42G07SW2001 2.18530 CARGILL 010 REPORT ON THE CARGILL TOWNSHIP PROPERTY CARGILL TOWNSHIP PORCUPINE MINING DIVISION, ONTARIO OVERBURDEN STRIPPING/GEOLOGICAL MAPPING PROGRAM for LEO ALARIE and SONS Limited. Submitted by: R.J. Meikle Geophysical Engineering S Surveys Inc. May, 1998

Upload: others

Post on 20-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • 42G07SW2001 2.18530 CARGILL 010

    REPORT ON THE CARGILL TOWNSHIP PROPERTY

    CARGILL TOWNSHIP

    PORCUPINE MINING DIVISION, ONTARIO

    OVERBURDEN STRIPPING/GEOLOGICAL MAPPING PROGRAM

    for

    LEO ALARIE and SONS Limited.

    Submitted by: R.J. MeikleGeophysical Engineering S Surveys Inc. May, 1998

  • TABLE OF CONTENTS

    CONTENTS PAGE NO.

    INTRODUCTION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . lLOCATION AND ACCESS........................... 2CLAIM STATUS.................................. 2PERSONNEL..................................... 3PREVIOUS WORK................................. 3GENERAL GEOLOGY............................... 3WORK PROGRAM ................................. 4CONCLUSIONS AND RECOMMENDATIONS............... 5CERTIFICATE. . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . 6

    LIST OF FIGURES

    LOCATION MAP . . . . . . . . . . . . . . . . . . . . . . . . . . FIG. lREGIONAL LOCATION MAP.................. FIG.2CLAIM SKETCH MAP.... . . . . . . . . . . . . . . . . . . . . FIG.3GEOLOGY MAP............................ FIG.4

    MAPS

    PHASE l PLAN MAP AND SECTIONS.......... MAP lPHASE 2 GEOLOGICAL PLAN S SAMPLE LOCATIONS.MAP 2

    APPENDIX

    APPENDIX "A"-COST BREAKDOWN-OVERBURDEN TEST HOLES- PHASE ONE

    APPENDIX "B"-COST BREAKDOWN-LEO ALARIE and SONS LTD,- PHASE TWO

    APPENDIX "C"-GEOPHYSICAL ENGINEERING S SURVEYS INC.- COST BREAKDOWN, PHASE TWO

    42G07SW2001 2.18530 CARGILL 010C

  • INTRODUCTION

    This report deals with the logistics and results of an overburden stripping and geological mapping program carried out on the "Cargill Township Property", Cargill Township, Porcupine Mining Division, Ontario.

    The "Cargill Township Property", is comprised of a 16 unit, unpatented block mining claim, #1224136, recorded in the name of Leo Alarie and Sons Limited., Timmins, Ontario. The mechanical stripping was carried out by Leo Alarie S Sons Ltd., under supervision of Fudge S Associates, North Bay, Ontario, who contracted Geophysical Engineering s Surveys Inc., Timmins, Ontario, to do a geological assessment/mapping survey of the exposed outcrop-area.

    The purpose of the program was to determine the overburden thickness and geology of a specific area of higher elevation within the above mining claim. Initially, the program was to determine the suitability of the rock for aggregate purposes. A recent release of O.G.S. information indicates the general area to be highly prospective for both diamond exploration and base metal exploration and the potential of the exposed bedrock geology was subsequently explored for this as well.

  • LOCATION AND ACCESS

    The "Cargill Township Property" is located in the central part of Cargill Township, approximately 30km southwest of the town of Kapuskasing, Ontario (figs. 1,2) .

    The property is easily accessed by travelling 6km west of Kapuskasing on Hwy. lin, then south on the secondary gravelled Cargill Road and turning west on the Ecclestone Road for 4.5km at which point an access trail leads south approximately 600 meters to the stripped area (fig.2).

    CLAIM STATUS

    The property is comprised of l unpatented, 256 Hectare, 16 unit block mining claim, #1224136, in the central part of Cargill Township, Porcupine Mining Division, Ontario. The claim is recorded I00% in the name of Leo Alarie and Sons Limited., P.O. Box 912, Highway 101 west, Timmins, Ontario, P4N 7H1 (fig.3).

  • 85 80 73

    •33

    -50

    •43

    PROVINCE OF ONTAR10

    FIG X

    LEO ALARIE AND SONSProoariu: CARGILL PROPERTY

    Title:

    LOCATION MAP

    RJM1 MAY/98•'ONT '42G/SE

    SPA

  • LOCTION

    CARGILL

    •t.J*t_ i...

