 34: Successful Partnerships in Innovative Project Delivery · City of El Paso • Camino Real Regional Mobility Authority (CRRMA) • International Boundary and Water Commission (IBWC)

34