    REGIONALLOCATION MAPCARGILL PROP

    1:100,000FIGURE #2

  • CLAIM SKETCH CARGILL TWP

    1:50,000 FIGURE #3

  • tOW Eft TO UPPER DEVONrAN

    PROPE ***E X LOCATI

  • PERSONNEL

    The following personnel were directly involved with the Stripping and Geological Mapping program:

    R.J. Meikle Timmins, OntarioHerve Blais Timmins, OntarioMarcel Cheff Timmins, OntarioBob Loranger Kapuskasing, OntarioDon Fudge North Bay, Ontario

    PREVIOUS WORK

    There is no apparent previous mining exploration work recorded on the property.

    GENERAL GEOLOGY

    O.G.S. Map No. 2166, Hearst-Kapuskasing Sheet, Geological Compilation Sheet, shows the claim to be underlain by Archean age Hybrid Granitic Gneiss. This map does not show any outcrop within the claim but the current stripping program correlates with Map No. 2166

  • WORK PROGRAM

    A two phase program was carried out on part of mining claim #1224136, Cargill Township. Phase One consisted of 15 backhoe test holes along 3 sections, to determine the depth of overburden and subsequently the feasibility of stripping the area to facilitate geological mapping and possible future rock excavation for aggregate purposes and or economic mineral potential. A local backhoe and operator (Bob Lorenger), was contracted for a total of 4.5 hrs. under the supervision of Mr. Don Fudge, (appendix 'A'). The results of Phase One are shown in plan and profile form (MAP I), this report.

    Phase Two consisted of constructing an access trail south from the Ecclestone Road, and stripping an area approximately VOmXllOm (7,700 sq. meters). The stripped area resulted in virtually 100% exposed bedrock upon completion. A drainage trench had to be excavated to drain standing water from the northwest part of the stripped area northward to the elevation of the swamp area. A total of 5 bedrock samples were taken in the stripped area. A north-south baseline was compassed and chained across the stripped area to provide control for the mapping and sampling. The results are shown in plan form (MAP 2), this report. All of the samples appeared to be of the same rock type, a highly metamorphosed granitic gneiss. All of the stripping and trenching was carried out in the central part of mining claim #1224136.

  • CONCLUSIONS AND RECOMMENDATIONS

    Results of the stripping/geological mapping program, subject of this report indicate a favourable situation for possible future bedrock excavation for aggregate purposes. Crushing and analytical testing should be conducted to determine the suitability of the rock for commercial aggregate.

    The bedrock geology of the limited stripped is interpreted to be a granitic gneiss and is not considered favourable for mineral and or diamond potential at this time. However, only a small portion of the claim was mapped and it is recommended that the remainder be mapped and or prospected with follow-up stripping/trenching if~warranted.

  • CERTIFICATION

    I, Raymond Joseph Meikle of Timmins, Ontario hereby certify that:

    1. I hold a three year Technologist Diploma from the Haileybury School of Mines, Haileybury, Ontario, obtained in May 1975.

    2. I have been practising my profession since 1973 in Ontario, Quebec, Nova Scotia, New Brunswick, Newfoundland, NWT, Manitoba, Germany and Chile.

    3. I have been employed directly with Teck Corporation, Metallgessellschaft Canada Ltd. Sabina Industries, R.S. Middleton Exploration Services Ltd., self employed 1979-1997 (Rayan Exploration Ltd.) and currently with Geophysical Engineering S Surveys Inc.

    4. I have based conclusions and recommendations contained in this report on knowledge of the area, my previous experience and on the results of the field work conducted on the property May 1998.

    5. I hold no interest, directly or indirectly in this property, nor do I expect to receive any interest or considerations from the property, other than for professional fees rendered.

    Dated this 25th day of May, 1998 at Timmins, Ontario.

  • APPENDIX ' A'

    Overburden Test Holes PHASE ONE

    D.T. Fudge - l day supervision on site........ $ 400.00

    Lachance Lumber - ............ . . . . .. . . . . . . . . . . $ 802.50

    Total $1202.50

  • uo. i m i r i

    Bois A. LACHANCE LUMBER LTD.CP../.P.O.BOX3 * HARTY, ONTARIO POL1MO * Tel. 705-335-3066 * FAX 705-335-3066

    No 9oft do oodvwndK

  • APPENDIX 'B

    Cost Breakdown - LEO ALARIE and SONS LimitedPHASE TWO

  • Leo Alarie and Sons LimitedGeneral Contractors

    Head office: P.O. Pox 912 Highway 101 West Tiwnww, CN NW 7H1 fciooe: (705) 268-2106

    Fax (70S) 2(8-3571

    P.O. BOK 130 Highway 11 fethMon, CM POK 1NO Phono (705) 273-2O6

    LCL concracclna Div.Leo Alarie i Sons Led P.O. Boot 1660 Timnins, CM P4M Tws Pboo* (70S) 267-4020

    tration Fax 268-2511 Fax (705) 273-2803 Fix (705) 264-0873

    Stripping Rock - Mining Cblm #1224136 Kapuskasing Aceeaa Trail a. Meehanloal Stripping

    Date

    5/6/985/7/08

    5/8/98

    5/11/98

    5/12/96

    5/13/98

    5/14/98

    5/15/98

    Operator

    Herve StateHarve BlaisHerve BlaisMarcel CheffHerve BtofeMarcel CheffHerve BlaisMarcel CheffHerve BlaisMarcel CheffMarcel CheffHerve BlaisMarcel CheffHerve BlaisMarcel CheffHerve BlaisMarcel Cheff

    Hours WorkedBackhoe Operator

    6.55.0

    9.0

    12,0

    11.5

    3.0

    11.5

    11.5

    7.0

    Dozer Operator

    6.5

    11.5

    11.5

    3.0

    8.511.5

    11.5

    7.0

    Rate

    S 77.00S 77.00S 112.00S 77.00S 112.00S 77.00S 112.00S 77.00S 112.00S 77.00S 112.00S 112.00S 77.00S 112.00S 77.00S 112.00S 77.00

    Total Cost*

    S 500.50S 385.00S 728.00S 693.00S 1,288.00S 924.00S 1 .288.00S 885.50S 336.00S 231 .00S 952.00S 1,288.00S 885.50S 1 .288.00S 885.50S 784.00S 539.00

    Total Equipment Cotte 13.881.00

    6/6/98 Herve Blais Surveying 3.0

    Total Surveying Costa

    33.00 S 99.00

    99.00

  • Leo Alarie and Sons LimitedGeneral Contractor*

    Bead Office; P.O. Box 912 P.O. Box 130 LCL ContractingBigt**y 101 West Higbnay 11 Div.Uo Alari* t Sons LtdTinnina, CH P4N 7B1 Matheson, ON P.O. Box 1660FOCDt! (705) 268-2106 POK IMO ttaitdna. ON P4N 7W8Operation Fax (705) 268-3571 Phonal705) 273-2436 Phone (70S) 267-4020Administration Fax 266-2541 Fax (705) 273-2803 Fax (70S) 264-0673

    Stripping Rock - Mining Claim *1224136 Kapuskasing Transportation Costs

    J2iit Description

    5/5/98 Mobilization A Demobilization - Backhoe

    5/7/98 Mobilization A DemotoiHzation - Dozer

    Amount

    S 1,120.00

    S 1.200.00

    Backhoe Operator Travel 8 days 9 Z hre/day O S33.50

    Bulldozer Operator Travel A Pick-up #56878 days O 2 hrs/day 0 538.60

    536.00

    617.60

    Total Transportation Costs S 3.478.60

    Food 4 Lodging

    5/6/98 Room and Board - Herve Blais ft Marcel Cheff 8 days X 2 men O STS/day 1.200.00

    Costs (Before Tax)

    rr; Q.S.T.

    Total Costs (Claim #1224136)

    f 18,653.60

    t 1.305.75

    S_19.9S9.3S

  • APPENDIX

    Cost Breakdown

    Geophysical Engineering fi Surveys IncPHASE TWO

  • GEOPHYSICAL ENGINEERING S SURVEYS INC.170 Second Avenue

    P. O. Box 15Timmins, Ontario

    P4N 7C5

    #875761264 RT PHONE: (705) 268-4866 FAX:(705) 360-7733

    MAY 26, 1998JOB #G37INV. #49-G37-l

    En Account With: FUDGE & ASSOCIATES 160 BRYAN ROAD NORTH BAY, ONTARIO PIC 1C2

    Invoice RE: CARGILL TOWWNSHIP PROPERTY CLAIM #1224136

    At a Rate of:

    GEOLOGICAL MAPPING S STRIPPING:

    Ray Meikle - l day @ $350.00/day

    TRUCK/GAS RENTAL:

    l DAY @ $80.0O/day.............. .

    REPORT S PLOTTING:

    350.00

    80.00

    450.00

    Sub-total

    GST

    TOTAL AMOUNT DUE

    880.00

    61.60

  • x^ . .Ontario Ministry of

    42G07SW2001 2.18530 CARGILL

    Declaration of Assessment Work Performed on Mining LandMining Act. Subnotion 08(2) and M(3), R.8.0.1990

    ithorlty of subsections 65(2) and 66(3) of the Mining Act. Under section 8 of the used to review (he assessment work and correspond with the mining land holder. Mining Recorder. Ministry of Northern Development and Mines, 6th Floor,

    900

    Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print in ink.

    1 . Recorded holder(s) (Attach a list If necessary)ft

    /Ic^iClient N

    AddresYe-

    telephone Number

    /ff J "" ^ Fax Number

    to. 80*y f frVi frVl tV ^ ,

    Name

    Address

    Client Number

    Telephone Number

    Fax Number

    2. Type of work performed: Check ( s ) and report on only ONE of the following groups for this declaration.

    rr/Geotechnlcal: prospecting, surveys, r— i Physical: drilling, stripping, j— i Rehabilitation Lk-J assays and work under section 18 (regs) l — ' trenching and associated assays ' — 'Work Type ~

    sxsr *™ Q\O^ ^Global Positioning System Data (If available)

    r Dfy j Month | Ywtownehlp/Area

    C q^q 1 1 f l^n/)M or Q-Plan Mimber f

    Office UseCommodity

    Total S Value of ft O, f , Work Claimed ^ y W

    NTS Reference

    Mining Division jAl/ij-e.f*'

    Resident Geologist --f yDistrict /!rt^tt*^

    Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

    3. Person or companies who prepared the technical report (Attach a list If necessary)Name f\ A 1 i

    Address ' J _ , ,.

    Name

    Address

    Name

    Address

    RECEIVE;,J^AY v n wtwf l '.BO (JH&

    (iFOSCIENCE ASSESSMCW 1nFFICF

    Telephone Number

    Fax Number

    lo f -36Telephone Number

    !ax Numberc? y y /X Cx — ̂ 7 /5? ̂ -3 tt?

    ^ -7733

    elephone Number

    iFax Number

    4. Certification by Recorded Holder or Agent

    /L/ /- ______ , do hereby certify that l have personal knowledge of the facts set(Prim Name) iff r aforth in this Declaration of Assessment Work having caused the work to be performed or witnessed the same during or after Its completion and, to the best of my knowledge, the annexed report is true. ___^—^ j/ __ X ———--—————.Signature of Ri

    Telephone Number Fax Number

    OZ4t (OB96)

  • Ontario Ministry ofNorthern Developmentand Mlnea Statement of Costs for Assessment CreditTransaction Number (office uee)

    PeraonaJ Information collected on thla form la obtained under the authority of subsection 6(1) of the Assessment Work Regulation 4/90. Under section 8 of the Mining Act, the Information la a pubtic record. Thla Information will be uaed to review the assessment work and correspond with the mining land holder. Questions about thla collection should be directed to the Chief Mining Recorder, Mlnlatry of Northern Development and Mlnea, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E BBS.

    " A

    Work Type

    ir- GG'S^ ',df) 1 /l oy?pl u-7

    ^/.4*-rmo' 1 '

    Units of WorkDepending on the type of work, list the number of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, elc.

    t d&t-jS

    t

    Associated Costs (e.g. supplies, mobilization and demobilization).

    -

    Transportation Costs

    Food and Lodging Costa

    Dr-^CJV/p

    Cost Per Unit of work

    v*?/Vfo

    :n1 '""'ftrfallr'alue oT Asse jsment Work

    MAY 2 4 1998n:3664

    Calculations of Filing Discounts: GEOSCfENCE ASSESSMENT OFFIQF

    Total Coil

    Y?/t-/ So

    '

    W f

    1. Work filed within two years of performance Is claimed at 10046 of the above Total Value of Assessment Work.2. If work is filed after two years and up to five years after performance, It can only be claimed at 50^ of the Total

    Value of Assessment Work. If this situation applies to your claims, use the calculation below:Total $ value of worked claimed.TOTAL VALUE OF ASSESSMENT WORK x 0.50 -

    Note:- Work older than 5 years Is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a request for verification and/or correction/clarification. If verification and/or correction/clarification Is not made, the Minister may reject all or part of the assessment work submitted:

    Certification verifying costs:

    l, hereby certify, that the amounts shown are as accurate as may————(ptoaM print full name)

    reasonably be determined and the costs were Incurred while conducting assessment work on the lands Indicated on

    the accompanying Declaration of Work form as

    to make this certification.(recorded holder, agent, or stale company position with signing authority)

    am authorized

    mn pore)

  • .. w ... ^ uc ,ci,u.ueu anu uismouteu. woik can only be assigned lo udinis that are contiguous (adjoining; to the mining land where work was performed, at the time work was performed. A map showing Ihtf conflguous link must accompany this form.

    1 ' U J /(A———.——————— ——— — ——— — — —— p

    Mining Claim Number. Or If work was done on other eligible mining land, show In this column the location number Indicated on the claim map.

    eg

    eg

    eg

    1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    TB 7827

    1234567

    1234568

    7^2^/3^

    Number of Claim Units. For other mining land, list hectares.

    16 ha

    12

    2

    /^

    Column Totals

    Value of work performed on this claim or other mining land.

    S26. 825

    0

    S 8, 892

    ?y/ '

    1

    9W

    Value of work applied lo this claim.

    N/A

    S24.000

    S 4,000

    Value of work assigned to other mining claims.

    124,000

    0

    0

    rCT'Ctfi/tKCTBank. Value of wo to be distributed at a future date.

    12,825

    0

    14,892

    ^(

    -

    ' i

    if rl, , do hereby certify that the above work credits are eligible under

    (Print Full Name)

    subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to

    the claim where the was done.Signature of RecdrdedHgJZWr or Agent Ayjjiorlzed In Writing Date

    6. Instructions for cutting back credits that are not approved.

    Some of the credits claimed in this declaration may be cut back. Please check ( ^ ) in the boxes below to show howyou wish to prioritize the deletion of credits:

    OK 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated. O 2. Credits are to be cut back starting with the claims listed last, working backwards; or O 3. Credits are to be cut back equally over all claims listed In this declaration; or Q 4. Credits are to be ci Uback asjanorilized on the attached appendix or as follows (describe):

    Note: If you have not Indicated how y Jonere*HtsJ8Fi' followed by option number 2 if necessary.

    credits will be cut back from the Bank first,

    For Office Use OnlyReceivad Stamp——————

    Deemed Approved Dale

    Date Approved

    Dale Notification Sent

    Total Value of Cradll Approved

    Approved lor Recording by Mining Recorder (Signature)

  • Ontario vi ltai IW and Mine.Declaration of Assessment Work Performed on Mining LandMining Act, Subsection 88(2) and 88(3), R.8.O. 1t80

    Personal Information collected on this form Is obtained under the authority of subsections 85(2) and 68(3) of the Mining Act. Under section 8 of the Mining Act, the Information Is a public record. This Information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection should be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 8th Floor, 933 Ramaey Lake Road, Sudbury, Ontario, P3E 6B5.

    Instructions: - For work performed on Crown Lands before recording a claim, use form 0240. - Please type or print In ink.

    1. Recorded holder(s) (Attach a list If necessary)Name 1 ^ . . '-Jtlb r ̂ .ClVilQ Cvvi0( OO\A^ L, XWH-TO-CA

    l.f)- MD'tf 1 IsfoC}. i

    1 l bv\. n^i i u-s fA" T ' * ~" ^^ c?Name *-"

    Address

    Client Number

    Telephone Number1oS-U~)Fax Number

    JO l C^ 7Client Number

    Telephone Number

    Fax Number

    '-i /o

    - Ho-zo~c#73

    2. Type of work performed: Check ( ^ ) and report on only ONE of the following groups for this declaration.

    D Geotechnical: prospecting, surveys, rrj/Physical: drilling, stripping, l — l assays and work under section 18 (regs) L^-1 trenching and associated assays ' — 'Work Type

    Wjk. 1 i J a. .Hi y— juvy i wonwi T wGlobal Positioning System Data (If available)

    ** iv TO VJ \of\ZP iTownship/ Area

    Cave i tt 7^M or G-PM Number ||

    Rehabilitation

    Office UseCommodity

    T PTotal S Value of US? ^, Work Claimed ~ffb?J-*-fri :

    j NTS Reference

    /, /6/^s.^

    Mining Division f^if^f^^ju

    Resident Geologist -^fyDistrict f //?t--^H-^-*^j,

    Please remember to: - obtain a work permit from the Ministry of Natural Resources as required;- provide proper notice to surface rights holders before starting work;- complete and attach a Statement of Costs, form 0212;- provide a map showing contiguous mining lands that are linked for assigning work;- include two copies of your technical report.

    3. Person or companies who prepared the technical report (Attach a list if necessary)

    4. Certification by Recorded Holder or Agent

    l, , do hereby certify that l have personal knowledge of the facts set(Print Name)

    forth In this Declaration of Assessment Work having caused the work to be performed or witnessed the same during oraftex-lts cornpttfion and, tolhe best of my knowledge, the annexed report is true.

    0241 (02/96)

  • o. HOIK io ue lecoiueu ana uismuuieu. the mining land where work was performed, .must accompany this form.

    VVOIK can oniy ue assigned lo uamis tnat are contiguous (adjoining; to at the time work was performed. A map showing the contiguous link

    Mining Claim Number. Or If work was done on other eligible mining land, show In this column the location number Indicated on the claim map.

    eg

    eg

    eg1

    2

    3

    4

    5

    6

    7

    8

    9

    10

    11

    12

    13

    14

    15

    TB 7827

    1234567

    1234568

    tUt/fa-

    Number of Claim Units. For other mining land, list hectares.

    16 ha

    12

    2

    (l.

    Column Totals

    Value of work performed on this claim or other mining land.

    S26, 825

    0

    S 8, 892

    21 ac

    t

    2d6 (

    Value of work applied to this claim.

    N/A

    S24.000

    S 4,000

    (X W

    V

    ^oo

    Value of work assigned to other mining claims.

    S24,000

    0

    0

    '

    Bank. Value of wor to be distributed at a future date.

    S2.825

    0

    14,892

    me i

    1

    Mill, a AS , do hereby certify that the above work credits are eligible undei

    (Print Full Name)

    subsection 7 (1) of the Assessment Work Regulation 6/96 for assignment to contiguous claims or for application to where 0*p work was dpne.

    t Authorized In Writing Date

    6. Instructions for cutting back credits that are not approved.

    Some of the credits claimed in this declaration may be cut back. Please check ( ^ ) in the boxes below to show howyou wish to prioritize the deletion of credits:

    [0 1. Credits are to be cut back from the Bank first, followed by option 2 or 3 or 4 as indicated. Q 2. Credits are to be cut back starting with the claims listed last, working backwards; or D 3. Credits are to be cut back equally over all claims listed in this declaration; or

    O 4. Credits are to be cut back as prioritized on the attached appendix or as follows (describe):

    Note: If you have not indicated how your credits are to be deleted, credits will be cut back from the Bank first, followed by option number 2 if necessary.

    For Office Use OnlyReceived Stamp

    RECEIVED

    GEOSCiENCEASSESSMEN

    1 eemed Approved Dale

    )ale Approved

    Dale Notification Sent

    Total Value of Credit Approved

    Approved lor Recording by Mining Recorder (Signature)

  • Ontario Ministry ofNorthern Developmentand Mlnea Statement of Costs for Assessment CreditTransaction Number (office use)

    Personal Information collected on this form Is obtained under the authority of subsection 6(1) of the Assessment Work Regulation 4/86. Under section B of the Mining Act, the Information Is a public record. This Information will be used to review the assessment work and correspond with the mining land holder. Questions about this collection ahould be directed to the Chief Mining Recorder, Ministry of Northern Development and Mines, 6th Floor, 933 Ramsey Lake Road, Sudbury, Ontario, P3E BBS.

    Work Type

    ^ " ^ ifyfD i^vc,———— |^ ———————————

    '

    Units of WorkDepending on the type of work, list the ngmber of hours/days worked, metres of drilling, kilo metres of grid line, number of samples, etc.

    7 clotc/C'

    Associated Costs (e.g. supplies, mobilization and demobilization).

    -

    Transportation Costs

    Food and Lodging Costs

    RFPriWP 1^i iLL/L.1 V t:

    Cost Per Unit of work

    L'Ti ital Value of Assessment Work

    Total Cost

    f f yfltQ

    O cyr\ -2

    /2.O&

    ^ ( , ((O 1

    MAY. 2 9 1998Calculations of Filing Dlscou flfcOSCIENCE ASSESSMENT

    OFFICF1. Work filed within two years of performance Is claimed at 100"**) of the above Total Value of Assessment Work.2. If work Is filed after two years and up to five years after performance, It can only be claimed at 5n(ft of the Total

    Value of Assessment Work. If this situation applies to your claims, use the calculation below:TOTAL VALUE OF ASSESSMENT WORK x 0.50 Total 9 value of worked claimed.

    Note:- Work older than S years is not eligible for credit.- A recorded holder may be required to verify expenditures claimed in this statement of costs within 45 days of a . request for verification and/or correction/clarification. If verification and/or correction/clarification Is not made, the Minister may reject all or part of the assessment wor!: .rubrr.itted.

    Certification verifying costs:

    l. ^^ /l/ _____ , do hereby certify, that the amounts shown are as accurate as may(please print lull name)

    reasonably be determined and the costs were incurred while conducting assessment work on the lands Indicated on

    the accompanying Declaration of Work form as

    to make this certification.

    /l 6^ 7(recorded holder, agent, or stale company position with signing authority)

    am authorized

    0212 (Q2r96)

    Data

    2//a i

  • Ministry ofNorthern Developmentand Mines

    Ministers du Developpement du Nord et des Mines

    September 9, 1998

    LEO ALARIE AND SONS LIMITED BOX 1660 TIMMINS, Ontario P4N-7W8

    Dear Sir or Madam:

    Subject: Transaction Number(s):

    OntarioGeoscience Assessment Office 933 Ramsey Lake Road 6th Floor Sudbury, Ontario P3E 6B5

    Telephone: (888)415-9846 Fax: (877)670-1555

    Visit our website at: www.gov.on.ca/MNDM/MINES/LANDS/mlsmnpge.htm

    Submission Number: 2.18530

    StatusW9860.00568 Deemed Approval W9860.00569 Deemed Approval

    We have reviewed your Assessment Work submission with the above noted Transaction Number(s). The attached summary page(s) indicate the results of the review. WE RECOMMEND YOU READ THIS SUMMARY FOR THE DETAILS PERTAINING TO YOUR ASSESSMENT WORK.

    If the status for a transaction is a 45 Day Notice, the summary will outline the reasons for the notice, and any steps you can take to remedy deficiencies. The 90-day deemed approval provision, subsection 6(7) of the Assessment Work Regulation, will no longer be in effect for assessment work which has received a 45 Day Notice. Allowable changes to your credit distribution can be made by contacting the Geoscience Assessment Office within this 45 Day period, otherwise assessment credit will be cut back and distributed as outlined in Section #6 of the Declaration of Assessment work form.

    Please note any revisions must be submitted in DUPLICATE to the Geoscience Assessment Office, by the response date on the summary.

    If you have any questions regarding this correspondence, please contact Lucille Jerome by e-mail at [email protected] or by telephone at (705) 670-5858.

    Yours sincerely,

    ORIGINAL SIGNED BYBlair KiteSupervisor, Geoscience Assessment OfficeMining Lands Section

    Correspondence ID: 12757

    Copy for: Assessment Library

  • Work Report Assessment Results

    Submission Number: 2.18530

    Date Correspondence Sent: September 09, 1998 Assessor: Lucille Jerome

    Transaction Number

    W9860.00568

    Section:12 Geological GEOL

    First Claim Number

    1224136

    Township(s) l Area(s) CARGILL

    Status

    Deemed Approval

    Approval Date

    August 27, 1998

    Transaction Number

    W9860.00569

    Section:10 Physical PSTRIP

    First Claim Number

    1224136

    Township(s) l Area(s) CARGILL

    Status

    Deemed Approval

    Approval Date

    August 27, 1998

    Correspondence to:

    Resident Geologist South Porcupine, ON

    Assessment Files Library Sudbury, ON

    Recorded Holder(s) and/or Agent(s):

    Don T. Fudge NORTH BAY, ON, CAN

    LEO ALARIE AND SONS LIMITED TIMMINS, Ontario

    Page: 1Correspondence ID: 12757

  • st^ -

    - 2

    * vfj

    aa

    A ': -

    ** ,

    .. r-,

    'C y

    *,r"*

    1- *S

    K:

    '-""-

    ri-

    *w:

    - '

    r-yv

    * R

    f^•^

    •V^**

    "p

    *x

    "~-*,

    •- ;*

    J&'-*

    '--'

    ' '/".

    .-f

    L ;,

    \

    •/'

    *3b:

    X) ^J N3 s -

    f ^ -^y —\. D J 3 Ĵ ro 04 !\1

    f i\

    J CM

    \ ro

    o- yro

    o en 00 ro

    A

    ro Oro O (T)

    O

    O

    .i

    t \

    ro

    f!v

    ! r1

    h c C 0 L f\ CA rx

    V

    :'-^-

    f r- w

    :^13lf

    c.: v,

    ̂flli|::,

    :, -M

    ^ ̂

    ' l!;tl||

    7 .

    ., '

    -••••*t

    h-^

    ^-^

    ^^-

    fc^^i

    liiii^

    ^

    •" ^ i^

    ^s^^

    p^,ii

    ^ 'iltU

    SW

    f;^

    •t; *

    ••.^

    .*'-'

    ĵt^s'J

    -\*.'''

    f̂^^:^

    . v;p

    '^#S

    '^^

    'y""

    - .

    'f'.X

    'v'

    ^ S

    ^s

    -:5^--M

    tA

    ^'^'

    .^i:J

    ^^™?^?

    '™^(^

    Tr^i"*M'

    ^i^^i^i

    i"ii^pffjf

    S'p'Y^

    p^P

    ^x

    ip;M

    ^5-•"

    *.-:,

    -;M'-.

    -. ''r's

    t-w

    ^^r':'

    T-^-"

    ^"^*V

    f*^

    ";^^

    -HV

    -^—

    ——

    -——

    ——

    ——

    ——

    ir^—

    ——

    n'

    '^

    L . f

    W^

    i -, *

    i g

    t*V^

    A *"

    r T

    *'

    3

    iafc"

    ^?

    :i.::v

    *1T

    1 .C

    V.ji

    AM

    — —

    — —

    — —

    —J

    L f

    SU

    LM

    AN

    TO

    WN

    SH

    ! P

    T ^0 08

    o m S CD m -a (B oo 01

    (D

    QJ

    z-

    w pr

    2.

    O ^

    w""

    oi li m s M -^ V (A O

    D Z

    D

    z3 |

    5 i

    ~

    M

    !! o

    n **

    xz

    O

    3^

    z

    V- '

    gT

    i"

    ^

    5c

    *

    -^

    x^s

    xO

    -

    li ^

    24

    ^^

    *

    35

    ^

    ^^

    ^^

    H

    Z 5

    l

    *** r

    ~o vi -t 39 O

    1R

    *"

    0

    OO

    J

    O*"

    5e^

    i5I?

    r

    r*i

    Ti D

    ' w

    *".

    i

    (-6^

    S

    "2.

    Tt\ O

    i!

    *-. n

    fz'.

    "" 'S

    "o

    0

    m

    S^

    -s i

    ^ x

    C *

    L o

    Z * o*

    i^

    n o *

    s

    o v r

    5?:g

    -;X

    * S

    .

    O

    L. m

    Vt

    w l)O ^

    't*--

    m

    r t

    m

  • 368500 mE 5459200 mN

    l

    <o;

    CO CO LU (J CJ<

    UTM 368700 mE 5458678 mN

    XXX

    O O

    UTM370100 m! 5459200 mN

    -INSERTSOUTH BOUNDARY

    x x x 7 x x x x x x

    •c

    t

    1

    1

    *-^-(

    5

    i4— CN

    ,2 .

    , * - f

    ,6

    .

    C

    'A'

    OF QUARRY PERMIT

    X X X X X XUTM369695 mE 5458678 mN

    oo(O

    BLOCK MINING CLAIM #1224136

    (16 UNITS. 256 Ho)

    UTM368500 mE 5457600 mN

    CARGILL GEOGRAPHIC TOWNSHIP UTM370100 mE 5457600 mN

    600m

    NSERT - TEST HOLE PLAN

    l:2500

    SOUTH BOUNDARY

    OF QUARRY PERMIT

    7 5m

    A

    B

    C

    ^^

    4* ^ "^- z" 35 O

    2,

    3* —— S —— IH

    6,

    1

    1 — CN K)

    —— e —— e —— o

    i

    ^ JP r-i —— e —— o c

    i

    B'

    A'

    HOLE*|2345678910i 112131415

    OVB. (m)0.5m0.5m0.5m0.5m2.8( no brk)

    1 .2m1 .2mno brk.

    1 .Om2.0m2.0m0.5m0.5m2.0m2.0m

    LEGEND

    MINING CLAIM POST l

    MINING CLAIM BOUNDARY

    SWAMP

    42a07SH2001 2.18530 CARGILL 210

    Cll.nl; LEO ALARIE S SONS LIMITED

    Propwtu: CARGILL TOWNSHIP PROPERTYTill.: PHASE ONE

    OVERBURDEN TEST HOLEPLAN MAP MAP NO. l

    R.J.MEIKLE

    MAY 1998

    ONTARIOl:5000

    GEOPHYSICAL ENGINEERINGA

    SURVEYS INC.TIMM1NB. tMTWIO

  • JTM368500 mE 5459200 mN

    <CCL

    CO GO LLJ O O <

    lUTM370100 ml 5459200 mN

    UTM 368700 mE 5456678 mN

    l J/ f f f S f f

    O O (O

    SOUTH BOUNDARY

    x x x x x x;V

    u. T-S s s s s s

    STRIPPED" AREA (SEE INSET)

    200mS

    NSERT

    OF QUARRY PERMIT

    UTM 369695 mE 5458678 mN

    o oCD

    BLOCK MINING CLAIM #1224136

    (16 UNITS. 256 Ha)

    UTM368500 mE 5457600 mN

    CARGI_ GEOGRAPHIC TOWNSHIP UTM370100 mE 5457600 mN

    1600m

    42G07SW2001 2.18530 CARGILL 220

    0 + OON

    0 + 50S

    I+OOS

    I+50S

    2 + OOS

    SOUTH BOUNDARY

    OF QUARRY PERMIT

    STRIPPED AREA

    O O O oo O O O* * * l * * *VI Ul Ni N3 O1 VJen O tn o (-n o m^ ^ ^ m m m

    NSERT - STRlPPED AREA

    l:2500

    SAMPLE LOCATION: *t

    NOTE: SAMPLES l-5(incl) - GRANITIC GNEISS

    l 8561 6 Z

    LEGEND

    MINING CLAIM POST l

    MINING CLAIM BOUNDARY

    SWAMP

    STRIPPED AREA: o

    Cliwrt: LEO ALARIE S SONS LIMITED

    CARGILL TOWNSHIP PROPERTY

    T.U., PHASE TWO

    STRIPPING/GEOLOGICAL

    MAPPING PLAN MAP MAP NO.2' R.J.MEIKLE

    D. t.: MAY 1998

    ONTARl O

    :5000

    GEOPHYSICAL ENGINEERINGA

    SURVEYS INC.. CMiwio